IP Library Granted Patent US 8,604,709
Granted Patent B2
US 8,604,709 · App. 12/779,179 · Granted Dec 10, 2013

Methods and systems for controlling electrical power to DC loads

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,604,709
App. No.
12/779,179
Granted
Dec 10, 2013
Kind
B2
Abstract

Fixed Frequency, Fixed Duration power controls methods and systems are described for application of power to electrical loads. FFFD techniques according to the present disclosure utilize power train pulses with fixed-frequency fixed-duration pulses to control power applied to a load. The load can be any type of DC load. FFFD techniques allows for controlled variation of the fixed length of the ON pulse, the Fixed length of the OFF or recovery period, the total time period for one cycle, and/or the number of pulses in that time period. Applications to electric motors, electric lighting, and electric heating are described. Related circuits are also described.

Claims (35)

1. A method of using pulses of fixed duration and fixed frequency for power control of electrical loads, the method comprising:

with a processing system, providing a timing signal to a circuit, wherein the timing signal includes an ON state and an OFF state;

determining a desired power level for an electrical load in the circuit;

based on the timing signal, generating a control signal including a sequence of control pulses of fixed duration and fixed frequency within the timing signal and corresponding to the desired power level; and

supplying the control signal to an input of a current switch connected to the electrical load, in the circuit, to place the switch in one of an ON state during each pulse and an OFF state after each pulse to cause current to flow from a first potential to a second potential through the electrical load during the ON state;

wherein the circuit has an initial condition before flow of current through the current switch and the period time between each of the pulses of the timing cycle is longer than the period of time for the circuit to return to the initial condition after a pulse of the timing cycle.

2. The method of claim 1 , further comprising varying the number of pulses within a repeating time cycle.

3. The method of claim 1 , wherein the electrical load comprises one or more DC electric motors.

4. The method of claim 1 , wherein providing a timing signal comprises using software using decrementing or incrementing counters to control the time periods of the control pulses.

5. The method of claim 3 , further comprising controlling the movement of the one or more DC electrical motors.

6. The method of claim 1 , wherein generating a control signal comprises using analog pulse shaping circuits.

7. The method of claim 6 , further comprising controlling power applied to one or more electric motors.

8. The method of claim 1 , further comprising controlling power applied to one or more electric light sources.

9. The method of claim 8 , further comprising controlling the intensity of the optical output of the one or more light sources by varying the number of pulses within a repeating time cycle.

10. The method of claim 1 , further comprising controlling power applied to one or more heating devices.

11. The method of claim 10 , further comprising controlling a heat output by varying the number of pulses within a repeating time cycle.

12. The method of claim 1 , further comprising controlling power applied to one or more switching power supplies, by varying the number of pulses within a repeating time cycle.

13. A FFFD power control circuit comprising:

a first power potential;

a second power potential;

an electrical load; and

a current switch connected to the electrical load and including an input to receive a current switch control signal to place the switch in one of an ON state and an OFF state including a timing cycle with a series of pulses of fixed duration and fixed frequency within the timing cycle to cause current to flow from the first potential to the second potential through the load during the ON state to cause the load to receive power over the timing cycle;

wherein the circuit has an initial condition before flow of current through the current switch and the period time between each of the pulses of the timing cycle is longer than the period of time for the circuit to return to the initial condition after a pulse of the timing cycle.

14. The circuit of claim 13 , wherein the load is a light emitting diode (LED).

15. The circuit of claim 13 , wherein the load comprises an array of light emitting diodes.

16. The circuit of claim 13 , wherein the load comprises an electric circuit of a DC motor.

17. The circuit of claim 16 , wherein the DC motor is a brushless DC motor.

18. The circuit of claim 13 , wherein the load comprises an electric circuit of an AC motor.

19. The circuit of claim 14 , wherein the number of pulses in a timing cycle varies from zero to a maximum number corresponding to an intensity level of the LED from zero to a maximum intensity.

20. The circuit of claim 13 , wherein the load comprises a heating element.

21. The circuit of claim 20 , wherein the number of pulses in a timing cycle varies from zero to a maximum number corresponding to a heat output level of the heating element from zero to a maximum heat output.

22. The circuit of claim 13 , further comprising a processing device to generate the current switch control signal supplied to the current switch and to time the start and end of each pulse within the timing cycle.

23. The circuit of claim 13 , further comprising a second current switch connected to the load.

24. The circuit of claim 23 , further comprising a shunt resistor connected to the first or second current switches and the first or second power potentials.

