IP Library Granted Patent US 8,981,583
Granted Patent B2
US 8,981,583 · App. 13/139,734 · Granted Mar 17, 2015

Method for stabilization of the network frequency of an electrical power network

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,981,583
App. No.
13/139,734
Granted
Mar 17, 2015
Kind
B2
Abstract

A method for stabilizing the network frequency of an electrical power network is provided. The network includes at least a two-shaft gas turbine which includes power turbine and a gas generator, wherein the power turbine is connected to a first generator by means of a shaft in a torque transferring manner. Also, an assembly for carrying out the method is provided. The first shaft of the power turbine and the first generator turn permanently synchronized with the power network and the first generator drives the rotation as a motor and a second shaft of the gas generator permanently turns at an ignition speed, wherein the gas generator is ignited upon a power demand and the power turbine is driven by the created hot gas of the gas generator, such that the first generator creates power.

Claims (55)

1. A method for stabilization of a grid system frequency of an electrical grid system, comprising:

providing a gas turbine comprising a power turbine on a first side of the gas turbine and a gas generator on a second side of the gas turbine;

connecting the power turbine of the gas turbine by way of a first shaft disposed on the first side of the gas turbine to a first generator in a torque-transmitting manner, wherein the first shaft rotates permanently synchronized to the grid system frequency;

connecting the gas generator of the gas turbine by way of a second shaft disposed on the second side of the gas turbine to a starter motor that transmits torque to the gas generator, wherein the second shaft rotates permanently at an initiation rotation speed imparted by the starter motor;

initiating the gas generator in response to the initiation rotation speed to produce hot gas when there is a sudden power demand that, if not met, would destabilize the grid system frequency in the electrical grid system; and

driving the power turbine by the hot gas produced by the gas generator, such that the first generator generates an amount of electricity effective to meet the sudden power demand and thus maintain stability of the grid system frequency in the electrical grid system.

2. The method as claimed in claim 1 ,

wherein the gas turbine and the first generator are associated with a steam power station,

wherein the steam power station includes a central control system which controls the gas turbine and the steam power station, and

wherein the control system causes an initiation of the gas generator when there is a power demand on the steam power station which exceeds a specific limit.

3. The method as claimed in claim 1 , wherein the gas generator includes a compressor, one combustion chamber and one starter motor, which are connected to one another by means of the second shaft in a torque-transmitting manner.

4. The method as claimed in claim 2 ,

wherein the steam power station comprises a steam turbine, a first boiler, a condenser and a second generator, and

wherein an exhaust gas flow from the gas turbine is passed into a waste-heat boiler, in which a circulating medium in the steam power station is preheated by means of the exhaust-gas flow before entering the first boiler.

5. The method as claimed in claim 2 ,

wherein a power output from the first generator is used to partially or completely cover an own demand of the steam power station.

6. The method as claimed in claim 4 , wherein a gas switch is arranged between the gas turbine and the waste-heat boiler and passes the exhaust-gas flow either through the waste-heat boiler or to a bypass which opens into the environment.

7. The method as claimed in claim 4 ,

wherein the circulating medium is heated in a preheater downstream from the condenser during operation without support from the gas turbine,

wherein the preheater is heated by means of bleeds from the steam turbine, and

wherein a bleed amount is passed from the steam turbine to the preheater by means of a plurality of bleed lines.

8. The method as claimed in claim 4 , wherein the circulating medium is heated in a plurality of waste-heat boiler preheaters which are heated by the exhaust-gas flow, downstream from the condenser during operation with support from the gas turbine.

9. The method as claimed in claim 7 ,

wherein a first plurality of control valves are arranged in the plurality of bleed lines,

wherein a second plurality of control valves are arranged in a plurality of waste-heat boiler preheater lines,

wherein the bleed amount is reduced by means of a third control valve and the plurality of control valves when the support from the gas turbine increases, and the waste-heat boiler preheater amount is increased by means of the second plurality of control valves.

10. The method as claimed in claim 4 ,

wherein the waste-heat boiler is kept at a minimum temperature during operation without support from the gas turbine.

11. An arrangement for stabilization of a grid system frequency of an electrical grid system, comprising:

a gas turbine comprising a power turbine on a first side of the gas turbine and a gas generator on a second side of the gas turbine,

wherein a first shaft disposed on the first side of the gas turbine is arranged to connect in a torque-transmitting manner the power turbine to the first generator, wherein the first shaft rotates permanently synchronized to the grid system frequency,

wherein a second shaft disposed on the second side of the gas turbine is arranged to interconnect to one another the gas generator and a starter motor, wherein the second shaft rotates permanently at an initiation rotation speed imparted by the starter motor, and

wherein, when there is a sudden power demand, that, if not met, would destabilize the grid system frequency in the electrical grid system, the gas generator is initiated in response to the initiation rotation speed to produce hot gas, and the power turbine is driven by the hot gas produced by the gas generator, such that the first generator generates an amount of electricity effective to meet the sudden power demand and thus maintain stability of the grid system frequency in the electrical grid system.

12. The arrangement as claimed in claim 11 ,

wherein the gas turbine and the first generator are associated with a steam power station,

wherein the steam power station includes a central control system which controls the gas turbine and the steam power station, and

wherein the control system causes an initiation of the gas generator when there is a power demand on the steam power station which exceeds a specific limit.

13. The arrangement as claimed in claim 11 , wherein the gas generator includes a compressor, one combustion chamber and one starter motor, which are connected to one another by means of the second shaft in a torque-transmitting manner.

14. The arrangement as claimed in claim 12 ,

wherein the steam power station comprises a steam turbine, a first boiler, a condenser and a second generator, and

wherein an exhaust gas flow from the gas turbine is passed into a waste-heat boiler, in which a circulating medium in the steam power station is preheated by means of the exhaust-gas flow before entering the first boiler.

15. The arrangement as claimed in claim 12 ,

wherein a power output from the first generator is used to partially or completely cover an own demand of the steam power station.

16. The arrangement as claimed in claim 14 , wherein a gas switch is arranged between the gas turbine and the waste-heat boiler and passes the exhaust-gas flow either through the waste-heat boiler or to a bypass which opens into the environment.

17. The arrangement as claimed in claim 14 ,

wherein the circulating medium is heated in a preheater downstream from the condenser during operation without support from the gas turbine,

wherein the preheater is heated by means of bleeds from the steam turbine, and

wherein a bleed amount is passed from the steam turbine to the preheater by means of a plurality of bleed lines.

18. The arrangement as claimed in claim 14 , wherein the circulating medium is heated in a plurality of waste-heat boiler preheaters which are heated by the exhaust-gas flow, downstream from the condenser during operation with support from the gas turbine.

19. The arrangement as claimed in claim 17 ,

wherein a first plurality of control valves are arranged in the plurality of bleed lines,

wherein a second plurality of control valves are arranged in a plurality of waste-heat boiler preheater lines,

wherein the bleed amount is reduced by means of a third control valve and the plurality of control valves when the support from the gas turbine increases, and the waste-heat boiler preheater amount is increased by means of the second plurality of control valves.

20. The arrangement as claimed in claim 14 ,

wherein the waste-heat boiler is kept at a minimum temperature during operation without support from the gas turbine.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 15, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 055950/0027 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 2, 2011
From: JURETZEK, UWE
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 026850/0531 →