IP Library Granted Patent US 9,310,401
Granted Patent B2
US 9,310,401 · App. 13/169,056 · Granted Apr 12, 2016

Power monitoring device for identifying state of electric appliance and power monitoring method thereof

Inventors: Shiao-Li Tsao (Taipei, TW); Yi-Sheng Lai (Taichung, TW); Ming-Chun Lin (Keelung, TW); Yung-Chi Chen (Taichung, TW)
Assignee: National Chiao Tung University
G01R19/2513
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,310,401
App. No.
13/169,056
Granted
Apr 12, 2016
Kind
B2
Abstract

A power monitoring device for identifying the state of an electric appliance based on user feedbacks and a power monitoring method thereof are provided. The power monitoring device includes a measurement module, a variation detection and search module, and an electric appliance signature database established based on user feedbacks. When the measurement module detects a variation of a power consumption feature, the variation detection and search module searches the electric appliance signature database according to the variation to obtain electric appliances similar to the variation and the states thereof. A user contributes data to the electric appliance signature database by confirming the search result, or selecting the correct electric appliance and the state thereof. When the user confirms the search result, the power monitoring device establishes an association between the electric appliance and its electric appliance signatures and updates the electric appliance signature database.

Claims (33)

1. A power monitoring system for identifying a state of an electric appliance, comprising:

a first power monitoring device, for measuring a power consumption feature of a first power supply, so as to detect and calculate a first variation of the power consumption feature of the first power supply, wherein the first power supply supplies electric power to a first electric appliance group and a second electric appliance group; and

at least one second power monitoring device, for measuring a power consumption feature of a corresponding second power supply, so as to detect and calculate a second variation of the power consumption feature of the second power supply, wherein the second power supply is a branch of the first power supply and supplies electric power to the second electric appliance group,

wherein the first power monitoring device and the second power monitoring device perform a level construction step to obtain a relative position between the first power monitoring device and the second power monitoring device and synchronously calibrate the first variation and the second variation to calculate a first electric appliance variation, when the first electric appliance variation is detected, the first power monitoring device searches an electric appliance signature database according to the first electric appliance variation to obtain and monitor states of a plurality of first electric appliances corresponding to the first electric appliance variation or a combination of the states of the first electric appliances, wherein the first electric appliance group comprise the first electric appliances.

2. The power monitoring system according to claim 1 , wherein the first power monitoring device and the second power monitoring device perform the level construction step by using a power line communication network to obtain the relative position, so as to obtain an electricity meter topology network.

3. The power monitoring system according to claim 1 , wherein the second power monitoring device generates a meter consumption load at the second power supply, and the first power monitoring device receives the meter consumption load at the first power supply to obtain a position of the second power monitoring device, so that the first power monitoring device and the second power monitoring device perform the level construction step and generate an electricity meter topology network.

4. The power monitoring system according to claim 1 , wherein the first power monitoring device and the second power monitoring device compare a synchronization test signal in the first power supply and the second power supply to generate a time interval, so as to synchronize the first power monitoring device and the second power monitoring device or synchronously calibrate the first variation and the second variation.

5. The power monitoring system according to claim 4 , wherein the synchronization test signal is a voltage sine wave.

6. The power monitoring system according to claim 1 , wherein the first variation is a first current wave of the first power supply, the second variation is a second current wave of the second power supply, and the first electric appliance variation is a net current wave generated by shifting the first current wave and then subtracting the second current wave.

7. The power monitoring system according to claim 1 further comprising:

at least one third power monitoring device, for measuring a power consumption feature of a corresponding third power supply, so as to detect and calculate a third variation of the power consumption feature of the third power supply, wherein the third power supply is a branch of the second power supply and supplies electric power to a third electric appliance group,

wherein the second power monitoring device receives the third variation and synchronously calibrates the second variation and the third variation to calculate a second electric appliance variation, when the second electric appliance variation is detected, the second power monitoring device searches the electric appliance signature database according to the second electric appliance variation to obtain and monitor states of a plurality of second electric appliances corresponding to the second electric appliance variation or a combination of the states of the second electric appliances, wherein the second electric appliance group comprises the second electric appliances.

