IP Library Granted Patent US 7,957,746
Granted Patent B2
US 7,957,746 · App. 12/773,138 · Granted Jun 7, 2011

Power management and distributed scheduling for uplink transmissions in wireless systems

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,957,746
App. No.
12/773,138
Granted
Jun 7, 2011
Kind
B2
Abstract

To schedule uplink transmission time slots for a collection of mobile communication devices, a set of base station target interference patterns is associated with base stations. A time slot target interference pattern is assigned for each time slot and it repeats after several time slots. The time slot target interference pattern in a given time slot specifies the interference allowed by each time slot to a given base station by any single mobile. A priority index may be determined for each time slot for each mobile associated with the particular base station. The priority index may be based, in part, on a determined correlation between the time-slot target interference patterns and a potential interference profile of a mobile to which a time slot is to be allocated. A mobile's throughput requirement, the throughput already received over a specified past duration, the system fairness requirement, as well as the amount of data available for transmission are also used for evaluating the priority index.

Claims (28)

1. At a mobile station in a wireless communication system, a method of power management for uplink transmissions to a base station, said method comprising:

receiving a grant of permission to transmit in a given time slot in a scheduling time frame of a plurality of time slots;

recording measurements of power in pilot signals received from said base station in said given time slot;

receiving an indication of an interference metric threshold level associated, at said base station, with said given time slot;

determining, based on said measurements and said interference metric threshold level, an optimum power level for transmission to said base station; and

transmitting to said base station in said given time slot at said optimum power level.

2. At a mobile station in a wireless communication system, a method of power management for uplink transmissions to a given base station among a plurality of base stations, said method comprising:

receiving a grant of permission to transmit in a given time slot in a scheduling time frame of a plurality of time slots;

recording measurements of power in pilot signals received from said plurality of base stations in said given time slot;

receiving an indication of an interference metric threshold level associated, at each base station in said plurality of base stations, with said given time slot;

determining, based on said measurements and said interference metric threshold levels, an optimum power level for transmission to said given base station; and

transmitting to said given base station in said given time slot at said optimum power level.

3. A mobile station for use in a wireless communication system, said mobile station comprising:

a memory; and

a processor operable to:

receive a grant of permission to transmit in a given time slot in a scheduling time frame of a plurality of time slots;

record measurements of power in pilot signals received from a base station in said given time slot;

receive an indication of an interference metric threshold level associated, at said base station, with said given time slot;

determine, based on said measurements and said interference metric threshold level, an optimum power level for transmission to said base station; and

transmit to said base station in said given time slot at said optimum power level.

4. A mobile station for use in a wireless communication system, said mobile station comprising:

a memory; and

a processor operable to:

receive a grant of permission to transmit in a given time slot in a scheduling time frame of a plurality of time slots;

record measurements of power in pilot signals received from a plurality of base stations in said given time slot;

receive an indication of an interference metric threshold level associated, at each base station in said plurality of base stations, with said given time slot;

determine, based on said measurements and said interference metric threshold levels, an optimum power level for transmission to a given base station among said plurality of base stations; and

transmit to said given base station in said given time slot at said optimum power level.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 1, 2012
From: ROCKSTAR BIDCO, LP
To: APPLE INC.
Reel/Frame 028704/0508 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 28, 2011
From: NORTEL NETWORKS LIMITED
To: ROCKSTAR BIDCO, LP
Reel/Frame 027164/0356 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 4, 2010
From: SENARATH, NIMAL; AU, KELVIN KAR-KIN; PERIYALWAR, SHALINI
To: NORTEL NETWORKS LIMITED
Reel/Frame 024334/0578 →