IP Library Granted Patent US 8,141,638
Granted Patent B2
US 8,141,638 · App. 12/529,661 · Granted Mar 27, 2012

Fracturing method and apparatus utilizing gelled isolation fluid

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,141,638
App. No.
12/529,661
Granted
Mar 27, 2012
Kind
B2
Abstract

A method and apparatus for fracturing a formation containing a wellbore comprising the steps of (a) injecting a gel into the wellbore; (b) permitting the gel to increase in viscosity and (c) fracturing the formation in the vicinity of the gel.

Claims (33)

1. A method of isolating a zone in a formation to be fractured comprising the steps of:

(a) first injecting a gel into a wellbore;

(b) introducing a fracturing fluid into the gel; and

(c) fracturing the formation in an area adjacent to the area of introduction of the fracturing fluid into the gel whereby the gel minimizes the migration of the fracturing fluid along the wellbore away from the area of the fracture.

2. The method according to claim 1 , further including the step of permitting the gel to increase in viscosity prior to the fracturing step.

3. The method according to claim 2 , wherein the gel forms a plug in the wellbore.

4. The method according to claim 3 , including the step of introducing a fluid into the wellbore prior to injection of the gel.

5. The method according to claim 4 , wherein the gel comprises a base fluid and a viscosifying agent.

6. The method according to claim 5 , wherein the base fluid is water or hydrocarbon based.

7. The method according to claim 5 , wherein the viscosifying agent is a viscosifying polymer or surfactant.

8. The method according to claim 5 , wherein the viscosifying agent is guar, hydroxyl ethyl cellulose or derivatives thereof.

9. The method according to claim 5 , wherein the gel includes a crosslinker.

10. The method according to claim 9 , wherein the crosslinker is a multivalent metal ion.

11. The method according to claim 10 , wherein the multivalent metal ion is borate, antimony, zirconium, chrome, titanium or iron.

12. The method according to claim 9 , wherein the gel further includes one for more of a clay stabilizing, salt, methanol, pH adjustors, biocide and flowback enhancer.

13. The method according to claim 9 , wherein the gel further includes a breaker.

14. The method according to claim 13 , wherein the breaker is an enzyme or oxidizer.

15. The method according to claim 13 , wherein the breaker is a persulfate, peroxide, or an acid.

16. The method according to claim 13 wherein the breaker is a pH buffer or caustic fluid.

17. The method according to claim 4 wherein the gel has a yield strength sufficient to minimize movement of fracturing fluid to another part of the well.

18. The method according to claim 1 , wherein the gel does not enter the formation or any fractures formed in the formation.

19. The method according to claim 1 , wherein the gel degrades and is removed from the wellbore after fracturing.

20. A method of isolating a zone in a formation to be fractured comprising the steps of:

(a) inserting tubing into a wellbore to a first location in the wellbore;

(b) introducing a gel into the wellbore via the tubing at the first location;

(c) after step (b), introducing a fracturing fluid into the wellbore via the tubing to fracture the formation at the first location whereby the gel minimizes the migration of the fracturing fluid along the wellbore to isolate the fracture to the first location.

21. The method according to claim 20 , further including the step of introducing a fluid into the wellbore prior to the injection of the gel.

22. The method according to claim 20 , further including the step of permitting the gel to increase in viscosity.

23. The method according to claim 20 , wherein the fracturing fluid is introduced into the gel.

24. The method according to claim 20 , further including the step of moving the tubing to a second location and repeating step (c).

25. The method according to claim 24 further including the step of introducing additional gel prior to repeating step (c).

26. The method according to claim 20 , wherein the gel does not substantially enter the formation or any fractures formed in the formation.

27. The method according to claim 20 , wherein the gel degrades and is removed from the wellbore after fracturing.

Assignments (3)
SECURITY INTEREST Recorded Jun 2, 2022
From: FEDORA, BRADLEY P.D.
To: OLYMPIA TRUST COMPANY
Reel/Frame 060087/0101 →
SECURITY INTEREST Recorded Jan 13, 2016
From: TRICAN WELL SERVICE LTD.
To: COMPUTERSHARE TRUST COMPANY OF CANADA
Reel/Frame 037482/0702 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2011
From: DUSTERHOFT, DALE; BROWNE, DAVID; VAUGHAN, JASON; LUK, SAM; TULISSI, MICHAEL
To: TRICAN WELL SERVICE, LTD.
Reel/Frame 027338/0828 →