IP Library Granted Patent US 8,376,055
Granted Patent B2
US 8,376,055 · App. 13/136,035 · Granted Feb 19, 2013

Shearing tool and methods of use

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,376,055
App. No.
13/136,035
Granted
Feb 19, 2013
Kind
B2
Abstract

A shearing tool for shearing, trimming, or reducing objects being pulled through a drill string and methods for retrieving retrievable tools with fins from the drill string, where the retrievable tools must pass through restrictions in the drill string having interior diameters less than the outer diameters of the fins. The fins, affixed to the retrievable tools, provide stability to the tools, while within the drill string, and can be made of rubber, plastic, other shearable materials, or combinations thereof. The apparatuses and methods include inserting a shearing tool with a flange into a box end of a section of drill string, where the flange keeps the shearing tool in place. The shearing tool further comprising a cutting surface for cutting materials pulled through the shearing tool.

Claims (22)

1. A system for reducing the outer diameter of objects disposed in a tubular string, the system comprising:

a restriction in the tubular string having a first diameter;

a downhole tool having a second diameter greater than the first diameter;

a shearing tool comprising a body having a first end, a second end, and a channel, wherein the first end engages a joint of the tubular string, wherein the second end protrudes into a flow path of the tubular string for shearing materials pulled through the channel, and wherein pulling the downhole tool through the channel provides the downhole tool with a third diameter less than the second diameter.

2. The system of claim 1 , wherein the downhole tool comprises a compressible portion, wherein compression of the compressible portion reduces the third diameter to a fourth diameter less than or equal to the first diameter for enabling the downhole tool to pass through the restriction.

3. The system of claim 1 , wherein the third diameter is less than or equal to the first diameter such that the downhole tool can pass through the restriction.

4. The system of claim 1 , wherein the downhole tool comprises a protruding portion that provides the downhole tool with the second diameter, wherein the protruding portion contacts an interior surface of the tubular string for positioning the downhole tool relative to the tubular string.

5. The system of claim 4 , wherein the protruding portion comprises at least one fin for centralizing the downhole tool in the flow path of the tubular string, wherein said at least one fin comprises a sharable material, and wherein pulling the downhole tool through the channel shears said at least one fin to provide the downhole tool with the third diameter.

6. The system of claim 1 , wherein the second end comprises at least one blade disposed thereon for shearing a portion of the downhole tool to provide the downhole tool with the third diameter.

7. The system of claim 1 , wherein the shearing tool further comprises a protruding portion secured within the joint to retain the shearing tool at a selected position within the tubular string.

8. The system of claim 7 , wherein the joint comprises a box portion, and wherein the shearing tool is secured within the box portion.

9. A method for retrieving a downhole tool from a tubular string, the method comprising the steps of:

providing a downhole tool into a tubular string having a restriction therein;

providing a shearing tool into the tubular string at a position between the downhole tool and the restriction; and

moving the downhole tool into contact with the shearing tool, wherein contact between the shearing tool and the downhole tool provides the downhole tool with a reduced diameter.

10. The method of claim 9 , further comprising the step of moving the downhole tool through the restriction.

11. The method of claim 10 , wherein the step of moving the downhole tool through the restriction comprises compressing a compressible portion of the downhole tool to further reduce the diameter of the downhole tool for enabling the downhole tool to pass through the restriction.

12. The method of claim 9 , wherein the step of moving the downhole tool into contact with the shearing tool provides the downhole tool with a diameter less than or equal to a diameter of the restriction.

13. The method of claim 9 , wherein the step of providing the downhole tool into a tubular string comprises contacting an interior surface of the tubular string with a protruding portion of the downhole tool for positioning the downhole tool relative to the tubular string.

14. The method of claim 13 , wherein the protruding portion comprises at least one fin for centralizing the downhole tool, wherein said at least one fin comprises a sharable material, and wherein the step of moving the downhole tool into contact with the shearing tool shears said at least one fin to provide the downhole tool with the reduced diameter.

15. The method of claim 9 , wherein the step of moving the downhole tool into contact with the shearing tool comprises shearing a portion of the downhole tool using at least one blade disposed on the shearing tool.

16. The method of claim 9 , wherein the step of providing the shearing tool into the tubular string comprises engaging a protruding portion of the shearing tool within a joint of the tubular string to retain the shearing tool at a selected position within the tubular string.

Assignments (3)
NUNC PRO TUNC ASSIGNMENT Recorded Sep 24, 2019
From: HUNTING ENERGY SERVICES I, INC.
To: HUNTING ENERGY SERVICES, LLC
Reel/Frame 050472/0840 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 7, 2016
From: HUNTING SPECIALTY SUPPLY, L.P.
To: HUNTING ENERGY SERVICES, INC.
Reel/Frame 038215/0703 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 21, 2011
From: CHAMBERS, III, JAMES EDWARD; BYRD, GERALD ROBERT
To: SPECIALTY SUPPLY COMPANIES
Reel/Frame 026678/0294 →