IP Library Granted Patent US 8,387,444
Granted Patent B2
US 8,387,444 · App. 12/760,148 · Granted Mar 5, 2013

Method of modeling steam generator and processing steam generator tube data of nuclear power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,387,444
App. No.
12/760,148
Granted
Mar 5, 2013
Kind
B2
Abstract

An improved method of inspecting the tubes of a steam generator of a nuclear reactor involves modeling the steam generator and comparing signals of a tube from an eddy current sensor with aspects of the model to determine whether further analysis is required. The model can advantageously include exception data with regard to particular regions of interest (ROIs) of particular tubes that is based upon historic data collected from the steam generator.

Claims (29)

1. A method of non-destructively assessing a current condition of a number of tubes of a steam generator of a nuclear power plant, the method comprising:

establishing a model of the steam generator that comprises a set of baseline parameters for each of a plurality of exemplary regions of interest (ROIs) of a number of the tubes of the steam generator;

extracting a signal from each of a number of physical ROIs of a number of the tubes;

comparing the signal from a given physical ROI of a tube with the set of baseline parameters of the corresponding exemplary ROI of the model; and

triggering additional processing when at least a portion of the signal from the given physical ROI exceeds at least a portion of the set of baseline parameters of the corresponding exemplary ROI.

2. The method of claim 1 wherein the model further comprises an exception data set for each of one or more physical ROIs of each of one or more tubes of the number of tubes, each exception data set being representative of a preexisting signal of the physical ROI that exceeds the set of baseline parameters of the corresponding exemplary ROI, and wherein the triggering of additional processing comprises seeking in the model an exception data set for the given physical ROI.

3. The method of claim 2 , further comprising:

identifying an exception data set for the given physical ROI;

comparing the exception data set for the given physical ROI with the signal from the given physical ROI; and

triggering the need for still further processing if at least a portion of the signal from the given physical ROI exceeds at least a portion of the exception data set for the given physical ROI.

4. The method of claim 3 , further comprising refraining from the triggering of still further processing with respect to the given physical ROI when no portion of the signal from the given physical ROI exceeds by a predetermined threshold the exception data set for the given physical ROI.

5. The method of claim 1 wherein the extracting of a signal from each of a number of the physical ROIs of a number of the tubes further comprises, for each such tube:

detecting a signal from the tube;

subjecting at least a portion of the signal from the tube to an algorithm identify at least a first physical ROI of the tube and to identify a corresponding exemplary ROI of the model.

6. The method of claim 5 wherein the detecting of the signal from the tube comprises detecting a signal component that is indicative of one or more distances along the tube and detecting one or more signal components that are each indicative of a support structure for the tube.

7. The method of claim 1 , further comprising:

at the time of manufacture of the steam generator, subjecting each of at least some of the tubes to an initial data quality evaluation; and

responsive to a determination that at least a portion of the data of a particular tube exceeds a predetermined signal threshold, rejecting at least one of:

the data of the particular tube, and

the particular tube itself.

8. The method of claim 1 , further comprising:

at the time of manufacture of the steam generator, subjecting each of at least some of the tubes to an initial data quality evaluation; and

responsive to a determination that at least a portion of the data of a particular tube is likely to be unreliable, rejecting at least one of:

the data of the particular tube, and

the particular tube itself.

9. The method of claim 1 , further comprising refraining from the triggering of additional processing with respect to a particular physical ROI when no portion of a signal from the particular physical ROI exceeds a set of baseline parameters of a corresponding exemplary ROI.

10. The method of claim 1 , further comprising triggering an additional notification if the at least portion of the signal from the given physical ROI exceeds the at least portion of the set of baseline parameters of the corresponding exemplary ROI by a predetermined amount.

11. The method of claim 1 wherein the set of baseline parameters for at least a first exemplary ROI include a plurality of characteristic characteristics that comprise one or more of a voltage, a phase angle, and a pattern, and further comprising determining that the at least portion of the signal from the given physical ROI exceeds the at least portion of the set of baseline parameters of the corresponding exemplary ROI when any one or more of the plurality of characteristics is exceeded.

12. A machine readable storage medium having stored thereon instructions which, when executed on a processor of a computing device, cause the computing device to perform the operations of claim 1 .

Assignments (8)
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jan 30, 2024
From: CREDIT SUISSE AG, CAYMAN ISLANDS, AS COLLATERAL AGENT
To: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
Reel/Frame 066380/0392 →
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jan 30, 2024
From: BANK OF MONTREAL, AS COLLATERAL AGENT
To: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC
Reel/Frame 066380/0599 →
SECURITY INTEREST Recorded Jan 26, 2024
From: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC; STONE & WEBSTER, L.L.C. (FORMERLY STONE & WEBSTER, INC.)
To: DEUTSCHE BANK AG NEW YORK BRANCH, AS COLLATERAL AGENT
Reel/Frame 066373/0604 →
PATENT SECURITY AGREEMENT Recorded May 27, 2022
From: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC
To: BANK OF MONTREAL, AS COLLATERAL AGENT
Reel/Frame 060791/0372 →
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Aug 1, 2019
From: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
To: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
Reel/Frame 049937/0032 →
SECURITY INTEREST Recorded Aug 1, 2018
From: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
To: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH, AS COLLATERAL AGENT
Reel/Frame 046708/0222 →
SECURITY INTEREST Recorded Aug 1, 2018
From: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
To: GOLDMAN SACHS BANK USA, AS COLLATERAL AGENT
Reel/Frame 046708/0332 →
SECURITY INTEREST Recorded Aug 1, 2018
From: WESTINGHOUSE ELECTRIC COMPANY LLC; FAUSKE AND ASSOCIATES LLC
To: BANK OF MONTREAL, AS ADMINISTRATIVE AGENT
Reel/Frame 046708/0639 →