IP Library Granted Patent US 8,285,429
Granted Patent B2
US 8,285,429 · App. 12/430,820 · Granted Oct 9, 2012

Automatic estimation of train characteristics

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,285,429
App. No.
12/430,820
Granted
Oct 9, 2012
Kind
B2
Abstract

A system is provided for controlling a series of vehicles. In certain embodiments, the system includes a self-analysis/estimation system configured to control a first parameter of the series of vehicles to impart a resulting changing in a second parameter of the series of vehicles. The self-analysis/estimation system is configured to estimate a third parameter based on the first and second parameters, wherein the third parameter comprises weight, weight distribution, tractive effort, grade, or a combination thereof, associated with the series of vehicles.

Claims (12)

1. A locomotive system, comprising:

a locomotive control system comprising instructions disposed on a computer readable medium, the instructions comprising:

instructions for estimating a total weight of a series of vehicles based on a change in a total tractive effort and a resulting change in an acceleration of the series of vehicles;

instructions for estimating a tractive effort based on a change in the tractive effort and a resulting change in an acceleration of the series of vehicles;

instructions for estimating a weight distribution of the series of vehicles based on a change in a tractive effort over a known grade; and

instructions for optimizing parameters of a trip of the series of vehicles based on estimations of the total weight, the tractive effort, and the weight distribution.

2. The locomotive system of claim 1 , wherein the instructions for estimating total weight comprise estimating total mass as a ratio of the change in the tractive effort over the resulting change in the acceleration of the series of vehicles, wherein a velocity of the series of vehicles and a grade of a route traversed by the series of vehicles are assumed constant.

3. The locomotive system of claim 2 , wherein the change in tractive effort is based only on one or more known locomotive units while any unknown locomotive units are held at a constant tractive effort.

4. The locomotive system of claim 1 , wherein the instructions for estimating the tractive effort are based on a known total weight of the series of vehicles, wherein a velocity of the series of vehicles and a grade of a route traversed by the series of vehicles are assumed constant.

5. The locomotive system of claim 1 , wherein the instructions for estimating the weight distribution comprises estimating a mass of a portion of the series of vehicles as a ratio of the change in tractive effort over the change in grade, wherein the change in tractive effort results from holding velocity constant for the series of vehicles in response to the change in grade.

6. The locomotive system of claim 1 , wherein the instructions for optimizing parameters of the trip comprises instructions for optimizing fuel consumption, exhaust emissions, time to destination, distribution of forces within the vehicles, handling of the vehicles, or a combination thereof.

7. The locomotive system of claim 1 , comprising an engine, a locomotive having the engine, a train having the locomotive, or a combination thereof, coupled to the locomotive control system.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2018
From: GENERAL ELECTRIC COMPANY
To: GE GLOBAL SOURCING LLC
Reel/Frame 047736/0140 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 22, 2009
From: KUMAR, AJITH KUTTANNAIR
To: GENERAL ELECTRIC COMPANY
Reel/Frame 022854/0972 →