IP Library Granted Patent US 9,191,380
Granted Patent B2
US 9,191,380 · App. 12/727,837 · Granted Nov 17, 2015

System and method for managing information technology models in an intelligent workload management system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,191,380
App. No.
12/727,837
Granted
Nov 17, 2015
Kind
B2
Abstract

The system and method described herein for managing information technology models in an intelligent workload management system may include a computing environment having a model-driven, service-oriented architecture for creating collaborative threads to manage workloads. In particular, the management threads may converge information for managing planned changes and recovery processes for version-controlled snapshots of the information technology models. For example, a discovery engine may enrich models of an infrastructure with identity information obtained from an identity vault and the infrastructure itself, and a management infrastructure may then manage planned changes to the infrastructure model. In particular, the management infrastructure may construct implementation plans that coordinate interaction between managed entities to implement the planned changes, and may further detect drifts between operational states and planned states for the infrastructure models.

Claims (60)

1. A system for managing information technology models in an intelligent workload management system, comprising:

an identity vault that stores federated information defining unique identities for a plurality of managed entities across a plurality of authentication domains;

a discovery engine that populates a model of an information technology infrastructure and enriches the model of the information technology infrastructure with the federated information stored in the identity vault and identity information obtained from the information technology infrastructure; and

a management infrastructure that manages one or more planned changes to the model of the information technology infrastructure, wherein the management infrastructure is configured to cause one or more physical processors to:

construct an implementation plan for the planned changes to the model of the information technology infrastructure, wherein the implementation plan includes an approval workflow that coordinates interaction between one or more human approvers and one or more of the plurality of managed entities;

manage the implementation plan constructed for the planned changes, wherein managing the implementation plan includes coordinating the interaction between the one or more human approvers and the one or more of the plurality of managed entities to implement the planned changes in the information technology infrastructure;

capture a snapshot of the information technology infrastructure in response to implementing the planned changes in the information technology infrastructure, wherein the snapshot comprises information about a plurality of resources in the information technology infrastructure, a plurality of managed identities associated with the plurality of resources in the information technology infrastructure, and relationships for the plurality of resources in the information technology infrastructure, wherein the plurality of resources in the information technology infrastructure include one or more physical devices in the information technology infrastructure, one or more applications in the information technology infrastructure, and one or more services in the information technology infrastructure;

compare the snapshot of the information technology infrastructure to a planned configuration state for the information technology infrastructure; and

detect a real-time drift in the snapshot of the information technology infrastructure in response to determining that the snapshot of the information technology infrastructure does not conform to the planned configuration state of the information technology infrastructure, wherein to detect the real-time drift, the management infrastructure is further configured to cause the one or more physical processors to:

identify a location of the real-time drift in the snapshot of the information technology infrastructure based at least on the relationships for the plurality of resources in the information technology infrastructure.

2. The system of claim 1 , wherein the management infrastructure is further configured to cause the one or more physical processors to:

validate the snapshot of the information technology infrastructure in response to determining that the snapshot of the information technology infrastructure conforms to the planned configuration state of the information technology infrastructure;

create a real-time remediation workload associated with the identified location of the real-time drift to recover from the real-time drift in the snapshot of the information technology infrastructure, wherein the real-time remediation workload includes a recovery workflow that the one or more human approvers interact with to recover the snapshot of the information technology infrastructure to a previously validated state of the information technology infrastructure; and

execute the recovery workflow in the real-time remediation workload, wherein the one or more human approvers interact with the executed recovery workflow to roll back one or more changes that occurred in the information technology infrastructure during a time interval between the previously validated state and the drifted state of the information technology infrastructure.

3. The system of claim 1 , wherein the management infrastructure is further configured to cause the one or more physical processors to:

validate the operational state for the information technology infrastructure in response to determining that the snapshot of the information technology infrastructure conforms to the planned configuration state of the information technology infrastructure;

create a real-time remediation workload associated with the identified location of the real-time drift to recover from the real-time drift in the snapshot of the information technology infrastructure, wherein the real-time remediation workload includes a recovery workflow that the one or more human approvers interact with to implement one or more changes to the information technology infrastructure; and

execute the recovery workflow in the real-time remediation workload, wherein the one or more human approvers interact with the executed recovery workflow to cause the snapshot of the information technology infrastructure to conform to the planned configuration state of the information technology infrastructure.

