IP Library Granted Patent US 8,340,832
Granted Patent B1
US 8,340,832 · App. 12/368,295 · Granted Dec 25, 2012

Energy efficiency management system and method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,340,832
App. No.
12/368,295
Granted
Dec 25, 2012
Kind
B1
Abstract

Exemplary embodiments of the computerized management system for controlling energy consumption for energy consumers using a smart meter may include a database that contains contract provisions for energy consumers. Furthermore, exemplary embodiments of the system include a database interface adapted to allow the system to access the contract provisions to optimize energy consumption based upon available energy. The system may also include a managing data component that is adapted to manage data between the database and the smart meter. In exemplary embodiments, a communication network connecting the system to the database and the smart meter may be included. Additionally, some exemplary embodiments of the system include a protocol converting component that is adapted to act as an interface for application programming or protocol converting.

Claims (14)

1. A method for controlling energy consumption by energy consumers using a system for controlling energy consumption for energy consumers using smart meters, said method comprising the steps:

providing a computerized management system for controlling energy consumption for energy consumers using smart meters, said system comprising:

a database that contains contract provisions for energy consumers;

a database interface adapted to allow the system to access the contract provisions to optimize energy consumption based upon available energy;

a data managing component adapted to manage data between the database and the smart meter; and

a protocol converting component adapted to act as an interface for application programming or protocol converting;

matching a customer contract to an energy consumption signal in the system where the software product recognizes the smart meter location;

sending an action message to the customer smart meter from the system consistent with the energy consumption signal depicting an energy consumption level with the action required at the customer location;

sending an acknowledge signal that contains a customer data number back to the system from the customer smart meter;

receiving the acknowledge signal from the smart meter by the system;

sending a results message from the system to update the energy consumption signal.

2. The method of claim 1 , wherein the action message to the customer smart meter induces the smart meter to perform at least one of the following: block an incoming energy load, require on-site energy generation, or drop an energy load.

3. The method of claim 1 , further comprising the step of storing customer data in a results table to confirm the customer complied with customer contracts.

4. The method of claim 1 , wherein there are five different energy consumption levels.

Assignments (16)
SECURITY INTEREST Recorded Oct 26, 2021
From: VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.; ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.
To: UMB BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 057923/0782 →
SECURITY AGREEMENT Recorded Mar 3, 2020
From: ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.; VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.
To: CITIBANK, N.A.
Reel/Frame 052076/0874 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: JPMORGAN CHASE BANK, N.A.
To: VERTIV CORPORATION (F/K/A ALBER CORP.); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT CORPORATION); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT FREMONT, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT HUNTSVILLE, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT REDMOND CORP.); ELECTRICAL RELIABILITY SERVICES, INC.; VERTIV CORPORATION (F/K/A EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.); VERTIV CORPORATION (F/K/A LIEBERT CORPORATION)
Reel/Frame 052065/0666 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: JPMORGAN CHASE BANK, N.A.
To: VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT CORPORATION); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT HUNTSVILLE, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT REDMOND CORP.); VERTIV CORPORATION (F/K/A EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.); VERTIV CORPORATION (F/K/A LIEBERT CORPORATION); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT FREMONT, LLC)
Reel/Frame 052065/0757 →
CHANGE OF NAME Recorded Jun 13, 2019
From: LIEBERT CORPORATION
To: VERTIV CORPORATION
Reel/Frame 049460/0726 →
CHANGE OF NAME Recorded May 21, 2018
From: SANDIA CORPORATION
To: NATIONAL TECHNOLOGY & ENGINEERING SOLUTIONS OF SANDIA, LLC
Reel/Frame 046194/0499 →
ABL SECURITY AGREEMENT Recorded Mar 6, 2017
From: ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 041941/0363 →
SECURITY AGREEMENT Recorded Mar 2, 2017
From: ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 041944/0892 →
SECURITY AGREEMENT Recorded Dec 2, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040797/0615 →
SECURITY AGREEMENT Recorded Dec 1, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040783/0148 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 15, 2016
From: NACKE, BRADFORD; VANDONKELAAR, JON L
To: HULL & ASSOCIATES, INC.
Reel/Frame 040323/0611 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 15, 2016
From: GRID CONTROL LLC
To: HULL & ASSOCIATES
Reel/Frame 040323/0859 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 15, 2016
From: HULL AND ASSOCIATES
To: LIEBERT CORPORATION
Reel/Frame 040324/0166 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 15, 2016
From: JUSTICE, TED; KASPER, CRAIG E.; EISEMAN, MARK; HOLTOM, ANDREW
To: GRID CONTROL LLC
Reel/Frame 040323/0744 →
CONFIRMATORY LICENSE Recorded Jun 6, 2013
From: SANDIA CORPORATION
To: U.S. DEPARTMENT OF ENERGY
Reel/Frame 030572/0205 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2012
From: BORNEO, DANIEL R.
To: SANDIA CORPORATION
Reel/Frame 029502/0949 →