IP Library Granted Patent US 9,649,715
Granted Patent B2
US 9,649,715 · App. 12/649,727 · Granted May 16, 2017

Pulse width modulation control of gas flow for plasma cutting and marking

Inventor: Jackie Winn (Mt. Pleasant, SC)
Assignee: LINCOLN GLOBAL, INC.
B23K10/006H05H1/34
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,649,715
App. No.
12/649,727
Granted
May 16, 2017
Kind
B2
Abstract

Gas flow control for a plasma arc torch is provided. More particularly, a method and apparatus to modulate the pressure and flow from a plasma arc torch is provided. Cyclic pulsing of a flow control valve between states of fully open and fully closed provides for a relatively constant flow of plasma gas to the torch at a relatively constant pressure.

Claims (30)

1. A method for controlling gas flow to a plasma arc torch, the method comprising the steps of:

providing a plasma gas supply in communication with the plasma arc torch;

regulating the pressure of the plasma gas supply using a pressure regulator;

positioning a valve downstream in the flow of gas from the pressure regulator and between the plasma gas supply and the plasma arc torch so as to control the flow of plasma gas to the torch, the valve having an inlet and an outlet;

ascertaining a frequency and duty cycle at which to cycle the valve between conditions of fully opened and fully closed based on the pressure provided to the valve inlet as determined by the pressure regulator;

cycling the valve between conditions of fully opened and fully closed at the frequency and duty cycle provided by said step of ascertaining so as to provide a predetermined average gas pressure at the outlet of the valve; and

maintaining a relatively constant flow of plasma gas to the plasma torch during said step of cycling the valve.

2. The method for controlling gas flow to a plasma arc torch as in claim 1 , wherein said cycling step further comprises sending a step function signal to the valve.

3. The method for controlling gas flow to a plasma arc torch as in claim 2 , further comprising the step of changing the flow of gas to the plasma torch by changing the duty of the signal over a predetermined time interval.

4. The method for controlling gas flow to a plasma arc torch as in claim 1 , further comprising the step of regulating the pressure to an inlet of the valve to a predetermined value.

5. The method for controlling gas flow to a plasma arc torch as in claim 1 , further comprising the step of dampening the flow of gas between the valve and the torch so as to reduce the size of fluctuations in the pressure of the gas supplied to the torch.

6. The method for controlling gas flow to a plasma arc torch as in claim 1 , further comprising the step of measuring the pressure at an inlet of the valve.

7. The method for controlling gas flow to a plasma arc torch as in claim 1 , wherein said maintaining step further comprises maintaining a relatively constant pressure of plasma gas at the torch.

8. A method for controlling gas flow to a plasma arc torch, the method comprising the steps of:

providing a plasma gas supply in communication with the plasma arc torch;

positioning a valve between the plasma gas supply and the plasma arc torch so as to control the flow of plasma gas to the torch, the valve having an inlet;

connecting the valve and the plasma arc torch with a gas hose;

determining the pressure of plasma gas provided to the valve inlet;

ascertaining a frequency and duty cycle at which to cycle the valve between conditions of fully opened and fully closed using the pressure of the plasma gas provided to the valve inlet from said step of determining;

cycling the valve, at the frequency and duty cycle provided by said step of ascertaining, between conditions of fully opened and fully closed; and

using a resistance to gas flow provided by the torch to maintain a relatively constant flow of plasma gas to the plasma torch during said step of cycling the valve.

9. The method for controlling gas flow to a plasma arc torch as in claim 8 , wherein said cycling step further comprises sending a signal to the valve.

10. The method for controlling gas flow to a plasma arc torch as in claim 9 , wherein the signal comprises a step function signal.

11. The method for controlling gas flow to a plasma arc torch as in claim 9 , further comprising the step of providing a gas line between the valve and the plasma arc torch that does not include a pressure regulator.

12. The method for controlling gas flow to a plasma arc torch as in claim 9 , further comprising the step of changing the flow of gas to the plasma torch by changing the duty cycle of the signal over a predetermined time interval.

13. The method for controlling gas flow to a plasma arc torch as in claim 8 , where the valve is a solenoid valve.

14. The method for controlling gas flow to a plasma arc torch as in claim 8 , further comprising the step of regulating the pressure to an inlet of the valve to a predetermined value.

15. The method for controlling gas flow to a plasma are torch as in claim 8 , further comprising the step of using the gas hose to dampen the flow of gas between the valve and the torch so as to reduce the size of fluctuations in the pressure of the gas at the torch.

16. The method for controlling gas flow to a plasma arc torch as in claim 8 , wherein the gas hose in said step of connecting has an internal cross-sectional area and a length creating a volume in the gas hose that provides a dampening effect that reduces the size of fluctuations in the pressure of the gas provided to the torch during said step of cycling.

17. The method for controlling gas flow to a plasma arc torch as in claim 8 , wherein said maintaining step further comprises maintaining a relatively constant pressure of plasma gas at the torch.

Assignments (6)
CORRECTIVE ASSIGNMENT TO CORRECT THE CONVEYING PARTY DATA PREVIOUSLY RECORDED AT REEL: 031414 FRAME: 0204. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jan 22, 2015
From: KALIBURN, INC.
To: LINCOLN GLOBAL, INC.
Reel/Frame 034793/0542 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 16, 2013
From: KILIBURN INC.
To: LINCOLN GLOBAL, INC.
Reel/Frame 031414/0204 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNOR NAME PREVIOUSLY RECORDED ON REEL 029438 FRAME 0011. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Jan 11, 2013
From: ITT MANUFACTURING ENTERPRISES LLC
To: KALIBURN, INC.
Reel/Frame 029610/0134 →
CHANGE OF NAME Recorded Dec 20, 2012
From: ITT MANUFACTURING ENTERPRISES, INC.
To: ITT MANUFACTURING ENTERPRISES LLC
Reel/Frame 029530/0464 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 10, 2012
From: ITT MANUFACTURING ENTERPRISES, INC.
To: KALIBURN, INC.
Reel/Frame 029438/0011 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 31, 2012
From: WINN, JACKIE L.
To: ITT MANUFACTURING ENTERPRISES, INC.
Reel/Frame 028296/0349 →
Continuity (1)
Related Publication 20110155702A1 · Jun 30, 2011