IP Library Granted Patent US 8,849,594
Granted Patent B2
US 8,849,594 · App. 13/187,330 · Granted Sep 30, 2014

Methods for measuring leakage rate and inferring production rate of an oilfield downhole pump

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 8,849,594
App. No.
13/187,330
Granted
Sep 30, 2014
Kind
B2
Abstract

Methods for measuring the leakage rate of a downhole pump using either measured axial load information from the drive rod string or using measured production data. The invention is for methods of applying the leakage rate to a downhole dynamometer card, for a reciprocating rod pump, for determining well production.

Claims (94)

1. A method of determining traveling valve/plunger leakage rate LKG in a subsurface pump reciprocated by a rod string comprising the steps of:

stopping the rod string at the surface during an upstroke,

determining the surface axial load on the rod string for a plurality of times until axial load has stabilized,

determining dF/dt from polished rod load vs time data,

selecting a subset of the dF/dt vs axial load data for analysis,

applying linear regression using dF/dt as the dependent variable and axial load as the independent variable to derive a best fit line to the selected data,

calculating total stress/strain ratio for the rods and tubing, and

using the slope of the linear regression line and total stress/strain ratio to determine the plunger leakage rate LKG.

2. The method of claim 1 further including steps for determining in a well manager computer the net liquid production for a single stroke of said subsurface pump comprising the steps of

computing a pump card

determining S n and Σ(Δ(F)*Δ(t)) from the pump card, where Sn is the net stroke in inches of plunger stroke and Δ(F) is the change in axial load of the plunger,

determining the net liquid produced S lp at pump conditions for a single stroke of the pumping unit from the relationship,

S lp =S n −( LKG *(Σ(Δ( F )*Δ( t )))).

3. The method of claim 2 further including the step of determining in a well manager computer the net liquid produced S lst at stock tank conditions for a single stroke of the pumping unit from the relationship

S lst =F shrinkage *S ip

where F shrinkage is a shrinkage further representing the ratio of surface volume to pump volume for a given mass of material.

4. The method of claim 3 further comprising the step of computing in a well manager computer inferred daily production rate in stock tank barrels per day from the relationship,

Q d =(6.994 *ΣS ist )/( T p +T d )

where:

Q d is the inferred production rate [stock tank BPD]

T p is the cumulative producing time during the day [seconds]

T d is the cumulative down time during the day [seconds].

5. A method of determining traveling valve/plunger leakage rate in a subsurface pump comprising the steps of:

selecting a number of tests to perform,

for each selected test,

stopping the rod string at the surface during the upstroke,

determining the surface axial load on the rod string for a plurality of times until axial load has stabilized,

determining dF/dt from polished rod load vs time data, and

selecting a subset of the dF/dt vs axial load data for analysis,

applying linear regression using dF/dt as the dependent variable and axial load as the independent variable to derive a best fit line to the selected data,

calculating total stress/strain ratio for the rods and tubing, and

determining the plunger leakage rate LKG as a function of the slope of the linear regression line and the total stress/strain ratio.

6. The method of claim 5 further including steps for determining in a well manager computer the net liquid production for a single stroke of said subsurface pump comprising the steps of

computing a pump card

determining S n and Σ(Δ(F)*Δ(t)) from the pump card, where Sn is the net stroke in inches of plunger stroke and Δ(F) is the change in axial load of the plunger,

determining the net liquid produced S lp at pump conditions for a single stroke of the pumping unit from the relationship,

S lp =S n −( LKG *(Σ(Δ( F )*Δ( t )))).

7. The method of claim 6 further including the step of determining in a well manager computer the net liquid produced S lst at stock tank conditions for a single stroke of the pumping unit from the relationship

S lst =F shrinkage *S ip

where F shrinkage is a shrinkage further representing the ratio of surface volume to pump volume for a given mass of material.

8. The method of claim 7 further comprising the step of computing in a well manager computer inferred daily production rate in stock tank barrels per day from the relationship,

Q d =(6.994 *ΣS ist )/( T p +T d )

where:

Q d is the inferred production rate [stock tank BPD]

T p is the cumulative producing time during the day [seconds]

T d is the cumulative down time during the day [seconds].

