IP Library Granted Patent US 8,170,523
Granted Patent B2
US 8,170,523 · App. 12/333,974 · Granted May 1, 2012

Super regenerative receiver and method of saving power of the same

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,170,523
App. No.
12/333,974
Granted
May 1, 2012
Kind
B2
Abstract

A low power super regenerative receiver and a method of reducing the power consumption of the low power super regenerative receiver are provided. The super regenerative receiver includes: an oscillator having a start-up time period starting oscillation that varies according to an existence of an input signal; and a power controller supplying power within the start-up time period of the oscillator.

Claims (29)

1. A super regenerative receiver comprising:

an oscillator having a start-up time period starting oscillation that varies according to an existence of an input signal;

an insulation amplifier injecting a signal into the oscillator and providing reverse isolation of the input signal from the oscillator;

an envelope detector detecting an envelope of the oscillator;

an amplifier amplifying the envelope, and

a power controller supplying power to the insulation amplifier, the oscillator, the envelope detector, and the amplifier within the start-up time period of the oscillator.

2. The super regenerative receiver of claim 1 , wherein the power controller uses a duty cycle to supply power, and a duty cycle ratio between a clock off period and clock on period of the duty cycle is changed by adjusting the frequency of the duty cycle.

3. The super regenerative receiver of claim 2 , wherein a power off period is extended until the frequency of the duty cycle is the same as a data rate of the input signal.

4. The super regenerative receiver of claim 1 , further comprising: a delay unit connected to the power controller and delaying the power supplied by the power controller,

wherein the oscillator is connected to the delay unit, and, if the power controller is connected to the insulation amplifier, the envelope detector, and the amplifier, the oscillator receives the delayed power through the delay unit.

5. The super regenerative receiver of claim 1 , wherein the oscillator adjusts an oscillation frequency with a calibration circuit.

6. A method of reducing power consumption of a super regenerative receiver comprising an oscillator having a start-up time period starting oscillation that varies according to an existence of an input signal, wherein the method comprises:

controlling power by supplying the power to the super regenerative receiver within the start-up time period of the oscillator, said controlling comprising:

providing a start-up time period starting oscillation that varies according to an existence of an input signal;

supplying power to the super regenerative receiver within the start-up time period of the oscillator;

injecting a signal into the oscillator and providing reverse isolation of the input signal from the oscillator;

detecting an envelope of the oscillator; and

amplifying the envelope.

7. The method of claim 6 , wherein the super regenerative receiver further comprises:

an insulation amplifier injecting a signal into the oscillator and providing reverse isolation of the input signal from the oscillator;

an envelope detector detecting an envelope of the oscillator; and

an amplifier amplifying the envelope,

wherein the controlling of the power comprises: supplying the power to the insulation amplifier, the oscillator, the envelope detector, and the amplifier within the start-up time period of the oscillator.

8. The method of claim 7 , wherein the oscillator adjusts an oscillation frequency with a calibration circuit.

9. The method of claim 7 , wherein the controlling of the power comprises:

supplying the power by using a duty cycle and changing a duty cycle ratio between a clock off period and clock on period of the duty cycle by adjusting the frequency of the duty cycle.

10. The method of claim 9 , wherein a power off period is extended until the frequency of the duty cycle is the same as a data rate of the input signal.

11. The method of claim 7 , further comprising: delaying the power generated in the controlling of the power,

wherein the power is supplied to the oscillator after the power is delayed, and the power is directly supplied to the insulation amplifier, the envelope detector; and the amplifier.

Assignments (2)
MERGER Recorded Oct 1, 2009
From: RESEARCH AND INDUSTRIAL COOPERATION GROUP, INFORMATION AND COMMUNICATIONS UNIVERSITY
To: KOREA ADVANCED INSTITUTE OF SCIENCE AND TECHNOLOGY (KAIST)
Reel/Frame 023312/0614 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2008
From: KANG, HOYONG; YU, XIAOHUA; KIM, JI EUN; NGUYEN, TRUNG KIEN; YOON, DAE YOUNG; KIM, NAE SOO; PYO, CHEOL SIG; HAN, SEOK KYUN; LEE, SANG GUG
To: ELECTRONICS AND TELECOMMUNICATIONS RESEARCH INSTITUTE; INFORMATION AND COMMUNICATIONS UNIVERSITY EDUCATIONAL FOUNDATION
Reel/Frame 022049/0049 →