IP Library Granted Patent US 9,057,626
Granted Patent B2
US 9,057,626 · App. 13/005,826 · Granted Jun 16, 2015

Advanced metering infrastructure (AMI) cartridge for an energy meter

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,057,626
App. No.
13/005,826
Granted
Jun 16, 2015
Kind
B2
Abstract

An advanced metering infrastructure (AMI) cartridge includes an AMI cartridge housing having an interior zone, and an AMI module system supported within the interior zone of the AMI cartridge module housing. The AMI module system includes an AMI module and an energy meter interface configured and disposed to detachably connect to an energy meter.

Claims (24)

1. An advanced metering infrastructure (AMI) cartridge comprising:

an AMI cartridge housing including an interior zone; and

an AMI module system supported within the interior zone of the AMI cartridge, the AMI module system including an AMI module and an energy meter interface configured and disposed to detachably connect to an energy meter.

2. The AMI cartridge according to claim 1 , further comprising: an adapter interface arranged within the interior zone of the AMI cartridge housing and operatively connected to the AMI module system.

3. The AMI cartridge according to claim 2 , wherein the AMI module system includes at least one communication port configured and disposed to communicate with a remote system.

4. The AMI cartridge according to claim 2 , wherein the at least one communication port includes one of an RS-232 port, a sub-miniature version D port, an RJ45 port, and a sub-miniature version A port.

5. The AMI cartridge according to claim 1 , wherein the AMI cartridge housing includes a first housing member and a second housing member that collectively define the interior zone.

6. The AMI cartridge according to claim 5 , wherein the first housing member includes an energy meter interface member that is configured and disposed to matingly engage with an energy meter.

7. The AMI cartridge according to claim 5 , wherein the first housing member includes at least one communication port receiving element.

8. The AMI cartridge according to claim 7 , wherein the at least one communication port receiving element includes at least one edge portion that defines an opening in the first housing member.

9. The AMI cartridge according to claim 8 , wherein the at least one communication port receiving element comprises a plurality of communication port receiving elements formed in the first housing member.

10. The AMI cartridge according to claim 9 , further comprising: a knock-out element formed in at least one of the plurality of communication port receiving elements.

11. An energy meter comprising:

a meter housing;

an energy usage measuring system arranged within the meter housing, the energy usage measuring system including an advanced metering infrastructure (AMI) module interface member; and

an AMI cartridge operatively connected to the energy usage measuring system, the AMI cartridge including:

an AMI cartridge housing including an interior zone; and

an AMI module system supported within the interior zone of the AMI cartridge housing, the AMI module system including an AMI module and an energy meter interface configured and disposed to detachably connect to the AMI module interface member of the energy meter.

12. The energy meter according to claim 11 , wherein the AMI module system includes an adapter interface arranged within the interior zone of the housing and operatively connected to the AMI module.

13. The energy meter according to claim 11 , wherein the AMI module system includes at least one communication port configured and disposed to communicate with a remote system.

14. The energy meter according to claim 12 , wherein the communication port includes one of an RS-232 port, a sub-miniature version D port, an RJ45 port, and a sub-miniature version A port.

15. The energy meter according to claim 11 , wherein the AMI cartridge housing includes a first housing member and a second housing member that collectively define the interior zone.

16. The energy meter according to claim 15 , wherein the first housing member includes an energy meter interface member that is configured and disposed to matingly engage with the energy meter.

17. The energy meter according to claim 15 , wherein the first housing member includes at least one communication port receiving element.

Assignments (9)
TERMINATION AND RELEASE OF PATENT SECURITY AGREEMENT Recorded Mar 5, 2018
From: PNC BANK, NATIONAL ASSOCIATION
To: MRH METERS LLC
Reel/Frame 046117/0792 →
RELEASE OF SECURITY INTEREST Recorded Feb 5, 2018
From: MORGAN STANLEY SENIOR FUNDING, INC.
To: ACLARA TECHNOLOGIES LLC; ACLARA METERS LLC
Reel/Frame 045245/0231 →
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Aug 30, 2016
From: CERBERUS BUSINESS FINANCE, LLC
To: ACLARA TECHNOLOGIES LLC; ACLARA METERS LLC F/K/A MRH METERS LLC
Reel/Frame 039880/0908 →
SECURITY AGREEMENT Recorded Aug 30, 2016
From: ACLARA TECHNOLOGIES LLC; ACLARA METERS LLC
To: MORGAN STANLEY SENIOR FUNDING, INC., AS COLLATERAL AGENT
Reel/Frame 039872/0227 →
CHANGE OF NAME Recorded Feb 18, 2016
From: MRH METERS LLC
To: ACLARA METERS LLC
Reel/Frame 037852/0418 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 30, 2015
From: GENERAL ELECTRIC COMPANY
To: MRH METERS LLC (F/K/A LJF METERS LLC)
Reel/Frame 037398/0877 →
PATENT SECURITY AGREEMENT Recorded Dec 22, 2015
From: MRH METERS LLC
To: CERBERUS BUSINESS FINANCE, LLC, AS AGENT
Reel/Frame 037362/0603 →
SECURITY INTEREST Recorded Dec 22, 2015
From: MRH METERS LLC
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 037359/0375 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 16, 2011
From: AGRAWAL, SACHIN
To: GENERAL ELECTRIC COMPANY
Reel/Frame 027400/0131 →