IP Library Granted Patent US 8,012,318
Granted Patent B2
US 8,012,318 · App. 12/769,884 · Granted Sep 6, 2011

Process for multiple stage direct electrowinning of copper

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,012,318
App. No.
12/769,884
Granted
Sep 6, 2011
Kind
B2
Abstract

A system and process for recovering copper from a copper-containing ore, concentrate, or other copper-bearing material to produce high quality cathode copper from a leach solution without the use of copper solvent/solution extraction techniques or apparatus. A process for recovering copper from a copper-containing ore generally includes the steps of providing a feed stream containing comminuted copper-containing ore, concentrate, or other copper-bearing material, leaching the feed stream to yield a copper-containing solution, conditioning the copper-containing solution through one or more physical or chemical conditioning steps, and electrowinning copper directly from the copper-containing solution in multiple electrowinning stages, without subjecting the copper-containing solution to solvent/solution extraction prior to electrowinning.

Claims (19)

1. A system for recovering copper from a copper-bearing material, comprising:

a pressure leaching vessel configured to pressure leach a feed stream comprising a copper-containing material and an acid at a temperature of from about 100° C. about 250° C. to yield a product slurry comprising a copper-bearing solution and a residue;

a first electrowinning apparatus configured to receive said copper-bearing solution and to produce copper cathode and a first stage lean electrolyte stream;

a second electrowinning apparatus configured to receive a portion of said first stage lean electrolyte stream and to produce copper cathode and a second stage lean electrolyte stream; and

a recycling conduit configured to conduct at least a portion of said first stage lean electrolyte stream to said pressure leaching vessel.

2. The system of claim 1 , wherein said feed stream comprises at least one of a copper-bearing sulfide ore, a concentrate, and a precipitate.

3. The system of claim 1 , wherein said feed stream comprises at least one of chalcopyrite, chalcocite, bornite, covellite, digenite, enargite, or mixtures or combinations thereof.

4. The system of claim 1 , further comprising a separation vessel configured to separate at least a portion of said copper-containing material from said acid in said feed stream to yield a copper-containing feed stream comprising a copper-bearing material.

5. The system of claim 4 , wherein said separation vessel is configured to house a precipitation process comprising reacting at least a portion of the copper in a copper-containing electrolyte stream with a precipitant to precipitate at least a portion of said copper in said copper-containing electrolyte stream as copper sulfide in said feed stream.

6. The system of claim 4 , wherein said separation vessel is configured to react at least a portion of the copper in a copper-containing electrolyte stream in the presence of sulfur dioxide, whereby at least a portion of said copper in said copper-containing electrolyte stream precipitates as copper sulfide in said feed stream.

7. The system of claim 1 , wherein said pressure leaching vessel is configured to pressure leach said feed stream in the presence of a surfactant selected from the group consisting of lignin derivatives, orthophenylene diamine, alkyl sulfonates, and mixtures thereof.

8. The system of claim 1 , wherein said pressure leaching vessel is configured to pressure leach said feed stream in the presence of a surfactant in an amount of from about 2 to about 20 kilograms per tonne of concentrate in the copper-containing feed stream.

9. The system of claim 1 , wherein said second electrowinning apparatus is configured to electrowin copper from at least a portion of said first stage lean electrolyte stream without subjecting said first stage lean electrolyte stream to solvent/solution extraction.

10. The system of claim 4 , wherein said second electrowinning apparatus is configured to electrowin copper from at least a portion of said first stage lean electrolyte stream without subjecting said first stage lean electrolyte stream to solvent/solution extraction.

11. A method comprising:

pressure leaching a feed stream comprising a copper-containing material and an acid at a temperature of from about 100° C. about 250° C. to yield a product slurry comprising a copper-bearing solution;

electrowinning copper from said copper-bearing solution in a first electrowinning stage to produce a first stage lean electrolyte stream;

electrowinning copper from said first stage lean electrolyte stream in a second electrowinning stage to produce a second stage lean electrolyte stream; and

recycling at least a portion of said first stage lean electrolyte stream to said pressure leaching.

Assignments (4)
CHANGE OF NAME Recorded Jul 23, 2014
From: FREEPORT-MCMORAN CORPORATION
To: FREEPORT MINERALS CORPORATION
Reel/Frame 033389/0300 →
MERGER Recorded Jul 17, 2014
From: FREEPORT-MCMORAN CORPORATION
To: FREEPORT-MCMORAN CORPORATION
Reel/Frame 033357/0849 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 29, 2010
From: MARSDEN, JOHN O; BREWER, ROBERT E; ROBERTSON, JOANNA M; BAUGHMAN, DAVID R; THOMPSON, PHILIP; HAZEN, WAYNE W; BEMELMANS, CHRISTEL M.A.
To: PHELPS DODGE CORPORATION
Reel/Frame 024309/0609 →
CHANGE OF NAME Recorded Apr 29, 2010
From: PHELPS DODGE CORPORATION
To: FREEPORT-MCMORAN CORPORATION
Reel/Frame 024309/0698 →