Battery monitor with correction for internal OHMIC measurements of battery cells in parallel connected battery strings

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,933,702
App. No.
13/106,324
Granted
Jan 13, 2015
Kind
B2
Abstract

A battery monitor determines an internal resistance of a battery cell of a battery having parallel connected battery strings which accounts for errors introduced by the parallel connected battery strings. When determining the internal resistance of a battery cell, the battery monitor determines a baseline intercell resistance of an intercell connecting the negative terminal of the battery cell to the positive terminal of an adjacent battery. The battery monitor then applies a momentary load across the battery cell and immediately prior to releasing the load, measures the voltage across the battery cell (loaded voltage) and the voltage across the intercell. The battery monitor then calculates the current flowing through the intercell (intercell current) by dividing the measured voltage across the intercell by the determined intercell resistance. Immediately after releasing the load, the battery monitor measures the voltage across the battery cell (recovered voltage) and determines the battery cell internal resistance by dividing the difference between the recovered voltage and the loaded voltage by the intercell current.

Claims (29)

1. A system for determining resistance of a battery cell in a battery string, comprising:

a voltage sense circuit operable to measure a voltage drop across a first battery cell in a first string of battery cells and to measure a voltage drop across an intercell connection between the first battery cell and a second adjacent battery cell, where a negative terminal of the first battery cell coupled by the intercell connection to a positive terminal of the second battery cell and the first string of battery cells is coupled in parallel with a second string of battery cells;

a test load circuit that operates to apply a load across the first battery cell and the intercell connection; and

a controller in data communication with the voltage sense circuit, wherein the controller determines a baseline resistance of the intercell connection while the first string of battery cells is electrically isolated from the second string of battery cells and stores the baseline resistance of the intercell connection for subsequent processing,

wherein the controller is configured to receive a voltage drop measured across the first battery cell while the load is applied and immediately after the load is released, the controller determines a voltage difference between the voltage drop across the first battery cell while the load is applied and the voltage drop across the first battery cell promptly after releasing the load, determines a current through the intercell connection by dividing a voltage drop measured across the intercell connection by the baseline resistance of the intercell, and determines an internal resistance of the first battery cell from the voltage difference and the current through the intercell connection, where the internal resistance is determined from voltage measures taken while the first string of battery cells is coupled in parallel with a second string of battery cells.

2. The system of claim 1 wherein the test load circuit operates to measure current through the applied load when the first string of battery cells is electrically isolated from the second string of battery cells and the controller determines baseline resistance of the intercell connection from the voltage drop across the intercell connection and the current through the applied load using Ohms law.

3. The system of claim 1 wherein the voltage sense circuit has voltage sense inputs that are electrically coupled across the first battery cell and across the intercell connection.

4. The system of claim 1 wherein the controller determines a float current in the first battery cell and adjusts the current through the intercell connection prior to determining the internal resistance of the first battery cell.

5. The system of claim 1 wherein the controller determines a float current in two or more intercell connections in the battery string and validates baseline resistances for each of the intercell connections by comparing the float currents of the intercell connections to each other.

6. The system of claim 1 is incorporated into a battery monitor device.

7. A battery monitor device, comprising:

a voltage sense circuit electrically coupled across a first battery cell and to a positive terminal of a second battery cell, where a negative terminal of the first battery cell coupled by the intercell connection to a positive terminal of the second battery cell, the voltage sense circuit operates to measure a voltage drop across the first battery cell and to measure a voltage drop across the intercell connection between the first battery cell and the second battery cell, where the first battery cell is coupled in series with the second battery cell to form a first string of battery cells;

a test load circuit electrically coupled across the first battery cell and the intercell connection and operates to apply a load across the first battery cell and the intercell connection; and

a controller in data communication with the first voltage sense circuit, wherein the controller determines a baseline resistance of the intercell connection while the first string of battery cells is electrically isolated from the second string of battery cells and stores the baseline resistance of the intercell connection for subsequent processing,

wherein the controller is configured to receive a voltage drop measure across the first battery cell while a load is applied and promptly after the load is released and to determine a voltage difference between the voltage drop across the first battery cell while the load is applied and the voltage drop across the first battery cell promptly after releasing the load, the controller further determines a current through the intercell connection from a voltage drop measured across the intercell connection and the baseline resistance of the intercell and determines an internal resistance of the first battery cell from the voltage difference and the current through the intercell connection, where the internal resistance is determined from voltage measures taken while the first string of battery cells is coupled in parallel with a second string of battery cells.

8. The battery monitor of claim 7 wherein the test load circuit operates to measure current through the applied load and the controller determines resistance of the intercell connection from the voltage drop across the intercell connection and the current through the applied load using Ohms law.

