US 8,306,644 · App. 12/693,578 · Granted Nov 6, 2012

Method and system for modeling a manufacturing process

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,306,644
App. No.
12/693,578
Granted
Nov 6, 2012
Kind
B2
Abstract

A method and a system model a manufacturing process wherein an manufacturing executing system implements the modeled manufacturing process and plans and/or controls the corresponding manufacturing at the shop floor. The method includes providing a number of real machines at the shop floor and describing each real machine by a real machine module having machine attributes in order to control the execution of the real machine. Within the manufacturing process a specific manufacturing activity is defined that requires the execution of a distinct subset of real machines in order to perform its specific production activity. Virtual equipment is provided by combining the real machines included in the subset and describing the virtual equipment by a virtual equipment model to plan and control the specific production activity. The virtual equipment model contains a planning level model and a controlling level model.

Claims (18)

1. A method for modeling a manufacturing process planned by enterprise resource planning (ERP) and produced by a shop floor, a manufacturing executing system (MES) implements a modeled manufacturing process and at least one of plans and controls corresponding manufacturing at the shop floor, the method comprises the steps of:

providing a number of real machines at the shop floor and describing each real machine by a real machine module having machine attributes for controlling an execution of the real machine;

defining within the manufacturing process a specific manufacturing activity requiring execution of a distinct subset of the real machines for performing a specific production activity;

defining virtual equipment by combining the real machines contained in the distinct subset and describing the virtual equipment by a virtual equipment model to plan and control the specific production activity, the virtual equipment model having a planning level model and a controlling level model;

assigning to the planning level model: a) high-level production attributes of the virtual equipment and b) possible constraints among the high-level production attributes; and

assigning to the controlling level model the machine attributes of the real machine module.

2. The method according to claim 1 , which further comprises the steps of:

planning the manufacturing process using the planning level model of the virtual equipment model; and

controlling the manufacturing process using the controlling level model of the virtual equipment model.

3. A system for modeling a manufacturing process planned by enterprise resource planning (ERP) and produced by a shop floor, and a manufacturing executing system (MES) implementing a modeled manufacturing process and at least one of plans and controls a corresponding manufacturing at the shop floor, the system comprising:

a number of real machines at the shop floor, each of said real machines being described by a real machine module having machine attributes for controlling an execution of a real machine;

means for defining within the manufacturing process a specific manufacturing activity requiring execution of a distinct subset of said real machines for performing a specific production activity;

means for defining virtual equipment by combining said real machines contained in said distinct subset and describing said virtual equipment by a virtual equipment model to plan and control the specific production activity, said virtual equipment model having a planning level model and a controlling level model;

means for assigning to said planning level model: a) high-level production attributes of said virtual equipment and b) possible constraints among said high-level production attributes; and

means for assigning to said controlling level model the machine attributes of said real machine module.

4. The system according to claim 3 , further comprising:

means for planning the manufacturing process using said planning level model of said virtual equipment model; and

means for controlling the manufacturing process using said controlling level model of said virtual equipment model.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 17, 2020
From: SIEMENS AKTIENGESELLSCHAFT
To: MONUMENT PEAK VENTURES, LLC
Reel/Frame 052140/0654 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 17, 2012
From: GOZZI, ANDREA
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 028805/0816 →