Power production control method based on power production rate requirement

Inventors: Andreas Kirchner (Osnabruek, DE); Enno Ubben (Steinfurt, DE)
Assignee: General Electric Company
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,744,635
App. No.
13/017,693
Granted
Jun 3, 2014
Kind
B2
Abstract

A control system for an energy production facility includes a plant controller for receiving an indication of a measured power output of the energy production facility that includes power generators and produces output signals. The system also includes a processing unit operably coupled to the plant controller and responsive to executable computer instructions when executed on the processing unit cause the plant controller to: create an output signal that causes an energy storage device to discharge in the event power reserves of the power generators can not met the requested ramp down rate; and create an output signal that causes the energy storage device to charge up in the event that the power capability of the power generators can meet the requested ramp down rate.

Claims (16)

1. A method of operating a power production facility, the method comprising:

receiving at a plant controller a current power production rate of the power production facility;

receiving a power production rate requirement at the plant controller from a utility receiving power from the power production facility;

determining at the plant controller that the current power production rate is either below or above the power production rate requirement;

transmitting a signal from the plant controller to cause a power producing device to charge an energy storage device in the event that the current power production rate is above the power production rate requirement or to cause the energy storage device discharge in the event that the current power production rate is below the power production rate requirement; and

providing a signal to the utility that indicates a ramp rate availability of the power production facility, the ramp rate availability being calculated based on a relation between a possible power of the power production facility, a power set point, and a charge status of the energy storage device.

2. The method of claim 1 , further comprising:

transmitting a signal from the plant controller to cause the power producing device to ramp up in the event that the power production rate is above the power production rate requirement; and

transmitting a signal from the plant controller to cause the energy storage device to store energy.

3. The method of claim 1 , further comprising:

receiving a signal at the plant controller that the energy storage device is fully charged; and

transmitting a signal from the plant controller to cause the power producing device to ramp down.

4. The method of claim 1 , further comprising:

providing an indication of a frequency at the output of a power production facility to the plant controller.

5. The method of claim 1 , further comprising:

creating a signal that causes power production devices coupled to the plant controller to vary operation based on the frequency at the output of the power production facility.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 14, 2023
From: GENERAL ELECTRIC COMPANY
To: GE GRID SOLUTIONS LLC
Reel/Frame 066000/0694 →
Continuity (2)
Division 12582053 · Oct 20, 2009
Related Publication 20110125340A1 · May 26, 2011