8. A power monitoring method for identifying a state of an electric appliance, comprising:

configuring a first power monitoring device for measuring a power consumption feature of a first power supply, so as to detect and calculate a first variation of the power consumption feature of the first power supply, wherein the first power supply supplies electric power to a first electric appliance group and a second electric appliance group;

configuring at least one second power monitoring device for measuring a power consumption feature of a corresponding second power supply, so as to detect and calculate a second variation of the power consumption feature of the second power supply, wherein the second power supply is a branch of the first power supply and supplies electric power to the second electric appliance group;

performing a level construction step by using the first power monitoring device and the second power monitoring device to obtain a relative position between the first power monitoring device and the second power monitoring device;

synchronously calibrating the first variation and the second variation to calculate a first electric appliance variation;

when the first electric appliance variation is detected, searching an electric appliance signature database according to the first electric appliance variation to obtain and monitor states of a plurality of first electric appliances corresponding to the first electric appliance variation or a combination of the states of the first electric appliances, wherein the first electric appliance group comprises the first electric appliances.

9. The power monitoring method according to claim 8 , wherein the level construction step comprises:

communicating with each other by using a wired network, a wireless network, or a PLC network to obtain positions of a plurality of neighboring power monitoring devices, so as to obtain an electricity meter topology network.

10. The power monitoring method according to claim 8 , wherein the level construction step comprises:

generating a meter consumption load at the second power supply by using the second power monitoring device, and receiving the meter consumption load at the first power supply by using the first power monitoring device to obtain a position of the second power monitoring device, so as to generate an electricity meter topology network.

11. The power monitoring method according to claim 8 , wherein the step of synchronously calibrating the first variation and the second variation to calculate the first electric appliance variation comprises:

comparing a synchronization test signal in the first power supply and the second power supply by using the first power monitoring device and the second power monitoring device to generate a time interval, so as to synchronize the first power monitoring device and the second power monitoring device;

shifting a current wave of the first variation or the second variation to calibrate time of the first variation and time of the second variation; and

calculating a difference between the shifted first variation and the second variation to generate the first electric appliance variation.

12. The power monitoring method according to claim 11 , wherein the first variation is a first current wave of the first power supply, the second variation is a second current wave of the second power supply, and the first electric appliance variation is a net current wave generated by shifting the first current wave and then subtracting the second current wave.

13. The power monitoring method according to claim 8 , wherein the step of detecting the first electric appliance variation comprises:

when the first electric appliance variation is greater than a threshold, searching an electric appliance signature database according to the first electric appliance variation to obtain and monitor the states of the first electric appliances corresponding to the first electric appliance variation.

14. The power monitoring method according to claim 8 , wherein the first power supply and the second power supply further supply electric power to a third electric appliance group, and the power monitoring method further comprises:

configuring a third power monitoring device for measuring a power consumption feature of a corresponding third power supply, so as to detect and calculate a third variation of the power consumption feature of the third power supply, wherein the third power supply is a branch of the second power supply and supplies electric power to the third electric appliance group;

after the second power monitoring device and the third power monitoring device obtains a relative position between the second power monitoring device and the third power monitoring device, synchronously calibrating the second variation and the third variation to calculate a second electric appliance variation; and

when the second electric appliance variation is detected, searching the electric appliance signature database according to the second electric appliance variation to obtain and monitor states of a plurality of second electric appliances corresponding to the second electric appliance variation or a combination of the states of the second electric appliances, wherein the second electric appliance group comprises the second electric appliances.

Assignments (5)
CHANGE OF NAME Recorded Jul 29, 2025
From: WISTRON NEWEB CORPORATION
To: WNC CORPORATION
Reel/Frame 072255/0226 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 21, 2023
From: WISEN.AI CO., LTD.
To: WISTRON NEWEB CORPORATION
Reel/Frame 063396/0785 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 9, 2023
From: NATIONAL YANG MING CHIAO TUNG UNIVERSITY
To: WISEN.AI CO., LTD.
Reel/Frame 062928/0646 →
MERGER AND CHANGE OF NAME Recorded Jan 20, 2023
From: NATIONAL CHIAO TUNG UNIVERSITY; NATIONAL YANG MING CHIAO TUNG UNIVERSITY
To: NATIONAL YANG MING CHIAO TUNG UNIVERSITY
Reel/Frame 062447/0372 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 28, 2011
From: TSAO, SHIAO-LI; LAI, YI-SHENG; LIN, MING-CHUN; CHEN, YUNG-CHI
To: NATIONAL CHIAO TUNG UNIVERSITY
Reel/Frame 026518/0092 →
Priority Claims (1)
TW 99121853 A · Jul 2, 2010 · national
Continuity (1)
Related Publication 20120004871A1 · Jan 5, 2012