IP Library Granted Patent US 8,465,568
Granted Patent B2
US 8,465,568 · App. 12/866,076 · Granted Jun 18, 2013

Method and a device for controlling the rapping of an ESP

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,465,568
App. No.
12/866,076
Granted
Jun 18, 2013
Kind
B2
Abstract

A method of controlling operation of an electrostatic precipitator ( 6 ) is provided wherein a soot-blowing operation is performed in an upstream device. According to the method, a signal is sent to a controller ( 34 ) that a soot-blowing operation is about to be initiated in the upstream device ( 2 ). The controller ( 34 ) is operative for controlling performance of a rapping event with respect to the electrostatic precipitator ( 6 ), and causes a rapping decision ( 52; 152 ) to be made, based on receipt of the signal. The rapping decision includes establishment of a first point in time (T 1 ) for initiating performance of a rapping event with respect to the electrostatic precipitator ( 6 ), such that said first point in time (T 1 ) is correlated to a second point in time (T 2 ). The second point in time (T 2 ) is the time at which the soot-blowing operation of upstream device ( 2 ) is initiated.

Claims (14)

1. A method of controlling the operation of an electrostatic precipitator comprising:

effecting sending of a signal that a soot-blowing operation is about to be initiated in an upstream device to a controller operative for controlling a rapping of an electrostatic precipitator to cause a rapping decision to be made by said controller, based on receipt thereby of said signal, said rapping decision including establishment of a first point in time (T 1 ) for initiating a rapping event with respect to the electrostatic precipitator, said first point in time (T 1 ) is correlated to a second point in time (T 2 ), which is a time at which the soot-blowing operation of said upstream device is initiated.

2. A method according to claim 1 , wherein said first point in time (T 1 ) is a time which occurs before said second point in time (T 2 ), such that the electrostatic precipitator ( 6 ) will be at least partially cleansed of dust particles before the soot-blowing operation of said upstream equipment ( 2 ) is initiated.

3. A method according to claim 1 , wherein the relationship of said first point in time (T 1 ) to said second point in time (T 2 ) is such that the performance of the rapping event with respect to the electrostatic precipitator is at least 50% completed before the soot-blowing operation of said upstream device is initiated.

4. A method according to claim 1 , wherein said soot-blowing operation comprises utilizing at least one soot-blowing substance selected from among steam and water, with said first point in time (T 1 ) established to occur after said second point in time (T 2 ), such that operation of the electrostatic precipitator is enhanced by virtue of a process gas having an increased moisture content from said soot-blowing substance.

5. A method according to claim 1 , wherein said soot-blowing operation comprises utilizing at least one soot-blowing substance selected from among steam and water, with said first point in time (T 1 ) established to occur a maximum of 60 minutes after said second point in time (T 2 ), such that operation of the electrostatic precipitator is enhanced by virtue of a process gas having an increased moisture content from said soot-blowing substance.

6. A method according to claim 1 , wherein said soot-blowing operation comprises utilizing at least one soot-blowing substance selected from among steam and water, with said first point in time (T 1 ) established to occur during the soot-blowing operation, such that operation of the electrostatic precipitator is enhanced by virtue of a process gas having an increased moisture content from said soot-blowing substance.

7. A method according to claim 1 , wherein said first point in time (T 1 ) is established to occur 0-5 minutes after completion of the soot-blowing operation.

8. A method according to claim 1 , wherein said controller causes a signal to be sent to a soot-blowing controller regarding the rapping status of the electrostatic precipitator, and said soot-blowing controller causes said second point in time (T 2 ) to be established relative to said rapping status.

9. A method according to claim 1 , wherein said signal also provides information regarding type of soot-blowing operation about to be initiated.

10. A device for controlling the operation of an electrostatic precipitator comprising:

a controller operative for controlling performance of a rapping event with respect to the electrostatic precipitator, for receiving a signal that a soot-blowing operation is about to be initiated in an upstream device, and for causing a rapping decision based on receipt of said signal, with said rapping decision including establishment of a first point in time (T 1 ) for initiating performance of a rapping event, correlated to a second point in time (T 2 ), which is a time at which the soot-blowing operation of said upstream device is initiated.

11. A device according to claim 10 , wherein said controller is operative for initiating performance of a rapping event at said first point in time (T 1 ), which occurs before said second point in time (T 2 ), such that the electrostatic precipitator is at least partially cleansed of dust particles before the soot-blowing operation of said upstream device is initiated.

12. A device according to claim 10 , wherein said controller is operative for establishing said first point in time (T 1 ) to occur after said second point in time (T 2 ), such that operation of the electrostatic precipitator is enhanced by process gas having an increased moisture content due to use of a soot-blowing substance in said soot-blowing operation.

Assignments (2)
CHANGE OF NAME Recorded Aug 17, 2016
From: ALSTOM TECHNOLOGY LTD
To: GENERAL ELECTRIC TECHNOLOGY GMBH
Reel/Frame 039714/0578 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 4, 2010
From: KARLSSON, ANDERS N.G.
To: ALSTOM TECHNOLOGY LTD
Reel/Frame 024787/0692 →