IP Library Granted Patent US 8,373,949
Granted Patent B2
US 8,373,949 · App. 12/816,576 · Granted Feb 12, 2013

Hybrid power plant for improved efficiency and dynamic performance

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,373,949
App. No.
12/816,576
Granted
Feb 12, 2013
Kind
B2
Abstract

A hybrid power plant is characterized by a substantially constant load on generators regardless of momentary swings in power load. Short changes in power load are accommodated by DC components such as capacitors, batteries, resistors, or a combination thereof. Resistors are used to consume power when loads in the power plant are generating excess power. Capacitors are used to store and deliver power when the loads in the power plant demand additional power. Reducing rapid changes in power load as seen by the generators allows the generators to operate at higher efficiencies and with reduced emissions. Additionally, power plants employing combinations of generators, loads, and energy storage devices have increased dynamic performance.

Claims (13)

1. A power plant, comprising:

an AC generator coupled to an AC bus;

an AC-to-DC converter coupled to the AC bus and a DC bus;

a switch coupled to the DC bus;

an AC load coupled to the AC bus;

a DC load coupled to the DC bus; and

an active power compensation system coupled to the switch, wherein the active power compensation system reduces power load variations in the power plant by delivering power to the AC load through the AC-to-DC converter when a power output of the AC generator is lower than a power demand of the AC load.

2. The power plant of claim 1 , in which the switch comprises a DC-to-DC converter.

3. The power plant of claim 1 , in which the active power compensation system comprises power consumption devices to consume power when a load on the power plant decreases.

4. The power plant of claim 3 , in which the power consumption devices are resistors.

5. The power plant of claim 3 , in which the active power compensation system further comprises at least one energy storage device to provide energy when the load on the power plant increases.

6. The power plant of claim 1 , in which the at least one energy storage device comprises at least one of an ultracapacitor, a capacitor, a battery, and a fly wheel.

7. The power plant of claim 6 , in which the at least one energy storage device is coupled to one or more microcontrollers, wherein the one or more microcontrollers regulate the at least one energy storage device.

Assignments (2)
CHANGE OF ADDRESS Recorded Dec 20, 2024
From: TRANSOCEAN SEDCO FOREX VENTURES LIMITED
To: TRANSOCEAN SEDCO FOREX VENTURES LIMITED
Reel/Frame 069868/0658 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 11, 2011
From: BOURGEAU, EDWARD P.
To: TRANSOCEAN SEDCO FOREX VENTURES LIMITED
Reel/Frame 025618/0733 →