IP Library Granted Patent US 8,897,922
Granted Patent B2
US 8,897,922 · App. 13/008,162 · Granted Nov 25, 2014

Wind farm power control based on matrix reflecting a power load distribution between individual wind turbines

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,897,922
App. No.
13/008,162
Granted
Nov 25, 2014
Kind
B2
Abstract

A method for controlling the operation of a wind farm with a plurality of wind turbines is disclosed A setpoint vector is defined, wherein each component of the setpoint vector represents an individual power setpoint of one of the plurality of wind turbines. A dependency matrix, which reflects a desired power generation distribution between different wind turbines of the plurality of wind turbines, is determined. A power reference vector is calculated by multiplying the dependency matrix with the setpoint vector, such that the power reference vector comprises a coordinated power setpoint for each wind turbine. The operation of the wind farm is controlled based on the calculated power reference vector. A superordinate control system, a wind farm, a computer-readable medium and a program element, which are adapted for performing and/or for controlling the above described wind farm operation control method are further disclosed.

Claims (30)

1. A method for controlling an operation of a wind farm comprising a plurality of wind turbines, the method comprising

defining a setpoint vector, wherein each component of the setpoint vector represents an individual power setpoint of one of the plurality of wind turbines;

determining a dependency matrix, which reflects a desired power generation distribution between different wind turbines of the plurality of wind turbines;

calculating a power reference vector by multiplying the dependency matrix with the setpoint vector, such that the power reference vector comprises a coordinated power setpoint for each wind turbine; and

controlling the operation of the wind farm based on the calculated power reference vector,

wherein calculating the power reference vector further comprises adding a correction vector to the result of multiplying the dependency matrix with the setpoint vector, and

wherein the correction vector comprises a power correction value for each wind turbine, whereby each power correction value is indicative for a requested time rate of change of the total power output of the wind farm.

2. The method as set forth in claim 1 , wherein each individual power setpoint is determined based on an individual nominal power output of the respective wind turbine and a requested total power output of the whole wind farm.

3. The method as set forth in claim 2 , wherein a sum of all individual power setpoints corresponds to the requested total power output of the whole wind farm.

4. The method as set forth in claim 1 , wherein each power correction value is proportional to the time derivative of the requested total power output of the wind farm.

5. The method as set forth in claim 4 , wherein each power correction value is proportional to the negative time derivative of the requested total power output of the wind farm.

6. The method as set forth in claim 1 , wherein at least one element of the dependency matrix depends on a type of operation of at least one wind turbine.

7. A superordinate control system for controlling the operation of a wind farm comprising a plurality of wind turbines, the superordinate control system comprising

a definition unit for defining a setpoint vector, wherein each component of the setpoint vector represents an individual power setpoint of one of the plurality of wind turbines;

a determination unit for determining a dependency matrix, which reflects a desired power generation distribution between different wind turbines of the plurality of wind turbines;

a calculation unit for calculating a power reference vector by multiplying the dependency matrix with the setpoint vector, such that the power reference vector comprises a coordinated power setpoint for each wind turbine; and

a control unit for controlling the operation of the wind farm based on the calculated power reference vector,

wherein calculating the power reference vector further comprises adding a correction vector to the result of multiplying the dependency matrix with the setpoint vector, and

wherein the correction vector comprises a power correction value for each wind turbine, whereby each power correction value is indicative for a requested time rate of change of the total power output of the wind farm.

8. The superordinate control system as set forth in claim 7 , further comprising a computer-readable medium on which there is stored a computer program which when being executed by a data processor is adapted for controlling the operation of a plurality of wind turbines.

9. A wind farm for generating electric power, the wind farm comprising

a plurality of wind turbines each comprising an individual control unit for controlling the operation of the respective wind turbine; and

a superordinate control system for controlling the operation of a wind farm comprising a plurality of wind turbines, the superordinate control system comprising:

a definition unit for defining a setpoint vector, wherein each component of the setpoint vector represents an individual power setpoint of one of the plurality of wind turbines,

a determination unit for determining a dependency matrix, which reflects a desired power generation distribution between different wind turbines of the plurality of wind turbines,

a calculation unit for calculating a power reference vector by multiplying the dependency matrix with the setpoint vector, such that the power reference vector comprises a coordinated power setpoint for each wind turbine, and

a control unit for controlling the operation of the wind farm based on the calculated power reference vector,

wherein the superordinate control system is connected to each individual control unit,

wherein calculating the power reference vector further comprises adding a correction vector to the result of multiplying the dependency matrix with the setpoint vector, and

wherein the correction vector comprises a power correction value for each wind turbine, whereby each power correction value is indicative for a requested time rate of change of the total power output of the wind farm.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 18, 2011
From: EGEDAL, PER; KRISHNA, RAMAKRISHNAN
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 025652/0273 →