Operation method of nuclear power plant

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,453,451
App. No.
13/046,294
Granted
Jun 4, 2013
Kind
B2
Abstract

In a nuclear power plant, thermal power in a second operation cycle of a nuclear reactor is uprated from thermal power in a first operation cycle preceding the second operation cycle by at least one operation cycle. A proportion of steam extracted from a steam system and introduced to a feedwater heater, which is in particular extracted from an intermediate point and an outlet of a high pressure turbine, with respect to a flow rate of main steam, is reduced in the second operation cycle from that in the first operation cycle such that the temperature of feedwater discharged from the feedwater heater is lowered by 1° C. to 40° C. in the second operation cycle.

Claims (11)

1. A nuclear power plant comprising:

a nuclear reactor;

a steam system including a high pressure turbine and a lower pressure turbine, which are supplied with steam generated in said nuclear reactor;

a condenser for condensing the steam discharged from said low pressure turbine;

a plurality of feedwater heaters for heating feedwater supplied from said condenser;

at least one extraction line for extracting the steam from said steam system and introducing the extracted steam to corresponding one of said feedwater heaters;

a feedwater system for introducing the feedwater from said condenser to said nuclear reactor via said feedwater heaters;

an extracted flow control valve and an extraction flow rate measuring meter disposed in said at least one extraction line; and

an extracted flow controller for outputting an opening request command for said extracted flow control valve based on a measured value from said extraction flow rate measuring meter and a set value of a flow rate of the extracted steam,

said nuclear power plant being operated such that second nuclear thermal power in a second operation cycle of said nuclear reactor is uprated from first nuclear thermal power in a first operation cycle before the second operation cycle, and

second feedwater temperature in the second operation cycle is made lower than first feedwater temperature in the first operation cycle.

Assignments (1)
CHANGE OF NAME Recorded Jan 5, 2026
From: HITACHI-GE NUCLEAR ENERGY, LTD.
To: HITACHI GE VERNOVA NUCLEAR ENERGY, LTD.