System and method for the automatic generation of movement authority solutions in a rail system

Assignee: Lockheed Martin Corp.
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,295,999
App. No.
12/845,692
Granted
Oct 23, 2012
Kind
B2
Abstract

A dual-process system for the automatic generation of railway route-solution candidates and their concomitant movement authorities includes a central authority server that accepts dispatcher-provided start and end point data and time information and executes two different independent routing processes to provide two independently determined route-solution candidates. The two solutions are compared for consistency and, when consistent, the route with the minimum authority grants is selected as the solution for use by the locomotive or train.

Claims (12)

1. A dual-process system for the automatic generation of at least one movement authority solution between a start point and an end point for a locomotive or a train in a rail system, comprising:

means for accepting dispatcher-provided endpoints and time data in a rail system;

a stored-program controlled computing device executing two independent and different routing processes to provide two independently determined routing authority candidate solutions, one of said independent routing processes comprising an independent-object process and the other of said independent routing processes comprising a network-track process;

means for comparing the two candidate solutions for consistency and, when the two candidate solutions are consistent, designating the route solution with the minimum authority grants as the route solution for use by the locomotive or train.

2. The dual-process system of claim 1 , wherein the independent-object process includes track objects, one or more locomotive or train objects, and switch objects.

3. The dual-process system of claim 1 , wherein the network-track process interrogates at least one switch and at least one track between the endpoints for the presence of an authority.

4. A dual-process method for the automatic generation of movement authority solutions between a start point and end point for a locomotive or a train in a rail system, comprising:

accepting dispatcher-provided endpoints and time data in a rail trackway system;

executing two independent routing processes to provide two independently determined routing authority candidate solutions, one of said independent routing processes comprising an independent-object process and the other of said independent routing processes comprising a network-track process;

comparing the two candidate solutions for consistency and, when the two candidate solutions are consistent, designating the route with the minimum authority grants as the solution for use by the locomotive or train.

5. The dual-process method of claim 4 , wherein the independent-object process includes track objects, one or more locomotive or train objects, and switch objects.

6. The dual-process method of claim 4 , wherein the network-track process interrogates at least one switch and at least one track between the endpoints for the presence of an authority.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 1, 2023
From: LOCKHEED MARTIN CORPORATION
To: AUSTRALIAN RAIL TRACK CORPORATION LIMITED
Reel/Frame 062841/0282 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2010
From: GROVES, BLAINE R.; ALLSHOUSE, RICHARD A.
To: LOCKHEED MARTIN CORP.
Reel/Frame 024756/0751 →
Continuity (2)
Provisional Application 61231680 · Aug 6, 2009
Related Publication 20110035083A1 · Feb 10, 2011