IP Library Granted Patent US 8,316,679
Granted Patent B2
US 8,316,679 · App. 12/897,083 · Granted Nov 27, 2012

Boronized laying pipe

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,316,679
App. No.
12/897,083
Granted
Nov 27, 2012
Kind
B2
Abstract

A laying pipe for use in the laying head of a rolling mill is configured for rotation about an axis, with an entry end aligned on that axis to receive a hot rolled product, and with a curved section leading to a delivery end spaced radially from that axis. The curved section defines a guide path configured to form the hot rolled product into a helical formation of rings. The laying pipe comprises a tubular ferrous wall having an interior surface comprising a wear resistant boronized layer against which the hot rolled product is confined for movement along the guide path.

Claims (13)

1. A laying pipe for use in the laying head of a rolling mill, said laying pipe configured for rotation about an axis, with an entry end aligned on said axis to receive a hot rolled product produced by said mill, and with a curved section leading to a delivery end spaced radially from said axis, said curved section defining a guide path configured to form the hot rolled product exiting from said delivery end into a helical formation of rings, said laying pipe comprising a tubular metal wall having an exterior surface and an interior surface against which said hot rolled product is confined for movement along said guide path, wherein both of said surfaces comprise wear resistant boronized layers.

2. The laying pipe of claim 1 , wherein said boronized layers are the result of a thermochemical treatment in which boron atoms are diffused into said surfaces.

3. The laying pipe of claim 1 , wherein the hardness of said tubular metal wall is between about 330 to 430 knoop (HK 100 ), and wherein said boronized layers have an increased hardness of between about 1600 to 2300 knoop (HK 100 ).

4. The laying pipe of claim 1 , wherein the metal of said tubular wall is selected from the group consisting of ferrous metals, nickel based alloys, titanium based alloys and cobalt based alloys.

5. The laying pipe of claim 1 , further comprising a second tubular metal wall surrounding said first mentioned tubular metal wall, with additional boronized layers on at least one of the interior and exterior surfaces of said second tubular metal wall.

6. The laying pipe of claim 5 , wherein both of the interior and exterior surfaces of said second tubular metal wall comprise wear resistant boronized layers.

7. A laying pipe for use in the laying head of a rolling mill, said laying pipe being configured for rotation about an axis, with an entry end aligned on said axis to receive a hot rolled product produced by said mill, and with a curved section leading to a delivery end spaced radially from said axis, said curved section defining a guide path configured to form the hot rolled product exiting from said delivery end into a helical formation of rings, said laying pipe comprising a tubular metal wall having an exterior surface and an interior surface against which said hot rolled product is confined for movement along said guide path, both of said surfaces comprises wear resistant boronized layers,

wherein the hardness of said tubular metal wall is between about 330 to 430 knoop (HK 100 ), wherein said boronized layer has an increased hardness of between about 1600 to 2300 knoop (HK 100 ), and wherein said boronized layers are the result of a thermochemical treatment in which boron atoms are diffused into the said surfaces.

8. The laying pipe of claim 7 , further comprising a second tubular metal wall surrounding said first mentioned tubular metal wall, with additional boronized layers on at least one of the interior and exterior surfaces of said second tubular metal wall.

9. The laying pipe of claim 8 , wherein both of the interior and exterior surfaces of said second tubular metal wall comprise wear resistant boronized layers.

10. A laying pipe for use in the laying head of a rolling said laying pipe being configured for rotation about an axis, with an entry end aligned on said axis to receive a hot rolled product produced by said mill, and with a curved section leading to a delivery end spaced radially from said axis, said curved section defining a guide path configured to form the hot rolled product exiting from said delivery end into a, helical formation of rings, said laying pipe comprising a tubular metal wall having an exterior surface and an interior surface against which said hot rolled product is confined for movement along said guide path, both of said surfaces comprises wear resistant boronized layers, wherein the metal of said tubular wall is selected from the group consisting of ferrous metals, nickel based alloys, titanium based alloys and cobalt based alloys, wherein the hardness of said tubular metal wall is between about 330 to 430 knoop (HK 100 ), and wherein said boronized layers have an increased hardness of between about 1600 to 2300 knoop (HK 100 ).

11. The laying pipe of claim 10 , further comprising a second tubular metal wall surrounding said first mentioned tubular metal wall, with additional boronized layers on at least one of the interior and exterior surfaces of said second tubular metal wall.

12. The laying pipe of claim 11 , wherein both of the interior and exterior surfaces of said second tubular metal wall comprise wear resistant boronized layers.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 1, 2016
From: SIEMENS INDUSTRY, INC.
To: PRIMETALS TECHNOLOGIES USA LLC
Reel/Frame 039230/0959 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 4, 2010
From: FIORUCCI, KEITH; LASHUA, CHRISTOPHER
To: SIEMENS INDUSTRY, INC.
Reel/Frame 025085/0787 →