IP Library Granted Patent US 8,281,476
Granted Patent B2
US 8,281,476 · App. 12/810,274 · Granted Oct 9, 2012

Multilayered tube and manufacturing method thereof based on high pressure tube hydroforming

Assignee: Hyundai Hysco
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,281,476
App. No.
12/810,274
Granted
Oct 9, 2012
Kind
B2
Abstract

Disclosed is a method of manufacturing a multilayered tube, including: preparing an outer tube, an inner tube having an outer diameter of 95˜98% of an inner diameter of the outer tube, and dies with a shaping void having a diameter of 100.20˜100.30% of an outer diameter of the outer tube; mounting the outer tube on the shaping void, with the inner tube inserted into the outer tube; plastically expanding the inner tube to be brought into contact with the outer tube by injecting a fluid into the inner tube until a pressure of the fluid reaches a first forming pressure inside the inner tube; elastically expanding the outer tube to be brought into contact with the shaping void by increasing the pressure of the fluid until the pressure of the fluid reaches a second forming pressure inside the inner tube; and elastically recovering the outer tube to allow the outer tube and the inner tube to be coupled to each other by removing the fluid from the inner tube, wherein the first forming pressure is in the range of 10˜20% of yield strength of the inner tube, and the second forming pressure is in the range of 10˜20% of yield strength of the outer tube and is maintained for 2˜3 seconds.

Claims (26)

1. A method of manufacturing a multilayered tube, comprising:

preparing an outer tube, an inner tube having an outer diameter of 95˜98% of an inner diameter of the outer tube, and dies with a shaping void having a diameter of 100.20˜100.30% of an outer diameter of the outer tube;

mounting the outer tube on the shaping void, with the inner tube inserted into the outer tube;

plastically expanding the inner tube to be brought into contact with the outer tube by injecting a fluid into the inner tube until a pressure of the fluid reaches a first forming pressure inside the inner tube;

elastically expanding the outer tube to be brought into contact with the shaping void by increasing the pressure of the fluid until the pressure of the fluid reaches a second forming pressure inside the inner tube; and

elastically recovering the outer tube to allow the outer tube and the inner tube to be coupled to each other by removing the fluid from the inner tube,

wherein the first forming pressure is in the range of 10˜20% of yield strength of the inner tube, and

wherein the second forming pressure is in the range of 10˜20% of yield strength of the outer tube and is maintained for 2˜3 seconds.

2. The method according to claim 1 , wherein an inner surface of the outer tube has a surface roughness Ra of 25˜75 μm and an outer surface of the inner tube has a surface roughness Ra of 25˜75 μm.

3. The method according to claim 1 , wherein the outer tube has an outer diameter of 21.0˜660.4 mm and a thickness of 0.8˜27.0 mm, and the shaping void has a diameter of 100.20˜100.30% of the diameter of the outer tube.

4. The method according to claim 1 , wherein the outer tube has an outer diameter of 21.0˜660.4 mm and a thickness of 0.8˜27.0 mm, and the inner tube has an outer diameter of 95˜98% of the inner diameter of the outer tube and a thickness of 0.8˜27.0 mm.

5. A method of manufacturing a multilayered tube, comprising:

preparing an outer tube, an inner tube having an outer diameter of 95˜98% of an inner diameter of the outer tube, a second inner tube having an outer diameter of 95˜98% of an inner diameter of the inner tube, and dies with a shaping void having a diameter of 100.20˜100.30% of an outer diameter of the outer tube;

mounting the outer tube on the shaping void, with the inner tube and the second inner tube inserted into the outer tube;

plastically expanding the second inner tube to be brought into contact with the inner tube and to force the inner tube to be brought into contact with the outer tube by an expanding force of the second inner tube by injecting a fluid into the second inner tube until a pressure of the fluid reaches a first forming pressure inside the second inner tube;

elastically expanding the outer tube to be brought into contact with the shaping void by increasing the pressure of the fluid until the pressure of the fluid reaches a second forming pressure inside the second inner tube; and

elastically recovering the outer tube to allow the outer tube, the inner tube and the second inner tube to be coupled to one another by removing the fluid from the second inner tube,

wherein the first forming pressure is in the range of 10˜20% of the sum of yield strengths of the inner tube and the second inner tube, and

wherein the second forming pressure is in the range of 10˜20% of the sum of the yield strengths of the second inner tube, the inner tube and the outer tube, and is maintained for 2˜3 seconds.

6. The method according to claim 5 , wherein an inner surface of the outer tube has a surface roughness Ra of 25˜75 μm, and inner and outer surfaces of the inner tube have a surface roughness Ra of 25˜75 μm, and an outer surface of the second inner tube has a surface roughness Ra of 25˜75 μm.

7. A multilayered tube manufactured by the method of claim 1 .

8. A multilayered tube manufactured by the method of claim 2 .

9. A multilayered tube manufactured by the method of claim 3 .

10. A multilayered tube manufactured by the method of claim 4 .

11. A multilayered tube manufactured by the method of claim 5 .

12. A multilayered tube manufactured by the method of claim 6 .

Assignments (2)
MERGER Recorded Dec 17, 2015
From: HYUNDAI HYSCO CO., LTD.
To: HYUNDAI STEEL COMPANY
Reel/Frame 037325/0070 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 23, 2010
From: HUR, JU HAENG; JEON, DONG HYUN; KIM, YUN GYU; KIM, HYO SUB; NA, SANG MUK
To: HYUNDAI HYSCO
Reel/Frame 024583/0649 →
Priority Claims (1)
KR 10-2008-0130667 · Dec 19, 2008 · national
Continuity (1)
Related Publication 20110120585A1 · May 26, 2011