IP Library Granted Patent US 7,948,241
Granted Patent B2
US 7,948,241 · App. 12/814,572 · Granted May 24, 2011

Fault direction determination

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 7,948,241
App. No.
12/814,572
Granted
May 24, 2011
Kind
B2
Abstract

The invention concerns a method and computer program product for determining the direction of fault in an electrical power system as well as to a fault handling device. In the fault handling device the voltage at a measurement node of the power system is measured, the phase (φ PF ) of this voltage (V PF ) before a fault is stored, the phase (φ F ) of this voltage (V F ) at the end of a time interval (TI) following directly after a detected fault is determined, a phase offset (φ O ) is determined as the difference between the phase (φ PF ) of the measured voltage (V PF ) before the fault and the phase (φ F ) of the measured voltage (V F ) at the end of the time interval (TI) and the phase (φ F ) of the measured voltage (V F ) after the detection of the fault is adjusted with the phase offset (φ O ). Thereafter the adjusted measured voltage is used in determining the direction of fault in relation to the measurement node.

Claims (49)

1. A method for determining the direction of fault in an electrical power system comprising the steps of:

measuring a voltage (V) at a measurement node of the electrical power system, and

storing at least the phase (φ PF ) of the measured voltage (V PF ) before the occurrence of a fault,

characterised by the further steps of

determining at least the phase (φ PF ) of the measured voltage (V PF ) at the end of a time interval (TI) following directly after a detection of said fault has been made,

determining a phase offset (φ O ) as the difference between the phase (φ PF ) of the measured voltage (V PF ) before the fault and the phase (φ F ) of the measured voltage (V F ) at the end of the time interval (TI),

adjusting the phase of the measured voltage (V F ) after the detection of the fault with said phase offset (φ O ), and

using the adjusted measured voltage in determining the direction of fault in relation to said measurement node.

2. The method according to claim 1 , further comprising the step of using the phase (φ PF ) of the measured voltage (V PF ) before the fault as the phase (φ F ) of the adjusted measured voltage (V F ) after the fault before the offset is determined.

3. The method according to claim 1 , wherein the time interval (TI) has a length that is sufficient for enabling the phase (φ F ) of the measured voltage (V F ) after the fault to be determined.

4. The method according to claim 3 , wherein the time interval (TI) is in the range between 1/10 and 100 periods of the measured voltage at the measurement node.

5. The method according to claim 4 , wherein the time interval (TI) is 1/10 of the period of the measured voltage at the measurement node.

6. The method according to claim 4 , wherein the time interval (TI) is one period of the measured voltage at the measurement node.

7. The method according to claim 4 , wherein the time interval (TI) is two periods of the measured voltage at the measurement node.

8. The method according to claim 1 , further comprising the step of detecting said fault in the electrical power system.

9. The method according to claim 1 , further comprising the step of determining the distance to the fault from the measurement node.

10. The method according to claim 9 , further comprising the step of disconnecting a section of the electrical power system at the fault based on properties of the fault.

11. The method according to claim 1 , wherein the steps of storing the phase of a measured voltage, determining the phase of the measured voltage at the end of a time interval, determining a phase offset, adjusting the phase of the measured voltage with said phase offset and using the adjusted measured voltage in determining the direction of fault are repeated in relation to a detected sudden change of at least one electrical property measured at the measurement node.

12. The method according to claim 1 , wherein the phase of the measured voltage provided before and after the detection of the fault is part of a wave representation of the measured voltage or a vector representation of the measured voltage.

13. A fault handling device in an electrical power system and comprising:

a fault direction determining unit arranged to

receive voltage measurements (V) from a voltage detecting unit arranged to measure a voltage (V) at a measurement node of the electrical power system, and

store at least the phase (φ PF ) of the measured voltage (V PF ) before the occurrence of a fault in a storage device,

characterised by the fault direction determining unit being further arranged to determine at least the phase (φ F ) of the measured voltage (V F ) at the end of a time interval (TI) following directly after a detection of said fault has been made,

determine a phase offset (φ O ) as the difference between the phase (φ PF ) of the measured voltage (V PF ) before the fault and the phase (φ F ) of the measured voltage (V F ) at the end of the time interval (TI),

adjust the phase (φ F ) of the measured voltage (V F ) after the detection of the fault with said phase offset (φ O ), and

use the adjusted measured voltage in determining the direction of fault in relation to said measurement node.

