IP Library Granted Patent US 8,700,189
Granted Patent B2
US 8,700,189 · App. 12/712,363 · Granted Apr 15, 2014

Coupling of ERP systems with process control systems for the automated transmission of plant structures and plant data

Inventors: Thomas Dürr (Erlangen, DE); Paul Herrmann (Karlsruhe, DE); Wilfried Sicking (Erlangen, DE); Michael Unkelbach (Buckenhof, DE)
Assignee: Siemens Aktiengesellschaft
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,700,189
App. No.
12/712,363
Granted
Apr 15, 2014
Kind
B2
Abstract

A method for maintaining a technical plant including several components is provided. The method provides a system for planning the use of an enterprise resources system and a control system, with the enterprise resource system connected to the control system and structures of the technical plant are automatically set up in the enterprise resource system.

Claims (17)

1. A method for maintaining a technical plant including several components, the plant comprising an enterprise resources system for planning use of enterprise resources and a control system for controlling operation of the plant, the method comprising:

coupling via a data feed the enterprise resources system to the control system;

setting up, automatically, a plurality of structures of the technical plant in the enterprise resource system that provides an image of the control system in the enterprise resources system in the form of a tree structure;

exchanging via the data feed attributes of the components and maintenance-relevant data of the technical plant between the control system and enterprise resources system;

displaying together on a graphical user interface enterprise resources system information and control system information to enable monitoring of both the technical plant via the control system and associated maintenance tasks via the enterprise resources system; and

upon an occurrence of a fault or maintenance of a component, planning a maintenance measure of the enterprise resources system by:

displaying as part of the control system information a color-coded symbol for the component;

opening an information and navigation menu upon receiving a selection of the color-coded symbol, the information and navigation menu providing a static part comprising drawing and manuals for the component and a dynamic part comprising current status requests for the component; and

starting a maintenance program of the enterprise resources system and opening an entry mask on the graphical user interface upon receiving a selection for allocating a work order in the dynamic part of the control system information.

2. The method as claimed in claim 1 , where the plurality of structures comprise a plurality of functional locations and infrastructures, facilities, or equipment.

3. The method as claimed in claim 1 , further comprising setting up a plurality of threshold values for the components.

4. The method as claimed in claim 1 , wherein a prewarning is triggered when a threshold value is exceeded.

5. The method as claimed in claim 1 , wherein a plurality of maintenance requirements are triggered.

6. The method as claimed in claim 1 , wherein the enterprise resource system information comprises a last repair, a repair period, or costs of a repair.

7. The method as claimed in claim 1 , wherein an overall maintenance history of a component is displayed on the graphical user interface.

8. The method as claimed in claim 7 , wherein a representation takes place in accordance with an order type.

9. The method as claimed in claim 1 , wherein a plurality of associated alarms and trend lines are displayed throughout an observation period.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 15, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 055950/0027 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2010
From: DUERR, THOMAS; HERRMANN, PAUL; SICKING, WILFRIED; UNKELBACH, MICHAEL
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 024197/0945 →
Priority Claims (1)
DE 10 2009 010 795 · Feb 27, 2009 · national
Continuity (1)
Related Publication 20100223087A1 · Sep 2, 2010