Process for preparing an asphalt mixture
View Patent ↗A process for preparing an asphalt mixture from recycled asphalt pavement (RAP), virgin aggregate, filler and first and second binder materials, is disclosed. The process comprises steps of transporting RAP through a first drum; transporting virgin aggregate through a second drum; adding a first binder material to the RAP in the first drum to provide treated RAP; supplying the treated RAP, the virgin aggregate, filler and a second binder material to a mixing zone; and mixing to provide the asphalt mixture.
1. A process for preparing an asphalt mixture from recycled asphalt pavement (RAP), virgin aggregate, filler and first and second binder materials, comprising steps of
(a) transporting RAP through a first drum and thereby heating the RAP to a temperature of from 70 to 130° C.;
(b) transporting virgin aggregate through a second drum, thereby heating the virgin aggregate to a temperature of from 90 to 130° C.;
(c) adding a first binder material to the RAP in the first drum to provide treated RAP; and
(d) supplying the treated RAP from the first drum to a mixing zone, supplying the virgin aggregate from the second drum to the mixing zone, supplying filler to the mixing zone, supplying a second binder material to the mixing zone, and mixing to provide the asphalt mixture;
wherein the first binder material is a mineral oil or an oil of vegetable or animal origin, wherein the second binder material comprises a hard bitumen component having a penetration at 25° C. of less than 100 1/10mm (measured according to EN 1426 at 25° C.) and further comprises a soft bitumen component having a viscosity of less than 0.3 Pa·s at 100° C. (measured according to EN 13302 at 100° C.), and wherein the hard bitumen component is added as a bitumen emulsion or as a foamed bitumen.
2. A process according to claim 1 , wherein some or all of the RAP is derived from porous asphalt.
3. A process according to claim 1 , wherein the asphalt mixture is a porous asphalt mixture.
4. A process according to claim 1 , wherein the hard bitumen component is added as a foamed bitumen.
5. A process according to claim 1 , wherein in step (d) the treated RAP and the virgin aggregate are added to the mixing zone prior to addition of the filler and the second binder material.
6. A process for preparing an asphalt mixture from recycled asphalt pavement (RAP), virgin aggregate, filler and first and second binder materials, comprising steps of
(a) transporting RAP through a first drum and thereby heating the RAP to a temperature of from 70 to 130° C.;
(b) transporting virgin aggregate through a second drum, thereby heating the virgin aggregate to a temperature of from 90 to 130° C.;
(c) adding a first binder material to the RAP in the first drum to provide treated RAP; and
(d) supplying the treated RAP from the first drum to a mixing zone, supplying the virgin aggregate from the second drum to the mixing zone, supplying filler to the mixing zone, supplying a second binder material to the mixing zone, and mixing to provide the asphalt mixture;
wherein the first binder material is a soft bitumen component having a viscosity of less than 0.3 Pa·s at 100° C. (measured according to EN 13302 at 100° C., wherein the second binder material comprises a hard bitumen component having a penetration at 25° C. of less than 100 1/10mm (measured according to EN 1426 at 25° C.) and wherein the hard bitumen component is added as a bitumen emulsion or as a foamed bitumen.
7. A process according to claim 6 , further comprising: supplying the treated RAP from the first storage vessel to a mixing zone, supplying the virgin aggregate from the second drum to the mixing zone, supplying filler to the mixing zone, supplying a second binder material to the mixing zone, and mixing to provide the asphalt mixture.
8. A process according to claim 7 , wherein the second binder material further comprises a soft bitumen component having a viscosity of less than 0.3 Pa·s at 100° C. (measured according to EN 13302 at 100° C.).
9. A process according to claim 7 , wherein treated RAP is retained in the first storage vessel for a period of from 5 to 60 minutes.
10. A process according to claim 7 , wherein some or all of the RAP is derived from porous asphalt.
11. A process according to claim 7 , wherein the asphalt mixture is a porous asphalt mixture.
12. A process according to claim 7 , wherein the hard bitumen component is added as a foamed bitumen.
13. A process according to claim 7 , wherein the treated RAP and the virgin aggregate are added to the mixing zone prior to addition of the filler and the second binder material.
14. A process according to claim 12 , further comprising: supplying the treated RAP from the first storage vessel to a mixing zone, supplying the virgin aggregate from the second storage vessel to the mixing zone, supplying filler to the mixing zone, supplying a second binder material to the mixing zone, and mixing to provide the asphalt mixture.
15. A process according to claim 14 , wherein the second binder material further comprises a soft bitumen component having a viscosity of less than 0.3Pa·s at 100° C. (measured according to EN 13302 at 100° C.).
16. A process according to claim 14 , wherein treated RAP is retained in the first storage vessel for a period of from 5 to 60 minutes.
17. A process according to claim 14 , wherein some or all of the RAP is derived from porous asphalt.
18. A process according to claim 14 , wherein the asphalt mixture is a porous asphaltmixture.
19. A process according to claim 14 , wherein the hard bitumen component is added as a foamed bitumen.
20. A process according to claim 14 , wherein the treated RAP and the virgin aggregate are added to the mixing zone prior to addition of the filler and the second binder material.
21. A process for preparing an asphalt mixture from recycled asphalt pavement (RAP), virgin aggregate, filler and first and second binder materials, comprising steps of
(a) transporting RAP through a first drum and thereby heating the RAP to a temperature of from 70 to 130° C.;
(b) transporting virgin aggregate through a second drum, thereby heating the virgin aggregate to a temperature of from 90 to 130° C.;
(c) adding a first binder material to the RAP in the first drum to provide treated RAP;
(d) supplying the treated RAP from the first drum to a first storage vessel; and
(e) supplying the treated RAP from the first storage vessel to a mixing zone, supplying the virgin aggregate from the second drum to the mixing zone, supplying filler to the mixing zone, supplying a second binder material to the mixing zone, and mixing to provide the asphalt mixture;
wherein the first binder material is a mineral oil or an oil of vegetable or animal origin, wherein the second binder material comprises a hard bitumen component having a penetration at 25° C. of less than 100 1/10mm (measured according to EN 1426 at 25° C.) and further comprises a soft bitumen component having a viscosity of less than 0.3 Pa·s at 100° C. (measured according to EN 13302 at 100° C.), and wherein the hard bitumen component is added as a bitumen emulsion or as a foamed bitumen.
22. A process according to claim 21 , wherein treated RAP is retained in the first storage vessel for a period of from 5 to 60 minutes.
23. A process according to claim 21 , wherein some or all of the RAP is derived from porous asphalt.
24. A process according to claim 21 , wherein the asphalt mixture is a porous asphalt mixture.
25. A process according to claim 21 , wherein the hard bitumen component is added as a foamed bitumen.
26. A process according to claim 21 , wherein in the treated RAP and the virgin aggregate are added to the mixing zone prior to addition of the filler and the second binder material.
27. A process according to claim 26 , further comprising: supplying the treated RAP from the first storage vessel to a mixing zone, supplying the virgin aggregate from the second storage vessel to the mixing zone, supplying filler to the mixing zone, supplying a second binder material to the mixing zone, and mixing to provide the asphalt mixture.
28. A process according to claim 27 , wherein treated RAP is retained in the first storage vessel for a period of from 5 to 60 minutes.
29. A process according to claim 27 , wherein some or all of the RAP is derived from porous asphalt.
30. A process according to claim 27 , wherein the asphalt mixture is a porous asphalt mixture.
31. A process according to claim 27 , wherein the hard bitumen component is added as a foamed bitumen.
32. A process according to claim 27 , wherein the treated RAP and the virgin aggregate are added to the mixing zone prior to addition of the filler and the second binder material.