25. The circuit of claim 23 , further comprising a shunt diode connected to the first or second current switches and the first or second power potentials.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 30, 2015
From: SACO TECHNOLOGIES INC.
To: GREENVISION GROUP TECHNOLOGIES CORPORATION
Reel/Frame 036919/0584 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2015
From: LSI INDUSTRIES INC.
To: LSI SACO TECHNOLOGIES INC.
Reel/Frame 036214/0010 →
CHANGE OF NAME Recorded Jul 30, 2015
From: LSI SACO TECHNOLOGIES INC.
To: SACO TECHNOLOGIES INC.
Reel/Frame 036225/0927 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 11, 2010
From: JALBOUT, BASSAM D.; WONG, BRIAN
To: LSI INDUSTRIES, INC.
Reel/Frame 024524/0742 →
SECURITY AGREEMENT Recorded May 4, 2001
From: AMES TRUE TEMPER PROPERTIES, INC; AMES TRUE TEMPER, INC; ARCHITECTURAL AREA LIGHTING, INC.; ARROW CONSOLIDATED CORPORATION; ASTERIA COMPANY; BATHCRAFT, INC.; BAYLIS BROTHERS, INC.; BRUCKNER MANUFACTURING CORP.; CARLSBAD CORP.; COLUMBIA LIGHTING MFG. CO.; COLUMBIA LIGHTING PROPERTIES, INC.; COLUMBIA LIGHTING, INC.; COLUMBIA LIGHTING LCA, INC.; COLUMBIA MATERIALS, LLC; COMPAX CORP.; DUAL-LITE INC.; ELJER INDUSTRIES, INC.; ELJER PLUMBINGWARE, INC.; ENVIRONMENTAL ENERGY COMPANY; EZ HOLDINGS, INC.; GARY CONCRETE PRODUCTS, INC; GATSBY SPAS, INC.; HL CAPITAL CORP.; IXL MANUFACTURING COMPANY, INC.; JACUZZI; JACUZZI WHIRLPOOL BATH, INC.; JUSI HOLDINGS, INC.; KIM LIGHTING INC.; KLI, INC.; LCA (NS) INC.; LCA GROUP INC.; LIGHTING CORPORATION OF AMERICA, INC.; LOKELANI DEVELOPMENT CORPORATION; LUXOR INDUSTRIES, INC.; MAILI KAI LAND DEVELOPMENT CORPORATION; MOBILITE, INC.; NEPCO OF AUSTRALIA, INC.; NEPCO OF CANADA, INC.; NEPCO OF FORD HEIGHTS, INC.; NEPCO OF FULTON, INC.; NEPCO OF PAKISTAN, INC.; NISSEN UNIVERSAL HOLDINGS, INC.; OUTDOOR PRODUCTS LLC; PH PROPERTY DEVELOPMENT COMPANY; PRESCOLITE LITE CONTROLS, INC.; PRESCOLITE, INC.; PROGRESS LIGHTING PROPERTIES, INC.; PROGRESS LIGHTING, INC.; PROGRESSIVE LIGHTING, INC. (NC); PROGRESSIVE LIGHTING, INC. (SC); REDMONT, INC.; ZURNACQ OF CALIFORNIA, INC.; DUAL-LITE MANUFACTURING, INC.; SANITARY-DASH MANUFACTURING CO., INC.; SELKIRK CANADA U.S.A., INC.; SELKIRK EUROPE U.S.A., INC.; SELKIRK, INC.; SPAULDING LIGHTING, INC.; STRATEGIS CAPITAL MANAGEMENT, INC.; STREAMWOOD CORPORATION; SUNDANCE SPAS, INC.; TA LIQUIDATION CORP.; TRIMFOOT CO.; TT LIQUIDATION CORP.; U.S. INDUSTRIES, INC.; UGE LIQUIDATION INC.; UNITED STATES BRASS CORP.; USI AMERICAN HOLDINGS, INC.; USI ATLANTIC CORP.; USI CAPITAL, INC.; USI FUNDING, INC.; USI GLOBAL CORP.; USI PROPERTIES, INC.; USI REALTY CORP.; ZURCO, INC.; ZURN (CAYMAN ISLANDS), INC.; ZURN CONSTRUCTORS, INC.; ZURN DEVCO, INC.; ZURN EPC SERVICES, INC.; ZURN GOLF HOLDING CORPORATION; ZURN INDUSTRIES, INC.
To: WILMINGTON TRUST COMPANY
Reel/Frame 011731/0097 →