IP Library Granted Patent US 8,132,448
Granted Patent B2
US 8,132,448 · App. 12/644,243 · Granted Mar 13, 2012

Steam turbine test facility, low-load test method, and load dump test method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,132,448
App. No.
12/644,243
Granted
Mar 13, 2012
Kind
B2
Abstract

A steam turbine test facility 1 includes a test steam turbine 2 which simulates the behavior of a real steam turbines 11 included in the steam turbine plant 10 , and a motor-generator 4 connected to the test steam turbine 2 . A control unit 5 included in the motor-generator 4 controls the motor-generator 4 to change the rotational speed of the test steam turbine 2 based on an arbitrarily set speed change pattern. The speed change pattern is set such that the test steam turbine 2 in the load disconnection state simulates a time-profile of the rotational speed of the steam turbines 11 with the load disconnected.

Claims (12)

1. A steam turbine test facility for performing tests for performance and reliability verification of a steam turbine plant comprising:

at least one test steam turbine configured to simulate the behavior of a real steam turbine included in the steam turbine plant; and

a motor-generator connected to the at least one test steam turbine and configured to change operation between a motor mode in which the motor-generator operates as a motor and a generator mode in which the motor-generator operates as a generator, depending on the extent of load in a load test of the test steam turbine.

2. The steam turbine test facility according to claim 1 ,

wherein the motor-generator includes a control unit configured to control the motor-generator so as to change the rotational speed of the test steam turbine based on an arbitrarily set speed change pattern.

3. The steam turbine test facility according to claim 2 , wherein the control unit is configured to control the motor-generator so that the speed change pattern is set such that the test steam turbine in the load disconnection state simulates a time-profile of the rotational speed of the real steam turbine with the load disconnected.

4. A low-load test method in a steam turbine test facility for performing tests for performance and reliability verification of a steam turbine plant, the facility having at least one test steam turbine configured to simulate the behavior of a real steam turbine included in the steam turbine plant and a motor-generator connected to the at least one test steam turbine and configured to change operation between a motor mode in which the motor-generator operates as a motor and a generator mode in which the motor-generator operates as a generator, depending on the extent of load in a load test of the test steam turbine of the test steam turbine, the test comprising the steps of:

reducing the steam flow rate of the test steam turbine; and

testing the test steam turbine in a low-load state.

5. A load dump test method in the steam turbine test facility for performing tests for performance and reliability verification of a steam turbine plant, the facility having at least one test steam turbine configured to simulate the behavior of a real steam turbine included in the steam turbine plant and a motor-generator connected to the at least one test steam turbine and configured to change operation between a motor mode in which the motor-generator operates as a motor and a generator mode in which the motor-generator operates as a generator, depending on the extent of load in a load test of the test steam turbine of the test steam turbine, the test comprising the steps of:

interrupting steam supply to the test steam turbine; and

testing the test steam turbine in a load disconnection state.

Assignments (5)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
CONFIRMATORY ASSIGNMENT Recorded Oct 8, 2014
From: HITACHI, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 033917/0209 →
CHANGE OF NAME Recorded May 22, 2014
From: HITACHI, LTD.
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 033003/0648 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 29, 2010
From: NAKAMURA, TATEKI; KUDO, TAKESHI; SHIBASHITA, NAOAKI
To: HITACHI, LTD.
Reel/Frame 023871/0049 →