IP Library Granted Patent US 8,651,190
Granted Patent B2
US 8,651,190 · App. 12/913,997 · Granted Feb 18, 2014

Shear boost triggering and bottle reducing system and method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,651,190
App. No.
12/913,997
Granted
Feb 18, 2014
Kind
B2
Abstract

Systems can be configured to move a ram block in a blowout preventer. The system includes: a first bank of accumulators configured to provide a first pressure to move the ram block; a second bank of accumulators configured to provide a second pressure to move the ram block, wherein the second pressure is greater than the first pressure; and a controller configured to sequentially control the first bank of accumulators to apply pressure to move the ram block and to then control the second bank of accumulators to move the ram block after the first bank of accumulators has moved the ram block a first distance.

Claims (22)

1. A system configured to move a ram block in a blowout preventer, the system comprising:

a source of pressurized fluid in selective communication with the ram block;

a position sensor in communication with an element coupled with the ram block; and

a controller in communication with the source of pressurized fluid and in communication with the position sensor, so that when the ram block moves into contact with a tubular and the position sensor communicates a signal to the controller indicating the element is at a designated position, the controller selectively increases a pressure of the fluid communicated to the ram block, wherein the controller estimates a velocity based on a duration of time from which the ram block moves from a first location and into contact with the tubular.

2. The system of claim 1 , wherein the position sensor comprises a magnet in the element that moves with the element and the ram block, and a magnetostrictive sensor disposed stationary with respect to the magnet, so that a signal from the magnetostrictive sensor to the controller indicates an exact location of the ram block.

3. The system of claim 1 , wherein the source of pressurized fluid comprises vessels having the pressurized fluid, and wherein a pressure in a one of the vessels is greater than a pressure in another one of the vessels.

4. The system of claim 1 , wherein the tubular comprises one of a tool or a drill string.

5. The system of claim 1 , wherein the ram block is a shear ram block located in the blowout preventer.

6. A system for use with a blowout preventer comprising:

a position sensor in locational communication with a ram block in the blowout preventer;

a low pressure accumulator containing a fluid that is in selective communication with the ram block;

a high pressure accumulator containing a fluid that is in selective communication with the ram block and at a pressure that is greater than a pressure of the fluid in the low pressure accumulator; and

a controller in communication with the position sensor, low pressure accumulator, and high pressure accumulator, so that when the controller estimates a velocity based on a duration of time from which the ram block moves from a first location and into contact with a tubular, the controller initiates communication between the high pressure accumulator and the ram block.

7. A method of operating a blowout preventer comprising:

monitoring a position of a ram block of the blowout preventer;

moving the ram block with fluid and towards a tubular in the blowout preventer;

estimating a velocity of the ram block based on a duration of time from which the ram block moves from a first location and into contact with the tubular;

and

increasing a pressure of the fluid when the ram block is monitored to be at a designated velocity.

8. The method of claim 7 , wherein the ram block is in contact with the tubular in the blowout preventer when in a designated location.

9. The method of claim 7 , further comprising continuing to provide the fluid so that the ram block shears the tubular in the blowout preventer.

10. The method of claim 7 , wherein the fluid is provided from vessels maintained at different pressures, so that the step of increasing a pressure of the fluid comprises providing fluid from a vessel having a higher pressure.

Assignments (2)
CHANGE OF NAME Recorded Sep 27, 2021
From: HYDRIL USA MANUFACTURING LLC
To: HYDRIL USA DISTRIBUTION LLC
Reel/Frame 057608/0915 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 28, 2010
From: DIETZ, DAVID ALBERT
To: HYDRIL USA MANUFACTURING LLC
Reel/Frame 025212/0003 →