Method for engineering connections in a dynamically reconfigurable photonic switched network

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,396,359
App. No.
13/043,136
Granted
Mar 12, 2013
Kind
B2
Abstract

A method for engineering of a connection in a WDM photonic network with a plurality of flexibility sites connected by links comprises calculating a physical end-to-end route between a source node and a destination node and setting-up a communication path along this end-to-end route. An operational parameter of the communication path is continuously tested and compared with a test threshold. The path is declared established whenever the operational parameter is above the margin tolerance. The established path is continuously monitored by comparing the operational parameter with a maintenance threshold. A regenerator is switched into the path whenever the operational parameter is under the respective threshold, or another path is assigned to the respective connection. An adaptive channel power turn-on procedure provides for increasing gradually the power level of the transmitters in the path while measuring an error quantifier at the destination receiver until a preset error quantifier value is reached. As the connection ages, the power is increased so as to maintain the error quantifier at, or under the preset value. The path operation is controlled using a plurality of optical power/gain control loops, each for monitoring and controlling a group of optical devices, according to a set of loop rules.

Claims (30)

1. A method of engineering a connection between two terminals of a dynamically reconfigurable photonic network comprising:

setting-up a path whenever an operational parameter of said path is above a test threshold;

operating said path in monitoring mode whenever an operational parameter is above a maintenance threshold; and

servicing said path whenever said operational parameter is under said maintenance threshold.

2. A method as claimed in claim 1 , wherein the step of setting-up comprises:

selecting a physical route for said path based on network topology information, resources specifications and path selection rules;

assigning ‘n’ wavelength to said path based on wavelength selection rules and the number ‘m’ of regenerators connected in said path;

lighting-up said path and measuring said operational parameter;

comparing said operational parameter with said test threshold; and

transiting the state of said path form set-up to established if said operational parameter is above said test threshold.

3. A method as claimed in claim 2 , further comprising switching a wavelength-converter/regenerator device into said path whenever said operational parameter is under said test threshold.

4. A method as claimed in claim 2 , further comprising selecting a new physical route and switching said path along said new route whenever said operational parameter is under said test threshold.

5. A method as claimed in claim 1 , wherein the step of operating said path in a monitoring mode comprises:

continuously measuring said operational parameter,

continuously comparing said operational parameter with a maintenance threshold; and

switching a wavelength-converter/regenerator device into said path whenever said operational parameter is under said maintenance threshold.

6. A method as claimed in claim 5 , further comprising transitioning from said operational state to a tearing down state if said operational parameter is under said margin tolerance after said device has been switched into said path.

7. A method as claimed in claim 1 , wherein the step of operating said path in a monitoring mode comprises:

continuously measuring said operational parameter,

continuously comparing said operational parameter with a maintenance threshold; and

selecting a new physical route and switching said path along said new route whenever said operational parameter is under said maintenance threshold.

8. A method of engineering a connection over a WDM photonic network with a plurality of flexibility sites, comprising:

selecting a data communication path for said connection based on network topology information, resources specifications and class of service constraints;

turning on a source transmitter, a destination receiver and all transmitters and receivers at all flexibility sites along said path;

increasing gradually the power level of said transmitters while measuring an error quantifier at said destination receiver; and

maintaining the power at said transmitters at a first level corresponding to a preset error quantifier.

9. A method as claimed in claim 8 , further comprising:

operating said path in a monitoring mode by continuously measuring the error quantifier at said destination receiver;

increasing the power level of said transmitter from said first level while measuring the error quantifier at said destination receiver; and

maintaining the power level for said connection at a second level where said error quantifier is below said preset error quantifier.

Assignments (10)
RELEASE OF SECURITY INTEREST Recorded Oct 9, 2014
From: CREDIT SUISSE AG
To: ALCATEL-LUCENT USA INC.
Reel/Frame 033949/0016 →
RELEASE OF SECURITY INTEREST Recorded Sep 30, 2014
From: CREDIT SUISSE AG
To: ALCATEL LUCENT
Reel/Frame 033868/0555 →
SECURITY INTEREST Recorded Mar 7, 2013
From: ALCATEL-LUCENT USA INC.
To: CREDIT SUISSE AG
Reel/Frame 030510/0627 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 5, 2013
From: ALCATEL-LUCENT USA INC.
To: ALCATEL LUCENT
Reel/Frame 029753/0173 →
SECURITY AGREEMENT Recorded Jan 30, 2013
From: ALCATEL LUCENT
To: CREDIT SUISSE AG
Reel/Frame 029821/0001 →
MERGER Recorded Jan 29, 2013
From: LUCENT TECHNOLOGIES INC.
To: ALCATEL-LUCENT USA INC.
Reel/Frame 029709/0326 →
SECURITY AGREEMENT Recorded Jan 24, 2013
From: INNOVANCE, INC.
To: GATX/MM VENTURE FINANCE PARTNERSHIP
Reel/Frame 029683/0977 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2013
From: INNOVANCE INC.
To: LUCENT TECHNOLOGIES INC.
Reel/Frame 029686/0108 →
SECURITY INTEREST Recorded Jan 24, 2013
From: INNOVANCE, INC.
To: AZURE VENTURE PARTNERS I, L.P.; THOMAS WEISEL CAPITAL PARTNERS, L.P.; TWP CEO FOUNDERS' CIRCLE (AI), L.P.; TWP CEO FOUNDERS' CIRCLE (QP), L.P.; THOMAS WEISEL CAPITAL PARTNERS (DUTCH), L.P.; THOMAS WEISEL CAPITAL PARTNERS (DUTCH II), L.P.; THOMAS WEISEL CAPITAL PARTNERS EMPLOYEE FUND, L.P.; THOMAS WEISEL CAPITAL PARTNERS PARTNER FUND LLC; MORGENTHALER PARTNERS VI, L.P.; AZURE VENTURE PARTNERS I, L.P. ATTN: RAY CAREY; AZURE VENTURES I, L.P.; AZURE PARTNERS I, L.P.; AZURE I, L.P.; KALKHOVEN, PETTIT, LEVIN & JOHNSON VENTURES LLC; ADVANCED TECHHOLOGY VENTURES VI, L.P. BY; ATV ASSOCIATES VI, L.L.C. ITS GENERAL PARTNER; ATV ENTREPRENEURS VI, L.P.
Reel/Frame 029684/0679 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2013
From: ZHOU, JINGYU; SOLHEIM, ALAN GLEN; AU-YANG, ROBERT; WIGHT, MARK STEPHEN; SCHEERER, CHRISTIAN
To: INNOVANCE NETWORKS
Reel/Frame 029683/0374 →