4. The system of claim 1 , wherein the management infrastructure is further configured to cause the one or more physical processors to:

determine that the planned changes to the model of the information technology infrastructure violate one or more policies, wherein the implementation plan modifies one or more of the planned changes for compliance with the violated policies;

determine that the planned changes to the model of the information technology infrastructure competes with one or more other planned changes to model of the information technology infrastructure, wherein the implementation plan modifies one or more of a schedule or a priority for the planned changes or the other planned changes to resolve the competition between the planned changes and the other planned changes; and

determine that the planned changes to the model of the information technology infrastructure interfere with availability or performance for one or more resources in the information technology infrastructure, wherein the implementation plan modifies one or more of the planned changes to resolve the interference with the availability or the performance for the one or more resources in the information technology infrastructure.

5. A system for managing information technology models in an intelligent workload management system, comprising:

an identity vault that stores federated information defining unique identities for a plurality of managed entities across a plurality of authentication domains;

a discovery engine that populates a model of an information technology infrastructure and enriches the model of the information technology infrastructure with the federated information stored in the identity vault and identity information obtained from the information technology infrastructure; and

a management infrastructure that manages one or more planned changes to the model of the information technology infrastructure, wherein the management infrastructure is configured to cause one or more physical processors to:

construct an implementation plan for the planned changes to the model of the information technology infrastructure, wherein the implementation plan includes an approval workflow that coordinates interaction between one or more human approvers and one or more of the plurality of managed entities;

manage the implementation plan constructed for the planned changes, wherein managing the implementation plan includes coordinating the interaction between the one or more human approvers and the one or more of the plurality of managed entities to implement the planned changes in the information technology infrastructure;

capture a snapshot of the information technology infrastructure in response to implementing the planned changes in the information technology infrastructure, wherein the snapshot comprises information about a plurality of resources in the information technology infrastructure, a plurality of managed identities associated with the plurality of resources in the information technology infrastructure, and relationships for the plurality of resources in the information technology infrastructure, wherein the plurality of resources in the information technology infrastructure include one or more physical devices in the information technology infrastructure, one or more applications in the information technology infrastructure, and one or more services in the information technology infrastructure; and

in response to a determination that the snapshot of the information technology infrastructure does not conform to a planned configuration state of the information technology infrastructure, identify a location of a real-time drift in the snapshot from the planned configuration state of the information technology infrastructure based at least on the relationships for the plurality of resources in the information technology infrastructure.

6. The system of claim 5 , wherein the management infrastructure is further configured to cause the one or more physical processors to determine that the planned changes to the model of the information technology infrastructure violate one or more policies, wherein the implementation plan modifies one or more of the planned changes for compliance with the violated policies.

7. The system of claim 5 , wherein the management infrastructure is further configured to cause the one or more physical processors to determine that the planned changes to the model of the information technology infrastructure competes with one or more other planned changes to model of the information technology infrastructure, wherein the implementation plan modifies one or more of a schedule or a priority for the planned changes or the other planned changes to resolve the competition between the planned changes and the other planned changes.

8. The system of claim 5 , wherein the management infrastructure is further configured to cause the one or more physical processors to determine that the planned changes to the model of the information technology infrastructure interfere with availability or performance for one or more resources in the information technology infrastructure, wherein the implementation plan modifies one or more of the planned changes to resolve the interference with the availability or the performance for the one or more resources in the information technology infrastructure.

9. The system of claim 5 , wherein the management infrastructure is further configured to cause the one or more physical processors to:

receive the planned configuration state of the information technology infrastructure from a database storing version-controlled planned configuration state information;

compare the snapshot of the information technology infrastructure to the planned configuration state for the information technology infrastructure to determine whether the snapshot of the information technology infrastructure conforms to the planned configuration state of the information technology infrastructure;

validate the snapshot of the information technology infrastructure in response to determining that the snapshot of the information technology infrastructure conforms to the planned configuration state of the information technology infrastructure.

10. The system of claim 5 , wherein the management infrastructure is further configured to cause the one or more physical processors to:

manage a real-time remediation workload associated with the identified location of the real-time drift to recover from the real-time drift in the snapshot of the information technology infrastructure.

11. The system of claim 10 , wherein the real-time remediation workload includes a recovery workflow that the one or more human approvers interact with to recover the snapshot of the information technology infrastructure to a previously validated state of the information technology infrastructure, and wherein the management infrastructure is further configured to cause the one or more physical processors to execute the recovery workflow in the real-time remediation workload, wherein the one or more human approvers interact with the executed recovery workflow to roll back one or more changes that occurred in the information technology infrastructure during a time interval between the previously validated state and the drifted state of the information technology infrastructure.

12. The system of claim 10 , wherein the real-time remediation workload includes a recovery workflow that the one or more human approvers interact with to implement one or more changes to the information technology infrastructure, and wherein the management infrastructure is further configured to cause the one or more physical processors to execute the recovery workflow in the real-time remediation workload, wherein the one or more human approvers interact with the executed recovery workflow to cause the snapshot of the information technology infrastructure to conform to the planned configuration state of the information technology infrastructure.

