IP Library Granted Patent US 8,365,541
Granted Patent B2
US 8,365,541 · App. 12/939,219 · Granted Feb 5, 2013

Method and apparatus using evaporator fan power requirements to determine defrost cycle for a refrigerator appliance

Inventors: Kenneth Joseph Hanley (Louisville, KY); Jeffrey Martin Wood (Louisville, KY); Martin Christopher Severance (Louisville, KY); Jason Andrew May (Prospect, KY)
Assignee: General Electric Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,365,541
App. No.
12/939,219
Granted
Feb 5, 2013
Kind
B2
Abstract

A refrigerator and a method of operating a refrigerator to determine the time at which to initiate a defrost cycle is provided. Changes in the voltage provided to an evaporator fan are used to determine and/or predict when to initiate a defrost cycle. Adjustments to the timing of the defrost cycle can be made based on known periods of peak energy demand and/or the increased costs associated with operating the defrost cycle during such peak energy demand periods.

Claims (54)

1. A method for determining a defrost cycle for a refrigerator, the refrigerator having a refrigeration cycle that includes an evaporator and evaporator fan, the steps comprising:

monitoring the power required operate the evaporator fan; and

determining whether the power required to operate the evaporator fan has reached a predetermined threshold and, if so, then

detecting whether the fan speed has reached a certain minimum value and, if so, then

initiating a defrost cycle for the refrigerator.

2. The method for determining a defrost cycle for a refrigerator as in claim 1 , wherein said steps of monitoring and determining comprise:

providing measurements of one or more of the i) the fan voltage supplied to the evaporator fan, ii) the current supplied to the evaporator fan, iii) the resistance load, and iv) the inductive load that includes the evaporator fan;

ascertaining whether one or more of the measurements from said providing step have reached a threshold value and, if so, then

detecting whether the fan speed has reached a certain minimum value and, if so, then

initiating a defrost cycle for the refrigerator.

3. The method for determining a defrost cycle for a refrigerator as in claim 1 , wherein the defrost cycle is initiated at time T def and the method further comprises the steps of:

ascertaining whether the power requirement for the evaporator fan is increasing and, if so, then

predicting the time, T def , at which a defrost cycle should be initiated for the refrigerator; and

adjusting the time, T def , at which a defrost cycle should be initiated.

4. The method for determining a defrost cycle for a refrigerator as in claim 3 , wherein said adjusting step comprises delaying the time, T def , at which a defrost cycle should be initiated.

5. The method for determining a defrost cycle for a refrigerator as in claim 3 , wherein said adjusting step comprises advancing the time, T def , at which a defrost cycle should be initiated.

6. The method for determining a defrost cycle for a refrigerator as in claim 1 , wherein the defrost cycle is initiated at time T def and the method further comprises the steps of:

ascertaining whether the power requirement for the evaporator fan is increasing and, if so, then

predicting the time, T def at which a defrost cycle should be initiated for the refrigerator;

determining whether the time, T def , at which the defrost cycle should be initiated is during a period of peak energy demand and, if so,

adjusting the time, T def , at which a defrost cycle should be initiated.

7. The method for determining a defrost cycle for a refrigerator as in claim 6 , wherein said adjusting step comprises delaying the time, T def , at which the defrost cycle should be initiated.

8. The method for determining a defrost cycle for a refrigerator as in claim 6 , wherein said adjusting step comprises advancing the time, T def , at which the defrost cycle should be initiated.

9. The method for determining a defrost cycle for a refrigerator as in claim 1 , wherein the defrost cycle is initiated at time T def and the method further comprises the steps of:

ascertaining whether the power requirement for the evaporator fan is increasing and, if so, then

predicting the time, T def at which a defrost cycle should be initiated for the refrigerator;

determining whether the time, T def , at which the defrost cycle should be initiated is during a period of peak energy demand and, if so,

calculating the difference in the energy cost for initiating the defrost cycle during the period of peak energy demand versus during a period of non-peak energy demand; and

using the results of said calculating step to determine whether the time, T def , from said predicting step should be adjusted.

10. The method for determining a defrost cycle for a refrigerator as in claim 9 , further comprising the step of delaying the time, T def , at which the defrost cycle should be initiated.

11. The method for determining a defrost cycle for a refrigerator as in claim 9 , further comprising the step of advancing the time, T def , at which the defrost cycle should be initiated.

12. The method for determining a defrost cycle for a refrigerator as in claim 1 , wherein said steps of monitoring and determining comprise:

measuring the fan voltage supplied to the evaporator fan; and

ascertaining whether the fan voltage has reached a predetermined voltage, V def , and, if so, then

detecting whether the fan speed has reached a certain minimum value and, if so, then

initiating a defrost cycle for the refrigerator.

13. A refrigerator appliance, comprising:

an evaporator;

a fan for moving air over the evaporator for circulation within the refrigerator;

at least one processing device configured to

receive measurements of the power supplied to the fan; and

determine whether the power requirement for the fan has reached a predetermined value and, if so,

detect whether the fan speed has reached a certain minimum value and, if so, then

initiate a defrost cycle for the refrigerator at time T def .

14. The refrigerator appliance as in claim 13 , wherein said processing device is further configured to

ascertain whether the power requirement for the fan is increasing and, if so, then

predict the time, T def , at which a defrost cycle should be initiated for the refrigerator.

15. The refrigerator appliance as in claim 14 , wherein if time T def would occur during a period of peak energy demand, said processing device is further configured to adjust the time, T def , at which the defrost cycle should be initiated.

16. The refrigerator appliance as in claim 15 , wherein said processing device is further configured to delay the time, T def , at which the defrost cycle should be initiated.

17. The refrigerator appliance as in claim 15 , wherein said processing device is further configured to advance the time, T def , at which the defrost cycle should be initiated.

18. The refrigerator appliance as in claim 14 , wherein if the time T def for initiating a defrost would occur during a period of peak energy demand, said processing device is further configured to

calculate the difference in the energy cost for initiating the defrost cycle during the period of peak demand versus during a period a non-peak period of demand; and

adjust the time, T def , for initiating the defrost to a different time if such will lower the energy cost for operating the refrigerator.

19. The refrigerator appliance as in claim 18 , wherein said refrigerator further comprises an input device whereby the per energy unit costs of electricity for operating the refrigerator may be provided to said processor.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 13, 2016
From: GENERAL ELECTRIC COMPANY
To: HAIER US APPLIANCE SOLUTIONS, INC.
Reel/Frame 038968/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 4, 2010
From: HANLEY, KENNETH JOSEPH; WOOD, JEFFREY MARTIN; SEVERANCE, MARTIN CHRISTOPHER; MAY, JASON ANDREW
To: GENERAL ELECTRIC COMPANY
Reel/Frame 025245/0881 →
Continuity (1)
Related Publication 20120047920A1 · Mar 1, 2012