IP Library Granted Patent US 9,121,882
Granted Patent B2
US 9,121,882 · App. 13/121,609 · Granted Sep 1, 2015

Wind energy plant testing device

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,121,882
App. No.
13/121,609
Granted
Sep 1, 2015
Kind
B2
Abstract

A wind energy installation test device for defined production of grid system faults, and a method thereof. The test device can include an output configured to connect to a wind energy installation, an input configured to connect to a grid system, and a switching device for connection of an electrical disturbance component relating to a grid system parameter. An autotransformer can be used for the electrical disturbance component. The grid system in a sound state can be connected to a primary winding connection and the grid system in a disturbed state with respect to the grid system parameter can be output at a secondary winding connection.

Claims (25)

1. A wind energy installation test device for defined production of grid system faults, comprising:

an output configured to connect to a wind energy installation;

an input configured to connect to a grid system; and

a switching device for connection of an electrical disturbance component relating to a grid system parameter,

wherein an autotransformer having a phase-displacement winding is used for the electrical disturbance component, the grid system in a sound state being connected to a connection of a primary winding and the grid system in a disturbed state with respect to the grid system parameter being output at a connection of a secondary winding, wherein the autotransformer uses portions of the same winding for both the primary winding and the secondary winding.

2. The wind energy installation test device of claim 1 , wherein the phase-displacement winding is additional to the primary winding and the secondary winding.

3. The wind energy installation test device of claim 2 , wherein the phase-displacement winding is configured to be switchable.

4. The wind energy installation test device-of claim 2 , wherein the phase-displacement winding is provided with a plurality of taps.

5. The wind energy installation test device of claim 2 , wherein the phase-displacement winding is configured to produce an electrical angle between the phases of 50° to 60°.

6. The wind energy installation test device of claim 2 , wherein the phase-displacement winding is configured to produce an electrical angle of 53°.

7. The wind energy installation test device of claim 1 , wherein at least one of the primary winding and the secondary winding is provided with a plurality of taps.

8. The wind energy installation test device of claim 1 , wherein the autotransformer comprises an autotransformer/phase-displacement transformer having an integrated phase-displacement winding.

9. The wind energy installation test device of claim 1 , wherein the switching device comprises double switches which are connected in series in order to produce short switching times.

10. The wind energy installation test device of claim 1 , wherein the switching device comprises electronic switches.

11. The wind energy installation test device of claim 1 , further comprising a multi-switching unit configured to switch the electrical disturbance component between an overvoltage and an undervoltage operating mode.

12. The wind energy installation test device of claim 1 , wherein the autotransformer comprises a plurality of parallel transformers which can be activated individually.

13. A method for testing a wind energy installation, comprising:

(a) connecting an autotransformer having a phase-displacement winding with the connection between a distribution grid system and a wind energy installation, the connection having a first transformation ratio;

(b) switching the autotransformer to a different transformation ratio with a higher secondary voltage for a predefined time; and

(c) switching the autotransformer back to the first transformation ratio.

14. The method of claim 13 , wherein step (b) is carried out with at least one of different transformation ratios and different transformers.

15. The method of claim 13 , wherein step (b) is carried out with different phase-displacement angles.

16. The method of claim 13 , wherein the autotransformer is connected in series with the connection between the distribution grid system and the wind energy installation.

17. The method of claim 13 , wherein the autotransformer is connected in parallel with the connection between the distribution grid system and the wind energy installation.

18. The method of claim 13 , wherein the first transformation ratio is 1:1.

Assignments (3)
CHANGE OF NAME Recorded Jan 23, 2015
From: REPOWER SYSTEMS SE
To: SENVION SE
Reel/Frame 034806/0074 →
CHANGE OF NAME Recorded Jan 21, 2015
From: REPOWER SYSTEMS AG
To: REPOWER SYSTEMS SE
Reel/Frame 034786/0585 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 19, 2011
From: LETAS, HEINZ-HERMANN
To: REPOWER SYSTEMS AG
Reel/Frame 026612/0037 →