IP Library Granted Patent US 8,328,902
Granted Patent B2
US 8,328,902 · App. 12/530,096 · Granted Dec 11, 2012

Method of estimating the dust load of an ESP, and a method and a device of controlling the rapping of an ESP

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,328,902
App. No.
12/530,096
Granted
Dec 11, 2012
Kind
B2
Abstract

A device and method for controlling the rapping of at least one collecting electrode plate ( 30 ) of an electrostatic precipitator ( 1 ) is provided. The device controls such rapping by applying, by means of a power source ( 32 ), a voltage between at least one collecting electrode plate ( 30 ) and at least one discharge electrode ( 28 ). The sparking rate between the at least one collecting electrode plate ( 30 ) and at least one discharge electrode ( 28 ) is then measured, with the rapping of the at least one collecting electrode plate ( 30 ) controlled using the measured present sparking rate.

Claims (25)

1. A method of controlling the rapping of at least one collecting electrode plate of an electrostatic precipitator, the method comprising

applying, by means of a power source, a voltage between said at least one collecting electrode plate and at least one discharge electrode,

measuring the sparking rate between said at least one collecting electrode plate and said at least one discharge electrode, and

controlling rapping of said at least one collecting electrode plate to begin at a point in time based upon a selected control sparking rate.

2. A method according to claim 1 , wherein said step of controlling, using the measured sparking rate, the rapping of said at least one collecting electrode plate, further comprises adjusting the point in time of initiating a rapping event with respect to a selected control sparking rate.

3. A method according to claim 1 , wherein the rapping of said at least one collecting electrode plate is controlled to occur when the measured sparking rate reaches the selected control sparking rate.

4. A method according to claim 1 , wherein a rapping rate is adjusted for the purpose of minimizing the difference between a selected control sparking rate and the measured sparking rate at which rapping of said collecting electrode plate is initiated.

5. A method according to claim 1 , wherein an upper safety limit on sparking rate is utilized, said upper safety limit on sparking rate being higher than the selected control sparking rate, a rapping event being initiated when the measured sparking rate reaches the upper safety limit on sparking rate.

6. A method of estimating the present load of dust particles existing on at least one collecting electrode plate of an electrostatic precipitator, the method comprising

applying, by means of a power source, a voltage between said at least one collecting electrode plate and at least one discharge electrode,

measuring the sparking rate between said at least one collecting electrode plate and said at least one discharge electrode, and

estimating the load of dust particles on said at least one collecting electrode plate using the measured sparking rate and controlling rapping of said at least one collecting electrode plate to begin at a point in time based upon the measured sparking rate.

7. A device for estimating the load of dust particles on at least one collecting electrode plate of an electrostatic precipitator,

said device comprising

said at least one collecting electrode plate, at least one discharge electrode, and a power source adapted for applying a voltage between said at least one collecting electrode and said at least one discharge electrode,

a measurement device adapted for measuring the sparking rate between said at least one collecting electrode plate, and said at least one discharge electrode, and

an estimating device which is adapted for estimating the load of dust particles on said at least one collecting electrode plate using the measured sparking rate and a control device which is adapted for controlling rapping of said at least one collecting electrode plate to begin at a point in time based upon the measured sparking rate.

8. A device according to claim 7 , wherein said measurement device includes a control unit controlling said power source.

9. A device for controlling the rapping of at least one collecting electrode plate of an electrostatic precipitator, said device comprising

said at least one collecting electrode plate, at least one discharge electrode, and a power source adapted for applying a voltage between said at least one collecting electrode plate and said at least one discharge electrode,

a measurement device adapted for measuring the sparking rate between said at least one collecting electrode plate, and said at least one discharge electrode, and

a control device which is adapted for controlling the rapping of said at least one collecting electrode plate to begin at a point in time based upon the measured sparking rate.

10. A device according to claim 9 , wherein said control device is further adapted for adjusting the point in time of initiating a rapping event with respect to a selected control sparking rate.

11. A device according to claim 9 , wherein said control device includes a controller which is adapted for controlling a rapping rate to minimise the difference between a selected control sparking rate and the measured sparking rate at which rapping occurs.

12. A device according to claim 9 , wherein said control device is adapted for initiating the rapping of said at least one collecting electrode plate when the measured sparking rate reaches a selected control sparking rate.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 29, 2022
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: ANDRITZ AKTIEBOLAG
Reel/Frame 060358/0218 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 21, 2009
From: BOYDEN, SCOTT A.; KARLSSON, ANDERS
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 023404/0563 →