9. A method for determining traveling valve/plunger leakage rate LKG in a subsurface pump comprising of the steps:

measuring actual production from a well over a specific period of time to produce a well production measurement,

coincident with the well production measurement, computing a downhole pump card [ 600 ] for each stroke of the subsurface pump,

for each stroke, calculating S n and Sum(Delta(F)*Delta(t)),

accumulating Sum(S n ) and Sum(Sum(Delta(F)*Delta(t))) for all strokes, and

determining plunger leakage rate using the relationship,

LKG =(Σ S n −(12354*(( V pf −V pi )/( F shrinkage *D 2 ))))/Σ(Σ(Δ( F )*Δ( t ))).

10. The method of claim 9 further including steps for determining in a well manager computer the net liquid production for a single stroke of said subsurface pump comprising the steps of

computing a pump card

determining S n and Σ(Δ(F)*Δ(t)) from the pump card, where Sn is the net stroke in inches of plunger stroke and Δ(F) is the change in axial load of the plunger,

determining the net liquid produced S lp at pump conditions for a single stroke of the pumping unit from the relationship,

S lp =S n −( LKG *(Σ(Δ( F )*Δ( t )))).

11. The method of claim 10 further including the step of determining in a well manager computer the net liquid produced S lst at stock tank conditions for a single stroke of the pumping unit from the relationship

S lst =F shrinkage *S ip

where F shrinkage is a shrinkage further representing the ratio of surface volume to pump volume for a given mass of material.

12. The method of claim 7 further comprising the step of computing in a well manager computer inferred daily production rate in stock tank barrels per day from the relationship,

Q d =(6.994 *ΣS ist )/( T p +T d )

where:

Q d is the inferred production rate [stock tank BPD]

T p is the cumulative producing time during the day [seconds]

T d is the cumulative down time during the day [seconds].

13. The method of claim 1 , 5 , or 9 further comprising steps to determine valve/plunger leakage volume (S LKG ) in a subsurface pump, comprising the steps of,

computing a pump card,

selecting a beginning time and end time from the card for determining plunger leakage,

selecting a reference baseline load,

for each point in the pump card between the selected beginning and ending times, calculating Δ(F) using the logic,

if (load( i )+load( i− 1))>2*baseline load) then

Δ( F )=((load( i )+( i− 1))/2)−baseline load,

otherwise,

Δ( F )=0,

accumulating ΣΔ(F)*Δ(t) for all points in the time range, and

determining plunger leakage volume according to the equation,

S LKG =(Σ(Δ( F )*Δ( t )))* LKG.

14. The method of claim 13 further including steps for determining in a well manager computer the net liquid production for a single stroke of said subsurface pump comprising

computing a pump card,

determining S n from the pump card

where Sn is the net stroke in inches of plunger stroke

determining the net liquid produced S lp at pump conditions for a single stroke of the pumping unit from the relationship

S lp =S n −S LKG .

15. The method of claim 14 further including the step of determining in a well manager computer the net liquid produced S lst at stock tank conditions for a single stroke of the pumping unit from the relationship

S lst =F shrinkage *S ip

where F shrinkage is a shrinkage further representing the ratio of surface volume to pump volume for a given mass of material.

16. The method of claim 15 further comprising the step of computing in a well manager computer inferred daily production rate in stock tank barrels per day from the relationship,

Q d =(6.994 *ΣS ist )/( T p +T d )

where:

Q d is the inferred production rate [stock tank BPD]

T p is the cumulative producing time during the day [seconds]

T d is the cumulative down time during the day [seconds].

Assignments (4)
SECURITY INTEREST Recorded May 26, 2021
From: RAVDOS HOLDINGS INC.
To: PNC BANK, NATIONAL ASSOCIATION
Reel/Frame 056362/0902 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 22, 2020
From: LUFKIN INDUSTRIES, LLC; BAKER HUGHES HOLDINGS LLC FKA BAKER HUGHES, A GE COMPANY, LLC FKA BAKER HUGHES INCORPORATED; BAKER HUGHES OILFIELD OPERATIONS, LLC; QUINN PUMPS CANADA LTD.
To: RAVDOS HOLDINGS INC.
Reel/Frame 053285/0640 →
CHANGE OF NAME Recorded Aug 7, 2014
From: LUFKIN INDUSTRIES, INC.
To: LUFKIN INDUSTRIES, LLC
Reel/Frame 033494/0400 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 20, 2011
From: MILLS, THOMAS M.
To: LUFKIN INDUSTRIES, INC.
Reel/Frame 026625/0114 →