IP Library Granted Patent US 8,280,636
Granted Patent B2
US 8,280,636 · App. 13/051,590 · Granted Oct 2, 2012

Method and system for controlling a well service rig based on load data

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,280,636
App. No.
13/051,590
Granted
Oct 2, 2012
Kind
B2
Abstract

The present invention is directed to methods for controlling the operations of a well service rig at a well site by evaluating load sensor data obtained from sensors on or associated with the well service rig. A rig load data chart can be reviewed and an average rig load can be determined for each pull of tubing or rods from a well. The average rig load can be used to calculate and set a rig overload level. If the rig load sensor reads a rig load at or above the rig overload level, the clutch for the hoist can be disengaged and the brake applied to prevent the load from either damaging the rig or breaking off the tubing or rods in the well. In addition, the rig load can be evaluated to determine when the limit the block speed when pulling rods or tubing.

Claims (42)

1. A method for preventing the pulling of a stand of pipe away from a pipe string while the stand of pipe is being disengaged from the pipe string, comprising the steps of:

determining if a stand of pipe is being disengaged from a pipe string;

receiving load data while disengaging the stand of pipe from the pipe string;

determining if the load data is above a predetermined level while disengaging the stand of pipe from the pipe string; and

automatically disengaging a clutch for a drive system raising the stand of pipe based on a positive determination that the load is above the predetermined level.

2. The method of claim 1 , wherein determining if a stand of pipe is being disengaged from a pipe string comprises the steps of:

determining that a clutch on a drive system for a well service rig raising the stand of pipe is engaged;

determining that the drive system is moving in a direction for raising a stand of pipe; and

determining that the slip is in a closed position.

3. The method of claim 1 , wherein determining if a stand of pipe is being disengaged from a pipe string comprises the steps of:

determining that a clutch on a drive system for a well service rig raising the stand of pipe is engaged;

determining that the drive system is moving in a direction for raising a stand of pipe; and

determining that an elevator is engaging the pipe string.

4. The method of claim 1 , further comprising the step of recording the current load as an overload event at a computer on the rig based on a positive determination that the load is above a predetermined level.

5. The method of claim 1 , further comprising the step of reducing the engine throttle for the engine driving a block based on a positive determination that the average load is below a predetermined level.

6. The method of claim 1 , further comprising the step of activating an alarm based on a positive determination that the load is above a predetermined level.

7. The method of claim 1 , wherein the load is a hookload and the predetermined level of hookload is between one thousand and ten thousand pounds.

8. The method of claim 1 , wherein the load is a rig load and the predetermined level of rig load is the sum of a weight for the rig and between one thousand and ten thousand pounds.

9. A method for preventing the pulling of a stand of pipe away from a pipe string while the stand of pipe is being disengaged from the pipe string, comprising the steps of:

determining if a stand of pipe is being disengaged from a pipe string comprising the steps of:

determining that a clutch on a drive system for a well service rig raising the stand of pipe is engaged; and

determining that a slip is in a closed position;

receiving load data while disengaging the stand of pipe from the pipe string;

determining if the load data is above a predetermined level while disengaging the stand of pipe from the pipe string; and

automatically disengaging the clutch for a drive system raising the stand of pipe based on a positive determination that the load is above the predetermined level.

10. The method of claim 9 , wherein the step of determining if a stand of pipe is being disengaged from a pipe string further comprises the step of determining that the drive system is moving in a direction for raising a stand of pipe.

11. The method of claim 9 , further comprising the step of recording the current load as an overload event at a computer on the rig based on a positive determination that the load is above a predetermined level.

12. The method of claim 9 , further comprising the step of reducing an engine throttle for the engine driving a block based on a positive determination that the average load is below a predetermined level.

13. The method of claim 9 , further comprising the step of activating a visual alarm based on a positive determination that the load is above a predetermined level.

14. The method of claim 9 , further comprising the step of activating a audible alarm based on a positive determination that the load is above a predetermined level.

15. The method of claim 9 , wherein the load is a hookload and the predetermined level of hookload is between one thousand and ten thousand pounds.

16. The method of claim 9 , wherein the load is a rig load and the predetermined level of rig load is the sum of a weight for the rig and between one thousand and ten thousand pounds.

17. A method for preventing the pulling of a stand of pipe away from a pipe string while the stand of pipe is being disengaged from the pipe string, comprising the steps of:

determining if a stand of pipe is being disengaged from a pipe string comprising the steps of:

determining that a clutch on a drive system for a well service rig raising the stand of pipe is engaged; and

determining that an elevator is engaged the pipe string;

receiving load data while disengaging the stand of pipe from the pipe string;

determining if the load data is above a predetermined level while disengaging the stand of pipe from the pipe string; and

automatically disengaging the clutch for a drive system raising the stand of pipe based on a positive determination that the load is above the predetermined level.

18. The method of claim 17 , further comprising the step of recording the current load as an overload event at a computer on the rig based on a positive determination that the load is above a predetermined level.

19. The method of claim 17 , further comprising the step of activating a visual alarm based on a positive determination that the load is above a predetermined level.

20. The method of claim 17 , further comprising the step of activating a audible alarm based on a positive determination that the load is above a predetermined level.

Assignments (9)
RELEASE OF SECURITY INTEREST Recorded Dec 16, 2016
From: CORTLAND CAPITAL MARKET SERVICES LLC
To: KEY ENERGY SERVICES, LLC
Reel/Frame 040996/0899 →
SECURITY INTEREST Recorded Dec 15, 2016
From: KEY ENERGY SERVICES, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 040989/0070 →
RELEASE OF SECURITY INTEREST Recorded Dec 15, 2016
From: BANK OF AMERICA, N.A.
To: KEY ENERGY SERVICES, LLC
Reel/Frame 040995/0825 →
SECURITY INTEREST Recorded Dec 15, 2016
From: KEY ENERGY SERVICES, LLC
To: CORTLAND PRODUCTS CORP., AS AGENT
Reel/Frame 040965/0383 →
CORRECTIVE ASSIGNMENT TO CORRECT THE ASSIGNOR NAME PREVIOUSLY RECORDED AT REEL: 035814 FRAME: 0158. ASSIGNOR(S) HEREBY CONFIRMS THE SECURITY INTEREST. Recorded Aug 6, 2015
From: KEY ENERGY SERVICES, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 036284/0840 →
SECURITY INTEREST Recorded Jun 2, 2015
From: KEYSTONE ENERGY SERVICES, LLC
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 035814/0158 →
SECURITY INTEREST Recorded Jun 1, 2015
From: KEY ENERGY SERVICES, LLC
To: CORTLAND CAPITAL MARKET SERVICES LLC, AS AGENT
Reel/Frame 035801/0073 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 14, 2012
From: KEY ENERGY SERVICES, INC.
To: KEY ENERGY SERVICES, LLC
Reel/Frame 029296/0386 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 18, 2011
From: NEWMAN, FREDERIC M.
To: KEY ENERGY SERVICES, INC
Reel/Frame 025983/0590 →