IP Library Granted Patent US 7,946,157
Granted Patent B2
US 7,946,157 · App. 12/522,481 · Granted May 24, 2011

Method and device to measure, test and/or monitor turbine performance

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,946,157
App. No.
12/522,481
Granted
May 24, 2011
Kind
B2
Abstract

A set of data is measured reliably and accurately to test, operate and/or monitor the performance of turbines. It is proposed to determine the performance parameters of a turbine applicable to its entire operating envelope and for a condition when it is producing net output power, by measuring its characteristic performance parameters in the mode of no net output-power production.

Claims (40)

1. Method of monitoring the condition of a turbine, comprising the steps of:

determining an initial no net output power characteristic for the turbine;

allowing the turbine to run for an amount of time;

determining a new no net output power characteristic for the turbine; and

comparing the new no net output power characteristic with the initial no net output power characteristic, wherein differences in the no net output power characteristics give indications about the condition of the turbine.

2. Method according to claim 1 , further comprising the step of determining performance of the turbine for an operating mode where the turbine produces net power based on the no net output power characteristics.

3. Method according to claim 2 , wherein determining the initial no net output power characteristic comprises:

measuring one or more characteristic performance parameters, selected from the flow (Q 0 , Q N ), turbine speed (N 0 ) and/or head (H 0 , H N ), or any combination of these, of the turbine in an operating mode where the turbine produces no net output power;

producing the no net output power verification characteristic of the turbine based on the measured one or more characteristic performance parameters.

4. Method according to claim 3 , wherein determining the new no net output power characteristic for the turbine comprises:

measuring one or more characteristic performance parameters, selected from the flow (Q 0 , Q N ), turbine speed (N 0 ) and/or head (H 0 , H N ), or any combination of these, of the turbine in the operating mode where the turbine produces no net output power;

producing the no net output power characteristic of the turbine based on the measured one or more characteristic performance parameters.

5. Method according to claim 2 , further comprising the step of determining the condition of the turbine based on the differences between the new no net output power characteristic and the initial no net output power characteristic.

6. Method according to claim 1 , wherein determining the initial no net output power characteristic comprises:

measuring one or more characteristic performance parameters, selected from the flow (Q 0 , Q N ), turbine speed (N 0 ) and/or head (H 0 , H N ), or any combination of these, of the turbine in an operating mode where the turbine produces no net output power;

producing the no net output power verification characteristic of the turbine based on the measured one or more characteristic performance parameters.

7. Method according to claim 6 , wherein determining the new no net output power characteristic for the turbine comprises:

measuring one or more characteristic performance parameters, selected from the flow (Q 0 , Q N ), turbine speed (N 0 ) and/or head (H 0 , H N ), or any combination of these, of the turbine in the operating mode where the turbine produces no net output power;

producing the no net output power characteristic of the turbine based on the measured one or more characteristic performance parameters.

8. Method according to claim 7 , further comprising the step of determining the condition of the turbine based on the differences between the new no net output power characteristic and the initial no net output power characteristic.

9. Method according to claim 6 , further comprising the step of determining the condition of the turbine based on the differences between the new no net output power characteristic and the initial no net output power characteristic.

10. Method according to claim 1 , further comprising the step of determining the condition of the turbine based on the differences between the new no net output power characteristic and the initial no net output power characteristic.

11. Method according to claim 1 , wherein said amount of time during which the turbine is allowed to run is a pre-determined amount of time.

12. Method according to claim 1 , wherein the at certain time intervals new no net output power characteristics are determined so as to monitor the performance of the turbine over time.

13. Method according to claim 1 , wherein the no net output power characteristics are determined while the turbine is operated in a no-load condition under known input values for flow, head, hydraulic energy and fluid properties during measurement of the one or more performance parameters.

14. Method according to claim 13 , further comprising:

determining an intersection point between the measured no-load characteristic of the turbine and a constant-power input curve; and

comparing the intersection point to a reference intersection point between an earlier measured no-load characteristic of the turbine and the constant-power input curve so as to determine if hydraulic losses have increased or decreased.

15. Method according to claim 1 , wherein the no net output power characteristics are determined while the turbine is operated in a no-speed condition while being subjected to known input values for flow, head, hydraulic energy and fluid properties during measurement of the performance parameters.

16. Turbine system comprising:

a turbine drivable by a fluid flow, which turbine has an output shaft to which it delivers an output power during operation;

measuring means arranged at the turbine for measuring operational parameters of the turbine;

a monitoring unit for monitoring the condition of the turbine train, which monitoring unit is connected to the measuring means, which monitoring unit comprises a memory in which an initial no net output power characteristic for the turbine is stored, as well as computing means to calculate a new no net output power characteristic of the turbine train based on the measured operational parameters, and a comparer to compare the new no net output power characteristic with the initial no net output power characteristic.

17. Turbine system according to claim 16 , further comprising

a turbine control unit connected to the monitoring unit, and arranged to generate control signals for controlling the operation of the turbine;

wherein the monitoring unit is adapted to generate one or more signals representative for the performance and/or condition of the turbine which are provided to the control unit.

18. Turbine system according to claim 16 , wherein the turbine is comprised in a turbine-generator train, which further comprises a generator connected to the output shaft, for transforming the output power delivered by the turbine at the output shaft into electrical energy.

19. Turbine system according to claim 16 , wherein the turbine is comprised in a turbine-generator train, which further comprises a generator connected to the output shaft, for transforming the output power delivered by the turbine at the output shaft into electrical energy, and further comprising

a turbine control unit connected to the monitoring unit, and arranged to generate control signals for controlling the operation of the turbine-generator train; wherein the monitoring unit is adapted to generate one or more signals representative for the performance and/or condition of the turbine-generator train which are provided to the control unit.

20. Turbine system of claim 16 , wherein said operational parameters are selected from the group consisting of flow (Q 0 , Q N ), turbine speed (N 0 ) and head (H 0 , H N ).

Assignments (2)
CHANGE OF NAME Recorded Mar 7, 2022
From: SHELL OIL COMPANY
To: SHELL USA, INC.
Reel/Frame 059694/0819 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 8, 2009
From: HABETS, GILBERT LUCIEN GERTRUD MARIE
To: SHELL OIL COMPANY
Reel/Frame 022929/0508 →