IP Library Granted Patent US 8,372,222
Granted Patent B2
US 8,372,222 · App. 12/572,828 · Granted Feb 12, 2013

Method of producing locally austempered ductile iron

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,372,222
App. No.
12/572,828
Granted
Feb 12, 2013
Kind
B2
Abstract

A system and method for producing locally austempered ductile iron includes a computer program for closely controlling the heating and cooling of an iron part or workpiece. The process allows for the austempering of a relatively low cost iron workpiece to produce significantly higher quality end products. The locally austempered regions may be formed to a substantial controlled depth.

Claims (37)

1. A method comprising the steps of:

providing a heat transfer profile computer program which is based on simulation engineering analysis which makes use of computer modeling of a given part geometry to develop a thermal process control which includes a heat transfer profile for precisely controlling pertinent processing parameters for heating a localized region of a ductile iron part having the given part geometry; and

controlling a heating device with the program to heat the localized region of the ductile iron part to an austenitizing temperature.

2. The method of claim 1 wherein the step of controlling comprises the step of controlling electric power applied to the heating device to provide a first stage of rapid power increase followed by a second stage in which the power is decreased in accordance with a second order mathematical function.

3. The method of claim 1 wherein the step of controlling comprises the step of controlling the heating device with the program to maintain the localized region at an austenitizing temperature which is below and within 100° F. of an incipient melting temperature of the localized region.

4. The method of claim 1 further comprising the step of cooling the localized region from the austenitizing temperature to an austempering temperature to form ausferrite in the localized region.

5. The method of claim 4 wherein the step of cooling comprises the step of cooling the localized region in accordance with the computer program from the austenitizing temperature to the austempering temperature to form ausferrite in the localized region.

6. The method of claim 5 wherein the step of cooling comprises the step of cooling the localized region in accordance with the computer program from the austenitizing temperature at a rate sufficient to avoid the formation of pearlite to a temperature above martensite formation temperature.

7. The method of claim 6 further comprising the step of holding the temperature of the localized region in accordance with the computer program at the temperature above martensite formation temperature for a time suitable to allow for the formation of ausferrite in the localized region.

8. The method of claim 7 wherein the step of holding comprises the step of holding the temperature of the localized region within a range of 400 to 449° F.

9. The method of claim 4 wherein the step of cooling comprises the step of spraying a liquid quench medium on the part.

10. The method of claim 9 wherein the step of spraying comprises the steps of moving a mixture of the liquid quench medium and a gas through a spray nozzle to create a spray; and directing the spray toward the part.

11. The method of claim 4 wherein the localized region comprises by volume at least 80% ausferrite.

12. The method of claim 11 wherein the localized region comprises by volume at least 85% ausferrite.

13. The method of claim 12 wherein the localized region comprises by volume at least 90% ausferrite.

14. The method of claim 11 wherein the ductile iron part prior to the step of controlling has a microstructure having a ratio of ferrite to pearlite greater than 1:1.

15. The method of claim 4 wherein the ductile iron part prior to the step of controlling has a microstructure having a ratio of ferrite to pearlite greater than 1:1.

16. The method of claim 15 wherein the ratio of ferrite to pearlite is at least 4:1.

17. The method of claim 4 wherein the steps of providing, controlling and cooling result in transforming the ductile iron part into a transformed part comprising a base formed of one of ferritic iron, ferritic/pearlitic iron and pearlitic iron, with the localized region serving as a localized outer layer of ausferrite on the base.

18. The method of claim 17 wherein the localized outer layer of ausferrite has a depth of at least 3.0 millimeters.

19. The method of claim 18 wherein the depth is at least 4.0 millimeters.

20. The method of claim 19 wherein the depth is at least 5.0 millimeters.

21. The method of claim 3 wherein the austenitizing temperature is at least 2000° F.

22. The method of claim 21 further comprising the step of cooling the localized region from the austenitizing temperature to an austempering temperature to form ausferrite in the localized region so that the localized region comprises by volume at least 80% ausferrite;

wherein the ductile iron part prior to the step of controlling has a microstructure having a ratio of ferrite to pearlite greater than 1:1; and

the steps of providing, controlling and cooling result in transforming the ductile iron part into a transformed part comprising a base with a microstructure having a ratio of ferrite to pearlite greater than 1:1, with the localized region serving as a localized outer layer of ausferrite on the base.

23. The method of claim 22 wherein the localized region comprises by volume at least 95% ausferrite.

24. The method of claim 23 wherein the ratio of ferrite to pearlite of the ductile iron part prior to the step of controlling is at least 4:1; and the ratio of ferrite to pearlite of the base is at least 4:1.

25. The method of claim 21 wherein the austenitizing temperature is below and within 60° F. of the incipient melting temperature of the localized region.

26. The method of claim 9 wherein the step of cooling comprises the step of controlling a sprayer assembly with the computer program to spray the liquid quench medium on the part at a first rate; and subsequently controlling the sprayer assembly with the computer program to spray the liquid quench medium on the part at a second reduced rate.

27. The method of claim 13 wherein the localized region comprises by volume at least 95% ausferrite.

28. The method of claim 14 wherein the steps of providing, controlling and cooling result in transforming the ductile iron part into a transformed part comprising a base with a microstructure having a ratio of ferrite to pearlite greater than 1:1, with the localized region serving as a localized outer layer of ausferrite on the base.

29. The method of claim 28 wherein the step of controlling comprises the step of controlling the heating device with the program to maintain the localized region at an austenitizing temperature which is below and within 100° F. of an incipient melting temperature of the localized region.

30. The method of claim 29 wherein the localized region comprises by volume at least 95% ausferrite.

31. The method of claim 30 wherein the ratio of ferrite to pearlite of the ductile iron part prior to the step of controlling is at least 4:1; and the ratio of ferrite to pearlite of the base is at least 4:1.

