Method for moving and aligning heavy device

Inventors: Luca Frassinelli (Florence, IT); Stefano Rossin (Pistoia, IT); Daniela Meiattini (Florence, IT)
Assignee: Nuovo Pignone S.P.A.
B66F19/00B23P21/00B62D65/022F01D25/28Y02T50/671
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,032,620
App. No.
12/608,663
Granted
May 19, 2015
Kind
B2
Abstract

Method for laterally replacing a heavy component of a plant assembly, the method including disconnecting the heavy component from other components of the plant assembly and from a base plate to which the heavy component is fixed; lifting the heavy component above the base plate with a lifting system provided within the base plate; connecting at least a pair of rails to the base plate, under the lifted heavy component, such that the at least a pair of rails extends at substantially a right angle relative to a longitudinal axis of the heavy component; lowering the heavy component on crawling mechanisms disposed on the at least a pair of rails; and laterally replacing the heavy component from the base plate and the other components of the plant assembly by actuating the crawling mechanisms.

Claims (17)

1. A method for laterally replacing a heavy component of a plant assembly, the method comprising:

disconnecting the heavy component from other components of the plant assembly and from a base plate to which the heavy component is fixed;

lifting the heavy component above the base plate with a lifting system provided within the base plate;

connecting at least a pair of removable rails to the base plate, under the lifted heavy component, such that the at least a pair of removable rails extends at substantially a right angle relative to a longitudinal axis of the heavy component;

connecting the at least a pair of removable rails to a trolley disposed next to the base plate such that the at least a pair of removable rails spans between the base plate and the trolley;

displacing the heavy component until the heavy component is above the trolley;

lowering the heavy component on to at least a pair of pads coupled to a crawling mechanism disposed on the at least a pair of removable rails; and

laterally moving the heavy component from the base plate and the other components of the plant assembly by actuating the crawling mechanism, wherein the at least a pair of pads is in direct contact with the removable rails, and are configured to slide directly on the at least a pair of removable rails.

2. The method of claim 1 , further comprising:

lifting the heavy component above the removable rail with another lifting system provided on the trolley;

removing the at least a pair of removable rails from the trolley; and

lowering the heavy component on the trolley.

3. The method of claim 1 , wherein the crawling mechanism comprises two active crawling mechanisms and wherein the at least a pair of pads comprises two passive driven pads to the corners of a skid on which the heavy component is placed.

4. The method of claim 1 , further comprising:

hydraulically lifting and laterally replacing the heavy component.

5. The method of claim 1 , wherein the heavy component is a gas turbine and the base plate is fixed on a barge.

6. The method of claim 5 , wherein the gas turbine has a weight between 100 to 250 tons.

Assignments (4)
NUNC PRO TUNC ASSIGNMENT Recorded May 31, 2022
From: NUOVO PIGNONE S.R.L.
To: NUOVO PIGNONE TECNOLOGIE S.R.L.
Reel/Frame 060243/0913 →
NUNC PRO TUNC ASSIGNMENT Recorded May 25, 2022
From: NUOVO PIGNONE INTERNATIONAL S.R.L.
To: NUOVO PIGNONE S.R.L.
Reel/Frame 060441/0662 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 5, 2010
From: FRASSINELLI, LUCA; ROSSIN, STEFANO; MEIATTINI, DANIELA
To: NUOVO PIGNONE S.P.A.
Reel/Frame 024188/0151 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 21, 2009
From: FRASSINELLI, LUCA; ROSSIN, STEFANO; MEIATTINI, DANIELA
To: NUOVO PIGNONE S.P.A.
Reel/Frame 023682/0254 →
Continuity (2)
Provisional Application 61122106 · Dec 12, 2008
Related Publication 20100150693A1 · Jun 17, 2010