IP Library Granted Patent US 8,409,339
Granted Patent B2
US 8,409,339 · App. 13/013,448 · Granted Apr 2, 2013

CO

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,409,339
App. No.
13/013,448
Granted
Apr 2, 2013
Kind
B2
Abstract

A CO 2 recovery system includes an absorption tower and a regeneration tower. CO 2 rich solution is produced in the absorption tower by absorbing CO 2 from CO 2 -containing gas. The CO 2 rich solution is conveyed to the regeneration tower where lean solution is produced from the rich solution by removing CO 2 . A regeneration heater heats lean solution that accumulates near a bottom portion of the regeneration tower with saturated steam thereby producing steam condensate from the saturated steam. A steam-condensate heat exchanger heats the rich solution conveyed from the absorption tower to the regeneration tower with the steam condensate.

Claims (9)

1. A CO 2 recovery system including an absorption tower that receives CO 2 -containing gas and CO 2 -absorbing solution, and causes the CO 2 -containing gas to come in contact with the CO 2 -absorbing solution to produce CO 2 rich solution, and a regeneration tower, including an upper-portion regeneration tower and a lower-portion regeneration tower, that receives the rich solution and produces lean solution from the rich solution by removing CO 2 from the rich solution, the CO 2 recovery system comprising:

a bottom lean-solution extraction path that extracts lean solution that accumulates near a bottom portion of the regeneration tower from a first point of the regeneration tower and returns extracted lean solution to a second point of the regeneration tower that is downstream of the first point;

a regeneration heater arranged in the bottom lean-solution extraction path and heats the lean solution in the bottom lean-solution extraction path with saturated steam thereby producing steam condensate from the saturated steam;

a steam-condensate heat exchanger that heats, with the steam condensate, either one of

(a) the rich solution that is supplied from the absorption tower to the regeneration tower, and

(b) a semi-lean solution that is extracted outside from a middle portion of the regeneration tower and returned to the middle portion of the regeneration tower;

an upper semi-lean-solution extraction path that extracts semi-lean solution from an eleventh point of the upper-portion regeneration tower and returns extracted semi-lean solution to a twelfth point of the upper-portion regeneration tower that is downstream of the eleventh point;

a lean-solution supply member that extracts the lean solution from the regeneration tower and conveys extracted lean solution to the absorption tower; and

a lean-solution heat exchanger that is arranged in the upper semi-lean-solution extraction path and the lean-solution supply member and heats the semi-lean solution in the upper semi-lean-solution extraction path with the lean solution in the lean-solution supply member.

Assignments (3)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 12, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
Reel/Frame 047054/0898 →