IP Library Granted Patent US 8,955,321
Granted Patent B2
US 8,955,321 · App. 12/781,593 · Granted Feb 17, 2015

Method for primary control of a steam turbine installation

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,955,321
App. No.
12/781,593
Granted
Feb 17, 2015
Kind
B2
Abstract

A method is provided for primary control of a steam turbine installation in network operation, which provides at least two pressure stages, these being a high-pressure and a low-pressure steam turbine stage, in which for storing reserve power a live steam valve along an operating-steam feed line to at least one pressure stage of the steam turbine is operated in a throttled manner, the live steam valve, in the case of a reducing network frequency and network frequency boosting which is necessary as a result of this, is transferred to an at least less throttled state. At least some of the partially expanded operating steam which issues from the high-pressure steam turbine stage is introduced directly without reheating, into the low-pressure steam turbine stage for further expansion.

Claims (5)

1. A method for primary control of a steam turbine installation in network operation, the steam turbine installation including at least a high-pressure and a low-pressure steam turbine stage, the method comprising:

operating a live steam valve, along an operating-steam feed line to at least one pressure stage of the steam turbine, in a throttled manner for storing reserve power;

introducing at least some partially expanded operating steam which issues from the high-pressure steam turbine stage into the low-pressure steam turbine stage via a direct steam feed line between the high-pressure steam turbine stage and the low-pressure steam turbine stage for further expansion, in the event of reduced network frequency and the live steam valve being transferred to a less throttled state, for network frequency boosting, wherein the at least some partially expanded operating steam which issues from the high-pressure steam turbine that is introduced into the low-pressure steam turbine via the direct steam feed line is not reheated.

2. The method as claimed in claim 1 , wherein in the operation of the throttled live steam valve for storing reserve power, operating steam which issues in a partially expanded state from the high-pressure steam turbine stage is directed via a reheater unit for maintaining a reheated, partially expanded operating steam which is fed to an intermediate-pressure steam turbine unit and to a low-pressure steam turbine stage which is connected thereto, and in the case of network frequency boosting at least some of the operating steam which issues in a partially expanded state from the high-pressure steam turbine stage is directed to the low-pressure steam turbine stage via the direct steam feed line.

3. The method as claimed in claim 2 , wherein the steam turbine installation further comprises a valve unit, along the direct steam feed line, which is opened exclusively in the event of network frequency boosting.

Assignments (5)
MERGER Recorded Mar 21, 2025
From: ARABELLE TECHNOLOGIES
To: ARABELLE SOLUTIONS FRANCE
Reel/Frame 070587/0348 →
NUNC PRO TUNC ASSIGNMENT Recorded Nov 26, 2024
From: GENERAL ELECTRIC TECHNOLOGY GMBH
To: POWER SOLUTIONS GAMMA FRANCE
Reel/Frame 069450/0966 →
CHANGE OF NAME Recorded Nov 26, 2024
From: POWER SOLUTIONS GAMMA FRANCE
To: ARABELLE TECHNOLOGIES
Reel/Frame 069451/0916 →
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 4, 2010
From: BERKE, OLAF; HOLY, FRANZ-JOSEF; MULLER, KARSTEN; CLOPPENBURG, REINHARD JOHANNES SEVERIN
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 024789/0447 →