32. The method of claim 3 wherein the austenitizing temperature exceeds 2100 20 F.

33. The method of claim 32 wherein the austenitizing temperature is below and within 60° F. of the incipient melting temperature of the localized region.

Assignments (8)
SECURITY INTEREST Recorded Jul 31, 2025
From: AJAX TOCCO MAGNETHERMIC CORPORATION
To: COMPUTERSHARE TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
Reel/Frame 071897/0979 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 24, 2014
From: AJAX TOCCO MAGNETHERMIC CORPORATION
To: AJAX TOCCO MAGNETHERMIC CORPORATION; APPLIED PROCESS, INC.
Reel/Frame 033384/0500 →
NUNC PRO TUNC ASSIGNMENT Recorded Jul 23, 2014
From: HAYRYNEN, KATHY L.
To: AJAX TOCCO MAGNETHERMIC CORPORATION
Reel/Frame 033374/0794 →
NUNC PRO TUNC ASSIGNMENT Recorded May 13, 2013
From: MADEIRA, ROBERT J.
To: AJAX TOCCO MAGNETHERMIC CORPORATION
Reel/Frame 030400/0211 →
SECURITY AGREEMENT Recorded Mar 26, 2012
From: AJAX TOCCO MAGNETHERMIC CORPORATION; ILS TECHNOLOGY LLC; PARK-OHIO INDUSTRIES, INC.; RB&W MANUFACTURING LLC; SNOW DRAGON LLC; TOCCO, INC.; RB&W LTD.; FLUID ROUTING SOLUTIONS, INC.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 027923/0635 →
RELEASE OF ASSIGNMENT FOR SECURITY OF PATENTS Recorded Apr 8, 2011
From: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
To: AJAX TOCCO MAGNETHERMIC CORPORATION; ATBD, INC.; BLUE FALCON TRAVEL, INC.; COLUMBIA NUT & BOLT LLC; CONTROL TRANSFORMER, INC.; FECO, INC.; FORGING PARTS & MACHINING COMPANY; GATEWAY INDUSTRIAL SUPPLY LLC; GENERAL ALUMINUM MFG. COMPANY; ILS TECHNOLOGY LLC; INDUCTION MANAGEMENT SERVICES, LLC; INTEGRATED HOLDING COMPANY; INTEGRATED LOGISTICS HOLDING COMPANY; INTEGRATED LOGISTICS SOLUTIONS, INC.; LALLEGRO, INC.; LEWIS & PARK SCREW & BOLT COMPANY; PARK OHIO FORGED & MACHINED PRODUCTS LLC.; PARK-OHIO INDUSTRIES, INC.; PARK-OHIO PRODUCTS, INC.; PHARMACEUTICAL LOGISTICS, INC.; PHARMACY WHOLESALE LOGISTICS, INC.; P-O REALTY LLC; PRECISION MACHINING CONNECTION LLC; RB&W MANUFACTURING LLC; RED BIRD, INC.; SNOW DRAGON LLC; SOUTHWEST STEEL PROCESSING LLC; ST HOLDING CORP.; STMX, INC.; SUMMERSPACE, INC.; SUPPLY TECHNOLOGIES LLC; SUPPLY TECHNOLOGIES (NY), INC.; THE AJAX MANUFACTURING COMPANY; THE CLANCY BING COMPANY; TOCCO, INC.; WB&R ACQUISITION COMPANY, INC.; RB&W LTD.; TW MANUFACTURING CO.; POVI L.L.C.
Reel/Frame 026100/0611 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2011
From: PFAFFMANN, GEORGE D.; KEOUGH, JOHN R.; BIXLER, CHRISTOPHER A.
To: AJAX TOCCO MAGNETHERMIC CORPORATION
Reel/Frame 026020/0428 →
SECURITY AGREEMENT Recorded Mar 15, 2010
From: AJAX TOCCO MAGNETHERMIC CORPORATION; ATBD, INC.; BLUE FALCON TRAVEL, INC.; COLUMBIA NUT & BOLT LLC; CONTROL TRANSFORMER, INC.; FECO, INC.; FORGING PARTS & MACHINING COMPANY; GATEWAY INDUSTRIAL SUPPLY LLC; GENERAL ALUMINUM MFG. COMPANY; ILS TECHNOLOGY LLC; INDUCTION MANAGEMENT SERVICES, LLC; INTEGRATED HOLDING COMPANY; INTEGRATED LOGISTICS HOLDING COMPANY; INTEGRATED LOGISTICS SOLUTIONS, INC.; LALLEGRO, INC.; LEWIS & PARK SCREW & BOLT COMPANY; PARK-OHIO FORGED & MACHINED PRODUCTS LLC; PARK-OHIO INDUSTRIES, INC.; PARK-OHIO PRODUCTS, INC.; PHARMACEUTICAL LOGISTICS, INC.; PHARMACY WHOLESALE LOGISTICS, INC.; P-O REALTY LLC; PRECISION MACHINING CONNECTION LLC; RB&W MANUFACTURING LLC; RED BIRD, INC.; SNOW DRAGON LLC; SOUTHWEST STEEL PROCESSING LLC; ST HOLDING CORP.; STMX, INC.; SUMMERSPACE, INC.; SUPPLY TECHNOLOGIES LLC; SUPPLY TECHNOLOGIES (NY), INC.; THE AJAX MANUFACTURING COMPANY; THE CLANCY BING COMPANY; TOCCO, INC.; WB&R ACQUISITION COMPANY, INC.; POVI L.L.C.; RB&W LTD.; TW MANUFACTURING CO.
To: JPMORGAN CHASE BANK, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 024079/0136 →