14. The fault handling device according to claim 13 , wherein the fault direction determining unit is further arranged to use the phase (φ PF ) of the measured voltage (V PF ) before the fault as the phase (φ F ) of the adjusted measured voltage (V F ) after the fault before the offset is determined.

15. The fault handling device according to claim 13 , wherein the time interval (TI) has a length that is sufficient for enabling the phase (φ F ) of the measured voltage after the fault to be determined.

16. The fault handling device according to claim 15 , wherein the time interval (TI) is in the range between 1/10 and 100 periods of the measured voltage at the measurement node.

17. The fault handling device according to claim 16 , wherein the time interval (TI) is 1/10 of the period of the measured voltage at the measurement node.

18. The fault handling device according to claim 16 , wherein the time interval (TI) is one period of the measured voltage at the measurement node.

19. The fault handling device according to claim 16 , wherein the time interval (TI) is two periods of the measured voltage at the measurement node.

20. The fault handling device according to claim 13 , further comprising said voltage detecting unit being arranged to measure said voltage (V) at said measurement node of the electrical power system.

21. The fault handling device according to claim 13 , further comprising said storage device.

22. The fault handling device according to claim 13 , further comprising a fault detecting unit arranged to detect said fault in the electrical power system.

23. The fault handling device according to claim 13 , further comprising a distance determining unit arranged to determine the distance to the fault from the measurement node.

24. The fault handling device according to claim 13 , further comprising a fault handling decision unit arranged to order disconnection of a section of the electrical power system at the fault based on properties of the fault.

25. The fault handling device according to claim 13 , wherein the fault direction determining unit is arranged to repeat storing the phase of a measured voltage, determining the phase of the measured voltage at the end of a time interval, determining a phase offset, adjusting the phase of the measured voltage with said phase offset and using the adjusted measured voltage in determining the direction of fault in relation to a detected sudden change of at least one electrical property measured at the measurement node.

26. The fault handling device according to claim 13 , wherein the phase of the measured voltage provided before and after the detection of the fault is part of a wave representation of the measured voltage or a vector representation of the measured voltage.

27. A computer program product for determining the direction of fault in an electrical power system and comprising

computer program code provided on a computer readable medium and arranged to make a fault handling device in said electrical power system when said code is loaded into said device:

receive measurements of a voltage (V) at a measurement node of the electrical power system, and

store at least the phase (φ PF ) of the measured voltage (V PF ) before the occurrence of a fault,

characterised by the computer program code being further arranged to make the fault handling device when said code is loaded into said device

determine at least the phase (φ F ) of the measured voltage (V F ) at the end of a time interval (TI) following directly after a detection of said fault has been made,

determine a phase offset (φ O ) as the difference between the phase (φ PF ) of the measured voltage (V PF ) before the fault and the phase (φ F ) of the measured voltage (V F ) at the end of the time interval (TI),

adjust the phase (φ F ) of the measured voltage (V F ) after the detection of the fault with said phase offset (φ O ), and

use the adjusted measured voltage in determining the direction of fault in relation to said measurement node.

Assignments (6)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CORRECTIVE ASSIGNMENT TO CORRECT THE CONVEYING PARTY "ABB TECHNOLOGY LTD." SHOULD READ "ABB TECHNOLOGY AG" PREVIOUSLY RECORDED AT REEL: 040621 FRAME: 0714. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 11, 2022
From: ABB TECHNOLOGY AG
To: ABB SCHWEIZ AG
Reel/Frame 059927/0580 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
MERGER Recorded Nov 15, 2016
From: ABB TECHNOLOGY LTD.
To: ABB SCHWEIZ AG
Reel/Frame 040621/0714 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 18, 2010
From: AKKE, MAGNUS; WESTMAN, BJORN; ASHUVUD, HENRIK
To: ABB TECHNOLOGY AG
Reel/Frame 024558/0849 →