9. The battery monitor of claim 7 wherein the controller determines a float current in the first battery cell and adjusts the current through the intercell connection prior to determining the internal resistance of the first battery cell.

10. A method for determining resistance of a battery cell in a battery string of a battery system, comprising:

measuring a voltage drop across a first battery cell in a first battery string while a load is applied across the first battery cell in a first string of battery cells, a negative terminal of a first battery cell coupled by an intercell connection to a positive terminal of an adjacent second battery cell and the first string of battery cells is coupled in parallel with a second string of battery cells;

measuring a voltage drop across the first battery cell promptly after releasing the load across the first battery cell;

determining a voltage difference between the voltage drop across the first battery cell while the load is applied and the voltage drop across the first battery cell promptly after releasing the load;

determining a baseline resistance of the intercell connection prior to the steps of measuring a voltage drop and while the first string of battery cells is electrically isolated from the second string of battery cells;

measuring a voltage drop across the intercell connection while the load is applied;

determining current through the intercell connection by dividing the voltage drop across the intercell connection by the baseline resistance of the intercell; and

determining an internal resistance of the first battery cell from the voltage difference and the current through the intercell connection.

11. The method of claim 10 further comprises determining the current through the intercell connection from the voltage drop across the intercell connection and the resistance of the intercell connection using Ohms law.

12. The method of claim 10 further comprises determining resistance of the intercell connection from the voltage drop across the intercell connection and the current through the intercell connection using Ohms law.

13. The method of claim 10 further comprises determining a float current in the first battery cell and adjusting the current through the intercell connection prior to determining the internal resistance of the first battery cell.

14. The method of claim 10 further comprises determining a float current in two or more intercell connections in the battery string and validating baseline resistances for each of the intercell connections by comparing the float currents of the intercell connections to each other.

Assignments (9)
SECURITY INTEREST Recorded Oct 26, 2021
From: VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.; ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.
To: UMB BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 057923/0782 →
SECURITY AGREEMENT Recorded Mar 3, 2020
From: ELECTRICAL RELIABILITY SERVICES, INC.; ENERGY LABS, INC.; VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.
To: CITIBANK, N.A.
Reel/Frame 052076/0874 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: JPMORGAN CHASE BANK, N.A.
To: VERTIV CORPORATION (F/K/A ALBER CORP.); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT CORPORATION); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT FREMONT, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT HUNTSVILLE, LLC); VERTIV IT SYSTEMS, INC. (F/K/A AVOCENT REDMOND CORP.); ELECTRICAL RELIABILITY SERVICES, INC.; VERTIV CORPORATION (F/K/A EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.); VERTIV CORPORATION (F/K/A LIEBERT CORPORATION)
Reel/Frame 052065/0666 →
RELEASE OF SECURITY INTEREST Recorded Mar 2, 2020
From: THE BANK OF NEW YORK MELLON TRUST COMPANY N.A.
To: VERTIV CORPORATION; VERTIV IT SYSTEMS, INC.; ELECTRICAL RELIABILITY SERVICES, INC.
Reel/Frame 052071/0913 →
SECOND LIEN SECURITY AGREEMENT Recorded Jun 10, 2019
From: VERTIV IT SYSTEMS, INC.; VERTIV CORPORATION; VERTIV NORTH AMERICA, INC.; ELECTRICAL RELIABILITY SERVICES, INC.; VERTIV ENERGY SYSTEMS, INC.
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A.
Reel/Frame 049415/0262 →
CHANGE OF NAME Recorded Sep 5, 2018
From: LIEBERT CORPORATION
To: VERTIV CORPORATION
Reel/Frame 047013/0116 →
SECURITY AGREEMENT Recorded Dec 2, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040797/0615 →
SECURITY AGREEMENT Recorded Dec 1, 2016
From: ALBER CORP.; ASCO POWER TECHNOLOGIES, L.P.; AVOCENT CORPORATION; AVOCENT FREMONT, LLC; AVOCENT HUNTSVILLE, LLC; AVOCENT REDMOND CORP.; ELECTRICAL RELIABILITY SERVICES, INC.; EMERSON NETWORK POWER, ENERGY SYSTEMS, NORTH AMERICA, INC.; LIEBERT CORPORATION; LIEBERT NORTH AMERICA, INC.; NORTHERN TECHNOLOGIES, INC.
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040783/0148 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 8, 2011
From: DEVEAU, EDWARD W.; BIE, XIAOQUAN
To: LIEBERT CORPORATION
Reel/Frame 026407/0028 →