IP Library Granted Patent US 9,520,221
Granted Patent B2
US 9,520,221 · App. 13/174,069 · Granted Dec 13, 2016

Method for function monitoring and/or control of a cooling system, and a corresponding cooling system

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,520,221
App. No.
13/174,069
Granted
Dec 13, 2016
Kind
B2
Abstract

Exemplary embodiments relate to a system and method for monitoring functional operational reliability of a cooling system having at least one thermosyphon for transformers provided with at least one evaporator and with at least one condenser. The cooling system using a coolant which can be vaporized and a gaseous medium, as a heat carrier.

Claims (62)

1. A method for monitoring the function and the operational reliability of a cooling system having at least one thermosyphon, for transformers, the cooling system including at least one evaporator and at least one condenser, and using a coolant which can be vaporized in the at least one condenser and a gaseous medium, as a heat carrier in the at least one evaporator, the method comprising:

determining a heat exchanger effectiveness of the cooling system wherein a global effectiveness ε of the at least one thermosyphon is determined using the relationship

ɛ

=

(

T

env

-

T

condens

out

)

(

T

env

-

T

evap

in

)

or

ɛ

=

(

T

evap

in

-

T

evap

out

)

(

T

evap

in

-

T

env

)

which is a ratio of a difference between temperatures at a condenser inlet (T env ) and at a condenser outlet (T condens out ) to a difference between a temperatures at the condenser inlet (T env ) and at an evaporator inlet (T evap in ),

comparing the evaporator inlet temperature with plural temperature threshold values;

comparing the global effectiveness ε of the at least one thermosyphon with plural effectiveness threshold values; and

generating a warning signal when comparison results based on the plural temperature threshold values and comparison results based on the plural effectiveness threshold values are outside predetermined limits,

wherein temperature measurements are carried out one of sequentially to reduce a number of measurement channels used to record temperature characteristic values or at a same time.

2. The method according to claim 1 , wherein in the event of a disturbance, the flow of the gaseous heat carrier is interrupted at times to rectify the disturbance.

3. The method according to claim 1 , wherein in the event of a disturbance, the flow direction of the gaseous heat carrier is reversed at times to rectify the disturbance.

4. The method according to claim 1 , wherein the condenser and the evaporator are heated.

5. The method according to claim 1 , comprising:

comparing the global effectiveness of the at least one thermosyphon with a lower effectiveness threshold and an upper effectiveness threshold.

6. The method according to claim 5 , comprising:

comparing the evaporator inlet temperature with a first temperature threshold.

7. The method according to claim 6 , comprising:

determining that the cooling system is serviceable, if the global effectiveness of the at least one thermosyphon is within a range of the lower and upper effectiveness thresholds and the evaporator inlet temperature is within the first temperature threshold.

8. The method according to claim 7 , wherein when the global effectiveness is outside a range of the lower and upper effectiveness thresholds and the evaporator inlet temperature is outside the first temperature threshold, the method comprising:

comparing the evaporator inlet temperature with a second temperature threshold; and

generating a warning signal if the global effectiveness of the at least one thermosyphon is outside the range of the lower and upper effectiveness thresholds and the evaporator inlet temperature is outside the second temperature threshold.

9. The method according to claim 8 , comprising:

at least one of inspecting and repairing the cooling system if the evaporating inlet temperature is above the second temperature threshold.

10. The method according to claim 8 , comprising:

inspecting the cooling system if the global effectiveness of the at least one thermosyphon is above the upper effectiveness threshold; and

repairing the cooling system if the global effectiveness of the at least one thermosyphon is below the lower effectiveness threshold.

Assignments (2)
MERGER Recorded Nov 15, 2016
From: ABB TECHNOLOGY LTD.
To: ABB SCHWEIZ AG
Reel/Frame 040621/0822 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 31, 2011
From: WEBER, BENJAMIN; PATEL, BHAVESH; TEPPER, JENS; AGOSTINI, BRUNO; BOCKHOLT, MARCOS; LUCKEY, MICHAEL
To: ABB TECHNOLOGY AG
Reel/Frame 026838/0895 →