Control device for wind power systems having power failure detection

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,478,448
App. No.
12/808,091
Granted
Jul 2, 2013
Kind
B2
Abstract

A wind energy installation control device includes a wind rotor, a generator driven by the wind rotor, a torque control unit configured to control a torque of the generator, and a control system. The control system includes a detector configured to identify a grid dip and an end of the grid dip, a residual torque transmitter configured to provide a set point for a torque of the generator after identification of the grid dip, and an initializer configured to initialize a component of the torque control unit at the set point. Accordingly, upon return of grid power after a grid dip, the vibration behavior of a wind power system can be significantly improved. Overload of a drive train upon return of grid voltage can thus be reduced.

Claims (30)

1. A wind energy installation control device, comprising:

a wind rotor;

a generator driven by the wind rotor;

a torque control unit configured to control a torque of the generator; and

a control system comprising a detector configured to identify a grid dip and an end of the grid dip, a residual torque transmitter configured to provide a set point value for a torque of the generator after identification of the grid dip, wherein the set point value is closer to the saturation limit of the torque control unit than the set point value being used before the grid dip, and an initializer configured to initialize a component of the torque control unit at the set point value.

2. The wind energy installation control device of claim 1 , wherein the component of the torque control unit is an steady-state accuracy component.

3. The wind energy installation control device of claim 1 , wherein the initializer is configured to vary a weighting factor of the component in the torque control unit.

4. The wind energy installation control device of claim 3 , wherein the initializer is configured to vary at least one additional weighting factor of another component in a sense opposite to the variation of the weighting factor of the component.

5. The wind energy installation control device of claim 3 , wherein the initializer is configured to vary at least one additional weighting factor of another component.

6. The wind energy installation control device of claim 5 , wherein the initializer is configured to vary the weighting factors temporarily over an adjustable time period.

7. The wind energy installation control device of claim 1 , further comprising a determination module for a set point value configured to determine a safe torque as a function of the severity of the grid dip.

8. The wind energy installation control device of claim 7 , wherein the determination module has a characteristic element.

9. The wind energy installation control device of claim 1 , wherein the control system further comprises an override module configured to apply an amended setting point for a rotation speed to at least one of a pitch control unit and the torque control unit.

10. The wind energy installation control device of claim 9 , wherein setting points for the pitch control unit and for the torque control unit are different.

11. The wind energy installation control device of claim 9 , wherein an amended rotation-speed setting point is applied to an input filter for a regulated core of the torque control unit.

12. The wind energy installation control device of claim 1 , wherein the control system further comprises a pilot control module configured to identify the grid dip and an occurrence of an excessive torque.

13. The wind energy installation control device of claim 12 , wherein the pilot control module is configured to act on a switching device to apply a nominal torque to the generator during the grid dip.

14. The wind energy installation control device of claim 12 , wherein the pilot control module is configured to interact with the initializer to initialize the component of the torque control unit.

15. The wind energy installation control device of claim 14 , wherein the component of the torque control unit is a steady-state accuracy component.

16. The wind energy installation control device of claim 12 , wherein the control system further comprises a quick-acting pitch adjustment module configured to be controlled by the pilot control module.

17. A wind energy installation comprising the wind energy installation control device of claim 1 .

18. A method of operating a wind energy installation having a generator driven by a wind rotor for producing and feeding electrical energy into a grid and a control device with a torque control unit, comprising:

identifying a grid dip and a return of grid voltage;

determining a set point value for a torque of the generator after identification of the grid dip, wherein the set point value is closer to the saturation limit of the torque control unit than the set point value being used before the grid dip; and

initializing a component in the torque control unit at the set point value.

19. A method of operating a wind energy installation having a generator driven by a wind rotor for producing and feeding electrical energy into a grid and a control device with a torque control unit, comprising:

identifying a grid dip and a return of grid voltage;

determining a set point value for a torque of the generator after identification of the grid dip, wherein the set point value is closer to the saturation limit of the torque control unit than the set point value being used before the grid dip; and

initializing a component in the torque control unit at the set point value,

wherein the wind energy installation control device of claim 1 is used to perform the method.

Assignments (7)
CHANGE OF ADDRESS Recorded Aug 31, 2023
From: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064834/0873 →
CHANGE OF NAME Recorded Oct 20, 2022
From: SENVION DEUTSCHLAND GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064371/0624 →
CHANGE OF NAME Recorded Sep 16, 2022
From: SENVION GMBH
To: SENVION DEUTSCHLAND GMBH
Reel/Frame 061462/0567 →
CHANGE OF NAME Recorded Aug 3, 2022
From: SENVION AG
To: SENVION GMBH
Reel/Frame 061068/0001 →
CHANGE OF NAME Recorded Jul 18, 2022
From: SENVION SE
To: SENVION AG
Reel/Frame 060692/0328 →
CHANGE OF NAME Recorded Jan 23, 2015
From: REPOWER SYSTEMS SE
To: SENVION SE
Reel/Frame 034806/0074 →
CHANGE OF NAME Recorded May 31, 2013
From: REPOWER SYSTEMS AG
To: REPOWER SYSTEMS SE
Reel/Frame 030528/0448 →