IP Library Granted Patent US 8,309,019
Granted Patent B2
US 8,309,019 · App. 12/526,888 · Granted Nov 13, 2012

Powder metal forging and method and apparatus of manufacture

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,309,019
App. No.
12/526,888
Granted
Nov 13, 2012
Kind
B2
Abstract

A method of forming a powder metal forging, including the steps of: forming a preform including a sintered powder metal composition; inserting the preform in a die set having a bottom die and a top die, the die set defining a forge form therewithin, the die set being in a closed position wherein the top die is contacting the bottom die; and compressing the preform in the forge form using an upper punch and a lower punch, the compressing step resulting in a formed part. The closed die set minimizes or eliminates flash in the formed part, particularly in the contoured surfaces, which allows the forging to be through hardened by direct quenching after the forging operation, without the need to remove hardened flash from these surfaces.

Claims (30)

1. A method of forming a powder metal forging, the method comprising:

forming a preform including a sintered powder metal composition;

inserting said preform in a die set having a bottom die and a top die which, during insertion of said preform, are in a closed position wherein said top die is contacting said bottom die, said die set defining a forge form therewithin; and

compressing said preform in said forge form using an upper punch and a lower punch, said compressing step resulting in a formed part.

2. The method of claim 1 , further including the step of raising said top die from said bottom die thereby creating an interstice between said top die and said bottom die.

3. The method of claim 2 , further including the step of stripping said formed part from said bottom die into said interstice using said lower punch.

4. The method of claim 3 , wherein said lower punch includes a snag pin inserted into an internal feature of said formed part.

5. The method of claim 3 , further including the step of ejecting said formed part from said die set.

6. The method of claim 5 , the compressing step further including heating the at least one of the top die and the bottom die and the method further including the step of quenching the formed part immediately after the step of ejecting.

7. The method of claim 1 , wherein said preform is a noncylindrical preform.

8. The method of claim 7 , wherein said noncylindrical preform is comprised of a first end; a second end opposed to said first end; an outer contour connecting said first end and said second end; said outer contour including a plurality of longitudinal projections and a plurality of longitudinal depressions, each of said plurality of longitudinal projections being separated from another of said plurality of longitudinal projections by a corresponding one of said plurality of longitudinal depressions; and an inner contour connecting said first end and said second end, said inner contour having a longitudinal keyway and a plurality of longitudinal splines.

9. The method of claim 7 , further including the step of heating at least one of said bottom die and said top die using a heating fluid approximately between 400° F. and 600° F.

10. The method of claim 1 , wherein said preform has a density in a range of approximately between 6.85 g/cm 3 and 7.4 g/cm 3 .

11. The method of claim 10 , wherein said preform has a density in a range of approximately between 6.85 g/cm 3 and 7.0 g/cm 3 .

12. The method of claim 1 , the compressing step further including using cylinders to apply pressure to the die set to maintain closed contact between the top die and bottom die.

13. A method of forming a powder metal forging, the method comprising:

forming a preform including a sintered powder metal composition;

inserting said preform in a die set having a bottom die and a top die, said die set defining a forge form therewithin, said die set being in a closed position wherein said top die is contacting said bottom die;

compressing said preform in said forge form using an upper punch and a lower punch, said compressing step resulting in a formed part;

raising said top die from said bottom die thereby creating an interstice between said top die and said bottom die; and

stripping said formed part from said bottom die into said interstice using said lower punch, in which the lower punch includes a snag pin inserted into an internal feature of said formed part.

14. A method of forming a powder metal forging, the method comprising:

forming a preform including a sintered powder metal composition;

inserting said preform in a die set having a bottom die and a top die, said die set defining a forge form therewithin, said die set being in a closed position wherein said top die is contacting said bottom die; and

compressing said preform in said forge form using an upper punch and a lower punch, said compressing step resulting in a formed part;

wherein said preform is a noncylindrical preform is comprising:

a first end,

a second end opposed to said first end,

an outer contour connecting said first end and said second end, said outer contour including a plurality of longitudinal projections and a plurality of longitudinal depressions, each of said plurality of longitudinal projections being separated from another of said plurality of longitudinal projections by a corresponding one of said plurality of longitudinal depressions, and

an inner contour connecting said first end and said second end, said inner contour having a longitudinal keyway and a plurality of longitudinal splines.

Assignments (3)
SECURITY INTEREST Recorded Apr 2, 2026
From: AMERICAN AXLE & MANUFACTURING, INC.; GKN SINTER METALS, LLC; GKN DRIVELINE NORTH AMERICA, INC.; GKN DRIVELINE NEWTON, LLC; HOEGANAES CORPORATION
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 075331/0836 →
SECURITY INTEREST Recorded Apr 1, 2026
From: AMERICAN AXLE & MANUFACTURING, INC.; GKN SINTER METALS, LLC; GKN DRIVELINE NORTH AMERICA, INC.; GKN DRIVELINE NEWTON, LLC; HOEGANAES CORPORATION
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION,, AS NOTES COLLATERAL AGENT
Reel/Frame 075325/0112 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 12, 2009
From: CHIESA, ALFRED J.; LENHART, DAVID E., JR.
To: GKN SINTER METALS, LLC
Reel/Frame 023091/0957 →