IP Library Granted Patent US 8,607,582
Granted Patent B2
US 8,607,582 · App. 12/604,003 · Granted Dec 17, 2013

Controlling chilled state of a cargo

Inventors: Ole Thøgersen (Nyborg, DK); Allan Dyrmose (Bogense, DK); Dan Vad Steffensen (Spentrup, DK)
Assignees: Thermo King Corporation; Johnson Controls Technology Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,607,582
App. No.
12/604,003
Granted
Dec 17, 2013
Kind
B2
Abstract

A refrigeration system for a container for refrigerating chilled cargo includes a compressor, a condenser, and an evaporator connected in series. The system further includes a heater and sensors configured to sense the temperature of the supply air and the temperature of the return air. A controller is programmed to determine one of a requirement for heating and a requirement for cooling based on the temperature of the return air and the temperature of the supply air. The controller is programmed to activate the evaporator fan when a requirement for heating is determined and to increase the speed of the evaporator fan when increased heating is determined. The controller is also programmed to activate the compressor and the evaporator fan when a requirement for cooling is determined and to increase the power supplied to the compressor and maintain the evaporator fan at a first speed when increased cooling is determined.

Claims (15)

1. A refrigeration system for a container for refrigerating chilled cargo, the system comprising:

a compressor, a condenser, and an evaporator connected in series;

an evaporator fan associated with the evaporator and operable to discharge supply air and to receive return air:

a heater;

sensors configured to sense the temperature of the supply air and the temperature of the return air, and

a controller programmed to determine a requirement for heating and a requirement for cooling based on the temperature of the return air and the temperature of the supply air, wherein the controller is programmed to activate the evaporator fan when a requirement for heating is determined and to increase the speed of the evaporator fan when increased heating is determined, and

wherein the controller is programmed to activate the compressor and the evaporator fan when a requirement for cooling is determined and to increase power supplied to the compressor and maintain the evaporator fan at a first speed when increased cooling is determined.

2. The system of claim 1 , wherein the controller is programmed to determine the requirement for heating or the requirement for refrigeration at predetermined time intervals.

3. The system of claim 1 , wherein the controller is programmed to deactivate the compressor and the evaporator fan when there is no requirement determined for at least one of heating and cooling.

4. The system of claim 1 , wherein the controller is programmed to activate the heater to heat the supply air when the requirement for heating is higher than can be satisfied by the evaporator fan alone, and to increase power supplied to the heater when increased heating is determined.

5. The system of claim 1 , wherein the controller is programmed to increase the speed of the evaporator fan to a second speed faster than the first and to increase the power supplied to the compressor when increased cooling is determined.

6. The system of claim 1 , wherein the evaporator fan is driven by a controllable evaporator fan motor.

7. The system of claim 6 , wherein the evaporator fan motor has a continuously variable speed.

8. The system of claim 7 , wherein the evaporator fan motor uses a pulse width modulation (PWM) of an electric power supplied to the motor.

9. The system of claim 1 , wherein the controller is programmed to determine the requirement for heating and the requirement for cooling based on a difference between the return air temperature and the supply air temperature.

Assignments (7)
SECURITY INTEREST Recorded Jul 9, 2024
From: COPELAND COLD CHAIN LP
To: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS NOTES COLLATERAL AGENT
Reel/Frame 068256/0350 →
CHANGE OF NAME Recorded Jul 3, 2024
From: EMERSON DIGITAL COLD CHAIN, INC.
To: COPELAND COLD CHAIN LP
Reel/Frame 068120/0278 →
CHANGE OF NAME Recorded Oct 3, 2023
From: THERMO KING CORPORATION
To: THERMO KING LLC
Reel/Frame 065113/0356 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
CHANGE OF NAME Recorded Sep 21, 2021
From: EMERSON CLIMATE TECHNOLOGIES RETAIL SOLUTIONS, INC.
To: EMERSON DIGITAL COLD CHAIN, INC.
Reel/Frame 057552/0683 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 10, 2009
From: STEFFENSEN, DAN VAD
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 023497/0549 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 10, 2009
From: THOGERSEN, OLE; DYRMOSE, ALLAN
To: THERMO KING CORPORATION
Reel/Frame 023497/0661 →
Continuity (2)
Provisional Application 61108090 · Oct 24, 2008
Related Publication 20100101770A1 · Apr 29, 2010