IP Library Granted Patent US 8,517,192
Granted Patent B2
US 8,517,192 · App. 13/062,112 · Granted Aug 27, 2013

Dual mast arrangement for a crane

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,517,192
App. No.
13/062,112
Granted
Aug 27, 2013
Kind
B2
Abstract

A bridge or gantry crane, in particular for handling ISO containers, includes a crane cart that can move along a crane support in the direction of travel of the cart. The cart supports at least one mast that can move in a vertical lift and lowering direction, and a load supporting means for containers being suspended at the mast. In order to optimize the handling rate of a bridge or gantry crane, at least one second mast is provided including a second load supporting means disposed behind and at a distance from a first mast as seen in the direction of travel (K) of the cart.

Claims (13)

1. Bridge or gantry crane for handling ISO containers, comprising:

a crane carrier that can be moved along rails in a crane travel direction (T);

a crane trolley which can be moved along said crane carrier in a trolley travel direction (K) and which supports a plurality of masts which can be moved in a vertical raising and lowering direction and on which a load receiver is suspended, wherein the crane trolley supports a first mast with a first load receiver and supports at least one second mast with a second load receiver, and the at least one second mast is disposed behind and spaced apart from the first mast in the trolley travel direction (K), wherein the first mast and the at least one second mast are spaced apart from each other in such a way that respective containers can be handled independently of each other in relation to the movement in a raising and lowering direction (H) by the first load receiver disposed on the first mast and by the second load receiver disposed on the at least one second mast.

2. The bridge or gantry crane as claimed in claim 1 including a first hoisting mechanism that is adapted to raise and lower the first mast and at least one second hoisting mechanism that is adapted to raise and lower the at least one second mast.

3. The bridge or gantry crane as claimed in claim 2 including first upper and lower guide elements that are adapted to guide the first mast on the crane trolley and second upper and lower guide elements that are adapted to guide the second mast on the crane trolley.

4. The bridge or gantry crane as claimed in claim 3 , wherein the crane carrier includes a first carrier and a second carrier, on which trolley rails are disposed wherein the crane trolley is adapted to travel in the trolley travel direction (K) on the trolley rails, and wherein the first carrier and the second carrier are spaced apart from each other in a crane travel direction (F) which is at right angles to the trolley travel direction (K).

5. The bridge or gantry crane as claimed in claim 4 , wherein the first mast and the second mast are each formed of one piece and are rigid.

6. The bridge or gantry crane as claimed in claim 2 , wherein the crane carrier includes a first carrier and a second carrier, on which trolley rails are disposed wherein the crane trolley is adapted to travel in the trolley travel direction (K) on the trolley rails, and wherein the first carrier and the second carrier are spaced apart from each other in a crane travel direction (F) which is at right angles to the trolley travel direction (K).

7. The bridge or gantry crane as claimed in claim 1 , wherein the crane carrier includes a first carrier and a second carrier, on which trolley rails are disposed wherein the crane trolley is adapted to travel in the trolley travel direction (K) on the trolley rails, and wherein the first carrier and the second carrier are spaced apart from each other in a crane travel direction (F) which is at right angles to the trolley travel direction (K).

8. The bridge or gantry crane as claimed in claim 7 including first upper and lower guide elements that are adapted to guide the first mast on the crane trolley and second upper and lower guide elements that are adapted to guide the second mast on the crane trolley.

9. The bridge or gantry crane as claimed in claim 8 , wherein the first mast and the second mast are each formed of one piece and are rigid.

10. The bridge or gantry crane as claimed in claim 1 including first upper and lower guide elements that are adapted to guide the first mast on the crane trolley and second upper and lower guide elements that are adapted to guide the second mast on the crane trolley.

11. The bridge or gantry crane as claimed in claim 1 , wherein the first mast and the second mast are each formed of one piece and are rigid.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 23, 2016
From: TEREX MHPS GMBH
To: TEREX MHPS IP MANAGEMENT GMBH
Reel/Frame 038684/0301 →
MERGER AND CHANGE OF NAME Recorded Jan 9, 2015
From: GOTTWALD PORT TECHNOLOGY GMBH; TEREX MHPS GMBH
To: TEREX MHPS GMBH
Reel/Frame 034670/0595 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 3, 2011
From: FRANZEN, HERMANN; WIESCHEMANN, ARMIN
To: GOTTWALD PORT TECHNOLOGY GMBH
Reel/Frame 025895/0886 →