IP Library Granted Patent US 8,806,860
Granted Patent B2
US 8,806,860 · App. 13/143,756 · Granted Aug 19, 2014

Hybrid construction machine

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,806,860
App. No.
13/143,756
Granted
Aug 19, 2014
Kind
B2
Abstract

A hybrid construction machine includes a control valve provided in a flow passage that connects an actuator to a regenerative hydraulic motor, an opening of which is controlled by a pilot pressure led to a pilot chamber thereof; and a solenoid pilot control valve that leads a pressure on an upstream side of the control valve to the pilot chamber. In the control valve, a pressure receiving area of a main spool for receiving the pilot pressure is equal to an area obtained by subtracting a pressure receiving area of the main spool for receiving a pressure of an outflow port in a direction for moving the main spool against a biasing force of a biasing member from a pressure receiving area of the main spool for receiving a pressure of the outflow port in a direction for moving the main spool against the pilot pressure.

Claims (12)

1. A hybrid construction machine that performs regeneration using a working oil discharged from an actuator, comprising:

a regenerative hydraulic motor rotated by the working oil discharged from the actuator;

a power generator connected to the hydraulic motor;

a control valve provided in a flow passage that connects the actuator to the hydraulic motor, an opening of which is controlled by a pilot pressure led to a pilot chamber thereof; and

a solenoid pilot control valve that leads a pressure on an upstream side of the control valve to the pilot chamber of the control valve as the pilot pressure,

wherein the control valve comprises:

a main spool that is incorporated to be free to slide into a valve main body such that one end thereof faces the pilot chamber and switches an inflow port and an outflow port between a blocked state and a communicating state; and

a biasing member that is housed in a spring chamber faced by the other end of the main spool and biases the main spool against the pilot pressure of the pilot chamber, and

a pressure receiving area of the main spool for receiving the pilot pressure of the pilot chamber is equal to an area obtained by subtracting a pressure receiving area of the main spool for receiving a pressure of the outflow port in a direction for moving the main spool against the biasing force of the biasing member from a pressure receiving area of the main spool for receiving a pressure of the outflow port in a direction for moving the main spool against the pilot pressure of the pilot chamber.

2. The hybrid construction machine as defined in claim 1 , wherein the main spool is divided into a spool main body that faces the spring chamber and a piston portion that is incorporated to be free to slide into the spool main body so as to face the pilot chamber, and

a pressure receiving area of the piston portion for receiving the pilot pressure of the pilot chamber is smaller than a minimum diameter portion of the spool main body.

3. The hybrid construction machine as defined in claim 1 , wherein the solenoid pilot control valve is incorporated into the valve main body.

Assignments (2)
CHANGE OF NAME Recorded Dec 21, 2015
From: KAYABA INDUSTRY CO., LTD.
To: KYB CORPORATION
Reel/Frame 037355/0086 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 8, 2011
From: KAWASAKI, HARUHIKO; EGAWA, MASAHIRO
To: KAYABA INDUSTRY CO., LTD.
Reel/Frame 026561/0519 →