IP Library Granted Patent US 7,878,247
Granted Patent B2
US 7,878,247 · App. 12/350,852 · Granted Feb 1, 2011

Methods for cleaning out horizontal wellbores using coiled tubing

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,878,247
App. No.
12/350,852
Granted
Feb 1, 2011
Kind
B2
Abstract

Methods for cleaning out horizontal wellbores using coiled tubing are provided for use during downhole operations. A coiled tubing having a bottom hole assembly is deployed into a horizontal wellbore. Fluid is circulated down the annulus of the wellbore and up the bottom hole assembly while the bottom hole assembly is moved upward at a selected rate and distance. This method may be used to remove downhole solids, such as formation sands and proppant.

Claims (47)

1. A method for cleaning out a horizontal wellbore using coiled tubing, the method comprising the steps of:

(a) inserting coiled tubing into the horizontal wellbore, the coiled tubing including a bottom hole assembly; and

(b) circulating fluid down an annulus of the horizontal wellbore and back up the coiled tubing while moving the bottom hole assembly and coiled tubing uphole at a selected rate and distance.

2. A method as defined in claim 1 , wherein step (a) further comprises at least perforating an interval of the horizontal wellbore.

3. A method as defined in claim 1 , wherein step (a) further comprises fracturing an interval of the horizontal wellbore.

4. A method as defined in claim 1 , wherein step (b) further comprises at least substantially removing solids from the horizontal wellbore.

5. A method as defined in claim 1 , wherein step (b) is conducted without removing the bottom hole assembly from a horizontal section of the horizontal wellbore.

6. A method as defined in claim 1 , wherein step (b) is conducted without removing the bottom hole assembly from the horizontal wellbore.

7. A method as defined in claim 1 , wherein step (b) is utilized to remove a portion of solids from the horizontal wellbore, the method further comprising the step of running the bottom hole assembly back into the horizontal wellbore and removing a remainder of the solids from the horizontal wellbore using fluid circulation.

8. A method for cleaning out a horizontal wellbore using coiled tubing, the method comprising the steps of:

(a) deploying coiled tubing into the horizontal wellbore, the coiled tubing including a bottom hole assembly;

(b) at least perforating a first interval of the horizontal wellbore;

(c) circulating fluid down an annulus of the horizontal wellbore and back up the coiled tubing while moving the bottom hole assembly and coiled tubing uphole at a selected rate and distance; and

(d) at least perforating a second interval of the horizontal wellbore.

9. A method as defined in claim 8 , wherein steps (b)-(d) are conducted without removing the bottom hole assembly from a horizontal section of the horizontal wellbore.

10. A method as defined in claim 8 , wherein steps (b)-(d) are conducted without removing the bottom hole assembly from the horizontal wellbore.

11. A method as defined in claim 8 , wherein step (c) further comprises removing solids from the horizontal wellbore.

12. A method as defined in claim 8 , wherein step (c) is utilized to remove a portion of solids from the horizontal wellbore, step (c) further comprising the step of running the bottom hole assembly back into the horizontal wellbore and removing a remainder of the solids from the horizontal wellbore using fluid circulation.

13. A method for cleaning out a horizontal wellbore using a coiled tubing, the method comprising the steps of:

(a) at least perforating a first interval of the horizontal wellbore; and

(b) circulating solids in the horizontal wellbore up the coiled tubing while moving the coiled tubing uphole.

14. A method as defined in claim 13 , where in step (b) a bottom hole assembly remains below a build section of the horizontal wellbore, the coiled tubing including the bottom hole assembly.

15. A method as defined in claim 13 , where in step (b) a bottom hole assembly remains in the horizontal wellbore, the bottom hole assembly being attached to the coiled tubing.

16. A method as defined in claim 13 , wherein the step of circulating the solids up the coiled tubing is achieved by circulating fluid down an annulus of the horizontal wellbore and back up a bottom hole assembly forming part of the coiled tubing, the annulus being located between the coiled tubing and casing.

17. A method as defined in claim 13 , the method further comprising the step of at least perforating a second interval of the horizontal wellbore without removing the coiled tubing from the horizontal wellbore.