13. A method for managing information technology models in an intelligent workload management system, comprising:

storing, in an identity vault, federated information defining unique identities for a plurality of managed entities across a plurality of authentication domains;

populating, by a discovery engine, a model of an information technology infrastructure, wherein the discovery engine enriches the model of the information technology infrastructure with the federated information stored in the identity vault and identity information obtained from the information technology infrastructure; and

managing, by a management infrastructure, one or more planned changes to the model of the information technology infrastructure, wherein managing the planned changes includes:

constructing an implementation plan for the planned changes to the model of the information technology infrastructure, wherein the implementation plan includes an approval workflow that coordinates interaction between one or more human approvers and one or more of the plurality of managed entities;

managing the implementation plan constructed for the planned changes, wherein managing the implementation plan includes coordinating the interaction between the one or more human approvers and the one or more of the plurality of managed entities to implement the planned changes in the information technology infrastructure;

capturing a snapshot of the information technology infrastructure in response to implementing the planned changes in the information technology infrastructure, wherein the snapshot comprises information about a plurality of resources in the information technology infrastructure, a plurality of managed identities associated with the plurality of resources in the information technology infrastructure, and relationships for the plurality of resources in the information technology infrastructure, wherein the plurality of resources in the information technology infrastructure include one or more physical devices in the information technology infrastructure, one or more applications in the information technology infrastructure, and one or more services in the information technology infrastructure; and

in response to a determination that the snapshot of the information technology infrastructure does not conform to a planned configuration state of the information technology infrastructure, identifying a location of a real-time drift in the snapshot from the planned configuration state of the information technology infrastructure based at least on the relationships for the plurality of resources in the information technology infrastructure.

14. The method of claim 13 , wherein managing the planned changes further includes determining that the planned changes to the model of the information technology infrastructure violate one or more policies, wherein the implementation plan modifies one or more of the planned changes for compliance with the violated policies.

15. The method of claim 13 , wherein managing the planned changes further includes determining that the planned changes to the model of the information technology infrastructure competes with one or more other planned changes to model of the information technology infrastructure, wherein the implementation plan modifies one or more of a schedule or a priority for the planned changes or the other planned changes to resolve the competition between the planned changes and the other planned changes.

16. The method of claim 13 , wherein managing the planned changes further includes determining that the planned changes to the model of the information technology infrastructure interfere with availability or performance for one or more resources in the information technology infrastructure, wherein the implementation plan modifies one or more of the planned changes to resolve the interference with the availability or the performance for the one or more resources in the information technology infrastructure.

17. The method of claim 13 , wherein managing the planned changes further includes:

receiving the planned configuration state of the information technology infrastructure from a database storing version-controlled planned configuration state information;

comparing the snapshot of the information technology infrastructure to the planned configuration state for the information technology infrastructure to determine whether the snapshot of the information technology infrastructure conforms to the planned configuration state of the information technology infrastructure; and

validating the snapshot of the information technology infrastructure in response to determining that the snapshot of the information technology infrastructure conforms to the planned configuration state of the information technology infrastructure.

18. The method of claim 13 , wherein managing the planned changes further includes:

managing a real-time remediation workload associated with the identified location of the real-time drift to recover from the real-time drift in the snapshot of the information technology infrastructure.

19. The method of claim 18 , wherein the real-time remediation workload includes a recovery workflow that the one or more human approvers interact with to recover the snapshot of the information technology infrastructure to a previously validated state of the information technology infrastructure, and wherein the one or more human approvers interact with the recovery workflow to roll back one or more changes that occurred in the information technology infrastructure during a time interval between the previously validated state and the drifted state of the information technology infrastructure.

20. The method of claim 18 , wherein the real-time remediation workload includes a recovery workflow that the one or more human operators interact with to implement one or more changes to the information technology infrastructure, and wherein the one or more human approvers interact with the recovery workflow to cause the snapshot of the information technology infrastructure to conform to the planned configuration state of the information technology infrastructure.

