IP Library Granted Patent US 9,038,267
Granted Patent B2
US 9,038,267 · App. 13/158,090 · Granted May 26, 2015

Method of separating heat exchanger tubes and an apparatus for same

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,038,267
App. No.
13/158,090
Granted
May 26, 2015
Kind
B2
Abstract

A method and apparatus of producing tubes for use in a heat exchanger, in which a tube is moved along a production line in a direction, predetermined breaking points are created in the tube, and in which the tube is severed at the predetermined breaking points to form individual tubes with a tearing-off device having a first clamp and a second clamp. The first clamp can be reciprocated along the direction, and the tube can be moved substantially continuously along the production line in the direction through the tearing-off device. Also, the second clamp can be reciprocated along the direction substantially simultaneously with the first clamp.

Claims (74)

1. A method of producing individual tubes for use in a heat exchanger from at least one continuous strip of material, the method comprising:

providing predetermined breaking points in the at least one continuous strip of material;

forming at least a portion of a continuous tube from the continuous strip of material;

moving the continuous tube along a production line in a direction; and

severing the continuous tube at one of the predetermined breaking points to form one of the individual tubes with a tearing-off device having a first clamp and a second clamp, wherein severing the continuous tube includes;

reciprocating the first clamp along the direction;

moving the continuous tube substantially continuously along the production line in the direction through the tearing-off device;

reciprocating the second clamp along the direction substantially simultaneously with the first clamp;

moving a toggle lever that couples the first clamp to the second clamp along a slope;

moving the first clamp with respect to the second clamp;

moving the toggle lever along the slope; and

severing the continuous tube by moving the first clamp with respect to the second clamp, including moving the first clamp a first distance in the direction and moving the second clamp a second distance in the direction that is less than the first distance.

2. The method of claim 1 , wherein the first clamp travels the first distance and the second clamp travels the second distance in substantially the same amount of time.

3. The method of claim 1 , further comprising,

clamping the continuous tube by applying a first compressive force to the first clamp and a second compressive force to the second clamp; and

releasing the continuous tube and at least one of individual tubes by opening the first and second clamps.

4. The method of claim 3 , wherein the first compressive force is applied to the first clamp and the second compressive force is applied to the second clamp by at least one pneumatic actuator.

5. The method of claim 3 , wherein the first compressive force is applied to the first clamp and the second compressive force is applied to the second clamp by at least one hydraulic actuator.

6. The method of claim 3 , wherein the first compressive force is applied to the first clamp and the second compressive force is applied to the second clamp by at least one electrical actuator.

7. The method of claim 1 , wherein forming at least a portion of the continuous tube from the continuous strip of material includes providing a first continuous metallic strip to the production line; and shaping the first continuous metallic strip to form the continuous tube.

8. The method of claim 1 , wherein forming at least a portion of the continuous tube from the continuous strip of material includes

providing a first continuous metallic strip to the production line;

providing a second continuous metallic strip to the production line; and

combining the first continuous metallic strip and the second continuous metallic strip to at least partially form the continuous tube.

9. The method of claim 1 , wherein forming at least a portion of the continuous tube from the continuous strip of material includes

providing a first continuous metallic strip to the production line;

providing a second continuous metallic strip to the production line;

providing a third continuous metallic strip to the production line; and

combining the first continuous metallic strip, the second continuous metallic strip, and the third continuous metallic strip to form the continuous tube.

10. The method of claim 1 , further comprising,

clamping the continuous tube by applying a first compressive force to both the first clamp and the second clamp; and

releasing the continuous tube and at least one of individual tubes by opening the first and second clamps.

11. The method of claim 1 , further comprising,

severing one of the individual tubes from the continuous tube at the predetermined breaking point when the predetermined breaking point is located between the first clamp and the second clamp.

12. The method of claim 1 , further comprising,

moving at least a portion of toggle lever eccentrically between the first clamp and the second clamp to increase the distance between the first clamp and the second clamp.

13. The method of claim 12 , further comprising,

engaging the at least a portion of the toggle level upon the slope at a point between the first clamp and the second clamp.

14. The method of claim 1 , further comprising,

rotating the toggle lever about an axis.

15. The method of claim 1 , further comprising,

engaging a first toggle lever cam surface upon the slope to increase the distance between the first clamp and the second clamp.

16. The method of claim 1 , further comprising,

engaging at least a portion of the toggle lever operationally with the second clamp to increase the distance between the first clamp and the second clamp.

17. The method of claim 1 , further comprising,

engaging a second toggle lever cam surface operationally with the second clamp to increase the distance between the first clamp and the second clamp.

18. A method of producing individual tubes for use in a heat exchanger from at least one continuous strip of material, the method comprising:

providing predetermined breaking points in the at least one continuous strip of material;

forming at least a portion of a continuous tube from the continuous strip of material;

moving the continuous tube along a production line in a direction; and

severing the continuous tube at one of the predetermined breaking points to form one of the individual tubes with a tearing-off device having a first clamp and a second clamp, wherein severing the continuous tube includes;

reciprocating the first clamp along the direction;

moving the continuous tube substantially continuously along the production line in the direction through the tearing-off device;

reciprocating the second clamp along the direction substantially simultaneously with the first clamp;

rotating an eccentric;

reciprocating a first strut that couples the first clamp and the eccentric;

reciprocating a second strut that couples the second clamp and the eccentric to move the first clamp a first distance and to move the second clamp a second distance;

opening the first clamp using a first cam coupled to the first strut adjacent the first clamp;

closing the first clamp using the first cam to apply a compressive force to the endless continuous tube via the first clamp;

opening the second clamp using a second cam coupled to the second strut adjacent the second clamp; and

closing the second clamp using the second cam to apply a compressive force to the endless continuous tube via the second clamp.

19. A method of producing individual tubes for use in a heat exchanger from at least one continuous strip of material, the method comprising:

providing predetermined breaking points in the at least one continuous strip of material;

forming at least a portion of a continuous tube from the continuous strip of material;

moving the continuous tube along a production line in a direction; and

severing the continuous tube at one of the predetermined breaking points to form one of the individual tubes with a tearing-off device having a first clamp and a second clamp, wherein severing the continuous tube includes;

rotating an eccentric to substantially simultaneously reciprocate the first clamp and the second clamp along the direction by reciprocating a first strut that couples the first clamp and the eccentric and a second strut that couples the second clamp and the eccentric;

moving the continuous tube substantially continuously along the production line in the direction through the tearing-off device;

closing the first clamp to apply a compressive force to the continuous tube via the first clamp using a first cam coupled to the first strut adjacent the first clamp;

closing the second clamp to apply a compressive force to the continuous tube via the second clamp using a second cam coupled to the second strut adjacent to the second clamp;

moving the first strut such that the first clamp moves in the direction a first distance;

moving a second strut such that the second clamp moves in the direction a second distance;

opening the first clamp using the first cam; and

opening the second clamp using the second cam.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 9, 2022
From: MODINE AUSTRIA HOLDING GMBH
To: INNERIO HEAT EXCHANGER GMBH
Reel/Frame 062038/0068 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 5, 2019
From: MODINE MANUFACTURING COMPANY
To: MODINE AUSTRIA HOLDING GMBH
Reel/Frame 048801/0461 →
SECURITY INTEREST Recorded Nov 15, 2016
From: MODINE MANUFACTURING COMPANY
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 040619/0799 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 22, 2011
From: SCHMID, MANFRED; LENKNER, MANFRED
To: MODINE MANUFACTURING COMPANY
Reel/Frame 026783/0917 →