IP Library Granted Patent US 8,376,158
Granted Patent B2
US 8,376,158 · App. 12/706,995 · Granted Feb 19, 2013

Heavy construction installation method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,376,158
App. No.
12/706,995
Granted
Feb 19, 2013
Kind
B2
Abstract

There is provided a heavy construction installation method which does not need a secondarily transport in a construction field even if an installation position of a heavy construction is apart from a berthing position of a transport ship. A movable area where a ground plane is reinforced so that a heavy hoisting machine for installing a heavy construction in a building is movable is constructed so as to include a circle drawn around an installation position in the building with a maximum operating radius of the heavy hoisting machine relative to a weight of the heavy construction being as a radius, and a circle drawn around a loaded position of the heavy construction at a transport ship coming alongside a landing place with the maximum operating radius being as a radius.

Claims (6)

1. A method of installing a heavy construction, comprising a step of

constructing a movable area by reinforcing a ground plane of the movable area so that a heavy hoisting machine for installing the heavy construction at a predetermined installation position is movable in the movable area, the movable area including:

a part of a first circle which is drawn around the predetermined installation position with a maximum operating radius of the heavy hoisting machine relative to a weight of the heavy construction being as a radius of the first circle; and

a part of a second circle drawn around a loaded position of the heavy construction at a transport ship coming alongside a landing place with the maximum operating radius being as a radius of the second circle.

2. The heavy construction installation method according to claim 1 , further comprising a step of

providing a temporal landing place where the transport ship comes alongside so that an area of the constructed movable area becomes smaller than a case in which the transport ship comes alongside the landing place which is permanently provided.

Assignments (2)
MERGER Recorded Mar 4, 2014
From: HITACHI PLANT TECHNOLOGIES, LTD.
To: HITACHI, LTD.
Reel/Frame 032384/0877 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 17, 2010
From: KANEKO, YUJI; MIYAHARA, RYOHEI; MAEZAWA, SUMITO; MORITA, KENSUKE; OKANO, TAKASHI
To: HITACHI PLANT TECHNOLOGIES, LTD.
Reel/Frame 023946/0675 →