Assignments (16)
RELEASE OF SECURITY INTEREST REEL/FRAME 035656/0251 Recorded Feb 2, 2023
From: JPMORGAN CHASE BANK, N.A.
To: BORLAND SOFTWARE CORPORATION; ATTACHMATE CORPORATION; NETIQ CORPORATION; MICRO FOCUS (US), INC.; MICRO FOCUS SOFTWARE INC. (F/K/A NOVELL, INC.)
Reel/Frame 062623/0009 →
RELEASE OF SECURITY INTEREST REEL/FRAME 044183/0718 Recorded Feb 2, 2023
From: JPMORGAN CHASE BANK, N.A.
To: MICRO FOCUS LLC (F/K/A ENTIT SOFTWARE LLC); BORLAND SOFTWARE CORPORATION; MICRO FOCUS (US), INC.; SERENA SOFTWARE, INC; ATTACHMATE CORPORATION; MICRO FOCUS SOFTWARE INC. (F/K/A NOVELL, INC.); NETIQ CORPORATION
Reel/Frame 062746/0399 →
CORRECTIVE ASSIGNMENT TO CORRECT THE TO CORRECT TYPO IN APPLICATION NUMBER 10708121 WHICH SHOULD BE 10708021 PREVIOUSLY RECORDED ON REEL 042388 FRAME 0386. ASSIGNOR(S) HEREBY CONFIRMS THE NOTICE OF SUCCESSION OF AGENCY. Recorded Jul 26, 2018
From: BANK OF AMERICA, N.A., AS PRIOR AGENT
To: JPMORGAN CHASE BANK, N.A., AS SUCCESSOR AGENT
Reel/Frame 048793/0832 →
SECURITY INTEREST Recorded Oct 11, 2017
From: ATTACHMATE CORPORATION; BORLAND SOFTWARE CORPORATION; NETIQ CORPORATION; MICRO FOCUS (US), INC.; MICRO FOCUS SOFTWARE, INC.; ENTIT SOFTWARE LLC; ARCSIGHT, LLC; SERENA SOFTWARE, INC.
To: JPMORGAN CHASE BANK, N.A.
Reel/Frame 044183/0718 →
NOTICE OF SUCCESSION OF AGENCY Recorded May 2, 2017
From: BANK OF AMERICA, N.A., AS PRIOR AGENT
To: JPMORGAN CHASE BANK, N.A., AS SUCCESSOR AGENT
Reel/Frame 042388/0386 →
CHANGE OF NAME Recorded Sep 13, 2016
From: NOVELL, INC.
To: MICRO FOCUS SOFTWARE INC.
Reel/Frame 040020/0703 →
SECURITY INTEREST Recorded May 13, 2015
From: MICRO FOCUS (US), INC.; BORLAND SOFTWARE CORPORATION; ATTACHMATE CORPORATION; NETIQ CORPORATION; NOVELL, INC.
To: BANK OF AMERICA, N.A.
Reel/Frame 035656/0251 →
RELEASE OF SECURITY INTEREST RECORDED AT REEL/FRAME 028252/0316 Recorded Nov 24, 2014
From: CREDIT SUISSE AG
To: NOVELL, INC.
Reel/Frame 034469/0057 →
RELEASE OF SECURITY INTEREST RECORDED AT REEL/FRAME 028252/0216 Recorded Nov 24, 2014
From: CREDIT SUISSE AG
To: NOVELL, INC.
Reel/Frame 034470/0680 →
GRANT OF PATENT SECURITY INTEREST FIRST LIEN Recorded May 23, 2012
From: NOVELL, INC.
To: CREDIT SUISSE AG, AS COLLATERAL AGENT
Reel/Frame 028252/0216 →
GRANT OF PATENT SECURITY INTEREST SECOND LIEN Recorded May 23, 2012
From: NOVELL, INC.
To: CREDIT SUISSE AG, AS COLLATERAL AGENT
Reel/Frame 028252/0316 →
RELEASE OF SECURITY IN PATENTS SECOND LIEN (RELEASES RF 026275/0018 AND 027290/0983) Recorded May 22, 2012
From: CREDIT SUISSE AG, AS COLLATERAL AGENT
To: NOVELL, INC.
Reel/Frame 028252/0154 →
RELEASE OF SECURITY INTEREST IN PATENTS FIRST LIEN (RELEASES RF 026270/0001 AND 027289/0727) Recorded May 22, 2012
From: CREDIT SUISSE AG, AS COLLATERAL AGENT
To: NOVELL, INC.
Reel/Frame 028252/0077 →
GRANT OF PATENT SECURITY INTEREST (SECOND LIEN) Recorded May 13, 2011
From: NOVELL, INC.
To: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
Reel/Frame 026275/0018 →
GRANT OF PATENT SECURITY INTEREST Recorded May 12, 2011
From: NOVELL, INC.
To: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
Reel/Frame 026270/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 19, 2010
From: ANDERSON, ERIC W. B.; WIPFEL, ROBERT; WESTERFELD, KURT
To: NOVELL, INC.
Reel/Frame 024109/0978 →