IP Library Granted Patent US 8,474,261
Granted Patent B2
US 8,474,261 · App. 12/988,548 · Granted Jul 2, 2013

Steam generation system having a main and auxiliary steam generator

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,474,261
App. No.
12/988,548
Granted
Jul 2, 2013
Kind
B2
Abstract

A steam generation system comprises a main steam generator and a back-up steam generator ( 20 ) which are both in fluid communication with a super heater ( 3 ) for superheating the generated steam. The superheater comprises a main heat source ( 6 ) for heating up a flow of heating gas. A back-up evaporator ( 2 ) is provided as a back-up steam generator for evaporating supplied water into steam. The back-up evaporator is connected in parallel to the main steam generator. An auxiliary heat source is provided for heating up the back-up evaporator. By controlling the auxiliary heat source ( 9 ), it is possible to supply more or less heat energy to the back-up evaporator to compensate for fluctuations in steam production of the main steam generator. The back-up evaporator is positioned away from the flow of heating gasses departing from the main heat source.

Claims (35)

1. A steam generation system comprising:

a main steam generator having a fluctuating steam production;

a superheater which comprises a main heat source for heating the superheater by a main stream of heating gasses, in which the main stream of heating gasses is guided by a gas conduit and extends from the main heat source along the superheater to an open end of the gas conduit; and

a back-up evaporator for evaporating supplied water into steam to compensate for fluctuations in the steam production of said main steam generator, which back-up evaporator is connected in parallel with the main steam generator, in which both said main steam generator and said back-up evaporator are in fluid communication with said superheater for superheating generated steam;

wherein a separate auxiliary heat source is provided for heating the back-up evaporator by an auxiliary stream of heating gasses and a control system for controlling the auxiliary heat source, wherein the back-up evaporator is positioned outside the main stream of heating gasses.

2. The steam generation system according to claim 1 , such that the back-up evaporator is during use only heated by the auxiliary heat source.

3. The steam generation system according to claim 1 , wherein the main steam generator is a solar field.

4. The steam generation system according to claim 1 , wherein the main heat source is a main combustion burner.

5. The steam generation system according to claim 1 , wherein the auxiliary heat source is an auxiliary combustion burner.

6. The steam generation system according to claim 1 , wherein the back-up evaporator and auxiliary heat source are positioned outside the gas conduit.

7. The steam generation system according to claim 1 , wherein the back-up evaporator, the auxiliary heat source, the superheater, and the main heat source are arranged within one gas conduit, wherein the back-up evaporator is positioned in the gas conduit upstream of the main heat source with respect of the flow direction of the main heating gasses through the gas conduit from the main heat source along the superheater to the open end.

8. The steam generation system according to claim 7 , wherein the back-up evaporator is arranged in the gas conduit between the main heat source and the auxiliary heat source.

9. The steam generation system according to claim 1 , wherein the control system uses an input signal which is based on a measurement of steam flow or steam pressure in a conduit extending from the superheater to a steam turbine.

10. Steam generation system according to claim 1 , wherein the control system uses an input signal which is based on a measurement of waterflow in a conduit extending to the back-up evaporator.

11. The steam generation system according to claim 1 , wherein the steam generation system comprises an economizer to heat up supplied water and further cool down the heating gasses.

12. A power plant for generating electricity from steam comprising a steam turbine for generating electricity out of steam and a steam generation system, wherein the steam generation system comprises:

a main steam generator having a fluctuating steam production;

a superheater which comprises a main heat source for heating the superheater by a main stream of heating gasses, in which the main stream of heating gasses is guided by a gas conduit and extends from the main heat source along the superheater to an open end of the gas conduit; and

a back-up evaporator for evaporating supplied water into steam to compensate for fluctuations in the steam production of said main steam generator, which back-up evaporator is connected in parallel with the main steam generator, in which both said main steam generator and said back-up evaporator are in fluid communication with said superheater for superheating generated steam;

wherein a separate auxiliary heat source is provided for heating the back-up evaporator by an auxiliary stream of heating gasses and a control system for controlling the auxiliary heat source, wherein the back-up evaporator is positioned outside the main stream of heating gasses.

13. A method for compensating for changes in steam generating production of a solar field, comprising:

utilizing the steam generation system according to claim 1 .

14. A method for generating steam comprising the steps of:

operating a main steam generator having a fluctuating steam production;

operating a back-up evaporator for evaporating supplied water into steam to compensate for fluctuations in the steam production of said main steam generator, which back-up evaporator is connected in parallel with the main steam generator;

operating a main heat source to heat a superheater by a main stream of heating gasses, in which both said main steam generator and said back-up evaporator provide steam to said superheater to generate superheated steam;

operating an auxiliary heat source to heat the back-up evaporator; and

controlling a control system to control the auxiliary heat source;

wherein the main stream of heating gasses is guided along the superheater in a direction away from the back-up evaporator.

15. The steam generation system according to claim 1 , wherein the following elements are disposed within the gas conduit in the following sequence starting at an upstream end of the gas conduit with respect to the main and auxiliary streams of heating gasses, and progressing downstream: the auxiliary heat source, the auxiliary stream of heating gasses, the back-up evaporator, the main heat source, the main stream of heating gasses, and the superheater.

16. The steam generation system according to claim 15 , wherein the main steam generator is disposed outside of the gas conduit, and further comprising an economizer in the gas conduit immediately downstream of the superheater with respect to the main stream of heating gasses.

17. The steam generation system according to claim 16 , wherein the main steam generator comprises a solar field.

18. The power plant according to claim 12 , wherein the following elements are disposed within the gas conduit in the following sequence starting at an upstream end of the gas conduit with respect to the main stream of heating gasses, and progressing downstream: the auxiliary heat source, the auxiliary stream of heating gasses, the back-up evaporator, the main heat source, the main stream of heating gasses, and the superheater.

19. The steam generation system according to claim 18 , wherein the main steam generator is disposed outside of the gas conduit, and further comprising an economizer in the gas conduit immediately downstream of the superheater with respect to the main stream of heating gasses.

20. The steam generation system according to claim 19 , wherein the main steam generator comprises a solar field.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 19, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 056500/0414 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 27, 2018
From: NEM ENERGY B. V.
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 045654/0675 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 30, 2011
From: NEM B.V.
To: NEM ENERGY B.V.
Reel/Frame 027304/0967 →