18. A method as defined in claim 13 , wherein step (b) only removes a portion of the solids from the horizontal wellbore, the method further comprising the step of running the coiled tubing back into the horizontal wellbore and removing a remainder of the solids from the horizontal wellbore using fluid circulation.

19. A method for cleaning out a horizontal wellbore using coiled tubing, the method comprising the steps of:

(a) deploying coiled tubing into the horizontal wellbore, the coiled tubing including a bottom hole assembly;

(b) perforating and fracturing a first interval of the horizontal wellbore;

(c) circulating fluid down an annulus of the horizontal wellbore and back up the coiled tubing while moving the bottom hole assembly and coiled tubing uphole; and

(d) perforating and fracturing a second interval of the horizontal wellbore.

20. A method as defined in claim 19 , wherein step (c) further comprises the step of at least substantially removing a proppant bed from a horizontal section of the horizontal wellbore.

21. A method as defined in claim 19 , wherein step (b) further comprises the step of circulating fluid down the annulus of the horizontal wellbore and back up the coiled tubing after perforating is complete and before fracturing begins, thereby at least substantially removing residual abrasives from the horizontal wellbore.

22. A method as defined in claim 19 , whereby steps (b)-(d) are conducted without removing the bottom hole assembly from a horizontal section of the horizontal wellbore.

23. A method as defined in claim 19 , whereby steps (b)-(d) are conducted without removing the bottom hole assembly from the horizontal wellbore.

24. A method as defined in claim 19 , wherein step (c) only removes a portion of solids from the horizontal wellbore, step (c) further comprising the step of running the bottom hole assembly back into the horizontal wellbore and removing a remainder of the solids from the horizontal wellbore using fluid circulation.

25. A method for cleaning out a horizontal wellbore using coiled tubing, the method comprising the steps of:

(a) inserting coiled tubing into the horizontal wellbore, the coiled tubing having a lower end;

(b) after step (a), and while the lower end of the coiled tubing remains in the horizontal wellbore, introducing solids into an annulus of the horizontal wellbore;

(c) forming a bed of solids in the horizontal wellbore;

(d) circulating fluid down the annulus of the horizontal wellbore and back up the coiled tubing while moving the coiled tubing uphole at a selected rate and distance; and

(e) utilizing the circulated fluid to remove at least a portion of the bed of solids while moving uphole.

26. A method as defined in claim 25 , wherein step (c) further comprises the step of forming the bed of solids behind the lower end of the coiled tubing, the bed of solids extending upward toward a build section of the horizontal wellbore.

27. A method as defined in claim 25 , wherein step (b) further comprises the step of causing the lower end of the coiled tubing to remain in a horizontal section of the horizontal wellbore while introducing the solids.

28. A method as defined in claim 25 , the method further comprising the steps of:

running the end of the coiled tubing back into the horizontal wellbore; and

removing a remainder of the bed of solids from the horizontal wellbore using fluid circulation.

Assignments (6)
CHANGE OF NAME Recorded Feb 16, 2022
From: BAKER HUGHES, A GE COMPANY, LLC
To: BAKER HUGHES HOLDINGS LLC
Reel/Frame 059142/0921 →
CHANGE OF NAME Recorded Oct 6, 2017
From: BAKER HUGHES INCORPORATED
To: BAKER HUGHES, A GE COMPANY, LLC
Reel/Frame 044144/0920 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 22, 2010
From: BJ SERVICES COMPANY LLC
To: BAKER HUGHES INCORPORATED
Reel/Frame 025551/0266 →
MERGER Recorded Oct 29, 2010
From: BJ SERVICES COMPANY
To: BSA ACQUISITION LLC
Reel/Frame 025221/0171 →
CHANGE OF NAME Recorded Oct 29, 2010
From: BSA ACQUISITION LLC
To: BJ SERVICES COMPANY LLC
Reel/Frame 025221/0725 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 8, 2009
From: MISSELBROOK, JOHN GORDON; AITKEN, WILLIAM ARTHUR HUTTON; LI, JEFF
To: BJ SERVICES COMPANY
Reel/Frame 022079/0739 →